14- The installation and adjustment of weighing device

14.1 The adjustment of simple weighing device


Microswitch is installed at the car bottom; when passengers come into the car, the car sinks and
overload or full-load will make this switch act.
After adjusting the fast running by commissioning staff and confirming landing call signal and
inner selection signal are normal, install and adjust the weighing device.
A. The installation of weighing device

62
(1) Elevator runs to the second floor leveling position
(2) Open the landing door of the first floor with triangular emergency key by installation
personnel.
(3) Find out the weighing device from packing box and prepare installation tools, then the
installation personnel comes into pit.
(4) Close landing door of the first floor by the outside installation personnel.
(5) Elevator runs to leveling position of the second floor at inspection speed by installation
personnel on car roof, stop the elevator and press emergency stop buttons on car roof and in
pit.
(6) Install the weighing device on the car frame plank assembly accoding to the following
picture by the installation personnel in pit.
(7) Connect one end of weighing device cable with inspection box on car roof by installation
personnel on car roof, the other end is passed along car wall to the installation personnel in
pit. Then the installation personnel in pit connect the cable with the overload switch and full
load switch.
B. The adjustment of weighing device
(1) The position of overload switch, full-load switch and half-load switch on weighing device
corresponding to the press plate at car bottom is installed by installation personnel in pit as following
picture:

Picture:simple weighing device(If there is any change, the appearance takes real
products as standard.)
(2) Put the weight equivalent to 90% rated load into car evenly by installation personnel
outside landing, then the installation personnel in pit adjust the position of full-load switch
7SQ1 and make it contact with the press plate at car bottom, and the switch acts. At this time,
63
calling box outside landing displays “FULL LOAD”, namely, the full-load switch has been
adjusted well.
(3) Put the weight equivalent to 100% rated load into car evenly by installation personnel
outside landing, then the installation personnel in pit adjust the position of over-load switch
4SQ1 and make it contact with press plate at car bottom, but the switch does not act. At this
time, one installation person outside landing comes into car and the switch acts. Meanwhile,
operation panel displays “OVER LOAD” and buzzer buzzs continuously. After the
installation personnel go out of car, “OVER LOAD” will disappear and the buzzer will stop
buzzing, namely, over-load switch has been adjusted well.
(4) After adjusting over-load switch and full-load switch well, the installation personnel outside
landing move the weight out of car and close landing door.
(5) Renew the emergency stop switches on car roof and in pit.
(6) The installation personnel on car roof make the elevator run to leveling position of the
second floor at inspection speed, then stop the elevator and press emergency stop buttons on
car roof.
(7) Open landing door on the first floor by installation personnel outside landing and the
people in pit get out. Close the landing door.
(8) The installation personnel on car roof renews the emergency stop button on car roof and
leaves car roof. Renew elevator’s running to be normal.
(9) Install half-load switch on the elevator which has power failure emergency function. Put
50% rated load in car when adjusting, the adjustment method is the same as above
mentioned.