Weekly Safety Meeting 01.03.2024 to 07.03.2024


1. Accidents/Derailments (Other Railway):
Date and Location Responsi
# Train Accident Type Prima facie Remarks
Time bility

2.1 Accidents/Derailments (SECR) :


Date and Locati Responsib
# Train Accident Type Prima facie Remarks
Time on ility
07.03.24 Jr.Scale
ITR During shunting of loco from line
ELE Officer
06:16 hrs Yard no. 4 to line no. 1 by taking off Rerailment
31377 level
Back Shunt Signal no. SH26, the -- done at
(Non SIMS (NAG) (WAG inquiry
loco got derailed by two wheels of 08:19 hrs
D-6) 9H/BIA) under
front trolley at Point no. 65B.
progress
09.03.24
ITR During shunting of loco plus 01
Diesel JAG Officer
01:20 hrs Yard spare LHB Coach No.161078 Rerailment
Loco level
from line no. 6 to line no. 1 on done at
(Non 36458 inquiry -
(NAG Shunt Signal no. SH26, the loco 03:19 hrs
SIMS D- (WDS/6/ under
) got derailed by two wheels of rear
6) MIB) progress
trolley at Point no. 65B.

2.2 Accidents/Derailments (SECR): Where Inquiry pending:


Date and
# Location Train Accident Type Prima facie Responsibility
Time

2.3 Accidents/Derailments (SECR): Where Inquiry completed during the week:


Date
#
and Location Train Accident Type Cause Responsibility
Time

3.0 UNUSUALS
Date and Location Nature Case Details Remarks
Time /Type Prima Facie Cause

3.1 Rail Fracture & Weld Failure:


Date and CTE
# Type Location Observation Detected by
time Remarks
2.

3.2 Summary of Unusuals (As on 01.03.24) – Not Due

3.3 Run Over Detail February 2024 (Below data are from Security Deptt./Hq) –
Not Due
4.1 Position of DFW (R), as on 07.03.24 (Below data are from TMS)
Opening Balance Accrual during Removal during Balance
the week the week
(A Route+Other) (A Route+Other) (A Route+Other) (A Route+Other)
0 01 01 0
BSP (0 + 0) (0 + 01) (0 + 01) (0 + 0)
0 0 0 0
R (0 + 0) (0 + 0) (0 + 0) (0 + 0)
0 0 0 0
NAG (0 + 0) (0 + 0) (0 + 0) (0 + 0)
0 01 01 0
Total (0 + 0) (0 + 01) (0 + 01) (0 + 0)

4.2 Rolling Block Programme Details From 02.03.2024 to 08.03.2024

Rolling Block Programme Detail (Bilaspur Division)


Routes > 30 GMT
Open Line Const./GSU/PSUs Overall
Dept. Hours Hours % Hours Hours % Hours Hours %
Demanded Granted Demanded Granted Demanded Granted
Engg. 580:25 492:20 85 32:45 27:15 83 613:10 519:35 85
TRD 141:10 122:10 87 22:15 19:25 87 163:25 141:35 87
S&T 260:25 226:25 87 NIL NIL NIL 260:25 226:25 87
Total 982:00 840:55 86 55:00 46:40 85 1037:00 887:35 86

Rolling Block Programme Detail (Raipur Division)


Routes > 30 GMT
Open Line Const./GSU/PSUs Overall
Dept. Hours Hours Hours Hours Hours Hours
Demanded Granted % % %
Demanded Granted Demanded Granted
Engg. 300:50 248:50 82.7% 00:45 00:45 100.0% 301:35 249:35 82.8%
TRD 47:45 32:10 67.4% 00:00 00:00 0.0% 47:45 32:10 67.4%
S&T 153:00 112:28 73.5% 00:00 00:00 0.0% 153:00 112:28 73.5%
Total 501:35 393:28 78.4% 00:45 00:45 100.0% 502:20 394:13 78.5%

Rolling Block Programme Detail (Nagpur Division)


Routes > 30 GMT
Open Line Const./GSU/PSUs Overall
Dept. Hours Hours Hours Hours Hours Hours
% % %
Demanded Granted Demanded Granted Demanded Granted
Engg. 160:00 135:40 84.79 0:00 0:00 - 160:00 135:40 84.79
TRD 93:45 75:20 80.36 17:30 5:30 31.43 111:15 80:50 72.66
S&T 415:14 341:14 82.18 0:00 0:00 - 415:14 341:14 82.18
Total 668:59 552:14 82.55 17:30 5:30 31.43 686:29 557:44 81.24
Rolling Block Programme Detail (Bilaspur Division)
Routes < 30 GMT
Open Line Const./GSU/PSUs Overall
Hours Hours Hours Hours Hours Hours
% % %
Demanded Granted Demanded Granted Demanded Granted
Engg. 105:40 104:05 99 50:30 49:40 98 156:10 153:45 98
TRD 07:00 05:35 80 02:30 02:15 90 09:30 07:50 82
S&T 134:20 129:05 96 NIL NIL NIL 134:20 129:05 96
Total 247:00 238:45 97 53:00 51:55 98 300:00 290:40 97

Rolling Block Programme Detail (Raipur Division)


Routes < 30 GMT
Open Line Const./GSU/PSUs Overall
Hours Hours Hours Hours Hours Hours
% % %
Demanded Granted Demanded Granted Demanded Granted
Engg. 20:30 17:45 86.6% 00:00 00:00 0.0% 20:30 17:45 86.6%
TRD 0:00 0:00 #DIV/0! 22:30 22:30 100.0% 22:30 22:30 100.0%
S&T 53:15 51:45 97.2% 00:00 00:00 0.0% 53:15 51:45 97.2%
Total 73:45 69:30 94.2% 22:30 22:30 100.0% 96:15 92:00 95.6%

Rolling Block Programme Detail (Nagpur Division)


Routes< 30 GMT
Open Line Const./GSU/PSUs Overall
Hours Hours Hours Hours Hours Hours
% % %
Demanded Granted Demanded Granted Demanded Granted
Engg. 113:30 113:30 100.00 0:00 0:00 - 113:30 113:30 100.00
TRD 33:10 28:55 87.19 0:00 0:00 - 33:10:0 28:55 87.19
S&T 199:34 199:34 100.00 0:00 0:00 - 199:34 199:34 100.00
Total 346:14 341:59 98.77 0:00 0:00 - 346:14 341:59 98.77

5.1 Overdue status of USFD“AT-Weld ”(New + Old) Testing on Main Line, as on dt.07.03.2024
Balance on Accrual during Testing done Balance on
Division Net Progress
01.03.24 this week during this week 07.03.24
BSP 0 1166 1141 25 25 nos. increased
R 0 540 540 0 0
NAG 0 936 936 0 0
Total 0 2642 2617 25 0
These data are from TMS
5.2 Overdue status of USFD Rail Testing on Main Line, as on dt.07.03.2024
Accrual
Balance on Testing done Balance on
during this
Division 01.03.24 during this 07.03.24 Net Progress
week
(T Km) week (T Km) (T Km)
(T Km)
BSP 10.000 246.937 244.207 12.73 2.73 T Km increased
R 0 73.539 73.539 0 0
NAG 0 93.649 93.649 0 0
Total 0 414.125 411.395 12.73 2.73 T Km increased
These data are from TMS

5.3 BALLAST REQUIREMENT FOR SUMMER IN SECR AS ON Dt. 07.03.24


Progress Cumulative No. of
Progress Balance
Scope this week Progress BOBY
Division ADEN previous week (In N
(In N Bobby) (In N (In N in
(In N Bobby) Bobby)
Bobby) Bobby) Division
BRJN 130 15 13 35 95
RIG 211 0 20 20 191
CPH 337 0 30 30 307
BSP 218 45 24 205 13
BSP PND 276 56 8 98 178 187
SDL 40 0 0 0 40
UMR 198 0 0 114 84
MDGR 308 0 3 34 274
Total for BSP 1718 116 98 536 1182
BYT 267 0 20 81 186
BIA-I 805 32 47 205 600
R TRACK 90 0 0 28 62 172
BIA-II 417 4 35 199 278
Total for R 1579 36 102 513 1126
DGG 150 0 0 24 126
G 103 0 0 95 08
TMR 170 0 32 63 107
Tr.NGP 100 19 0 68 32
NGP 118
NAB 460 39 0 95 365
NIR 265 0 28 151 114
CWA 436 28 0 42 394
Total for NGP 1684 86 60 538 1146
Total for SECR 4981 238 260 1127 3454 477
5.4 Track identified for machine tamping based on latest TRC and OMS run
(BSP – TRC: Jan & Feb-24 (61%) &BSP –OMS- Feb-24 (63%);
R –TRC – Jan & Feb 24 (51%) & OMS – Dec-23 (94%)
NAG –TRC – Feb 24 (71%);OMS –Feb-24 (74%))
 Note : % shown are % recording done at speed of above than maximum permissible
speed minus 10 Kmph.
No. of Machines
Progress this week
km available for Plain
at Balance km
Progress tamped at track tamping
Km for tamping
Division previous Other identified
Identified at identified
week Identified than location Open Cons./
location Total
location identified (Cum) line Other
location
BSP 228.259 24.96 18.57 34.89 98.8 129.459 07 01/01 09
R 140.4 1.8 9 11.1 59.6 80.8 2 3 5
NAG 278 15 21 6.363 114 164 3 0 3
Total 646.659 41.76 48.57 52.353 272.4 374.259 12 3 17

5.5 Turnout identified for UNIMAT tamping as per latest TRC and OMS run
(BSP – TRC: Jan & Feb-24 (61%) & BSP –OMS- Feb-24 (63%);
R –TRC – Jan & Feb 24(51%) &OMS – Dec-23 (94%)
NAG –TRC – Feb 24 (71%);OMS –Feb-24 (74%))
 Note : % shown are % recording done at speed of above than maximum permissible
speed minus 10 Kmph.
Nos. of No. of Machines
Progress this
turnout Balance available for
week at
Nos. of Progress tamped turnout Turnout tamping
Division Turnout previous Other at tamping at
identified week Identified than identified identified Open Cons./
Total
location identified location location line Other
location (Cum)
BSP 296 02 07 02 17 279 02 0 02
R 254 14 11 0 70 184 2 0 2
NAG 226 4 7 1 28 198 2 0 2
Total 776 20 25 3 115 661 6 0 6
5.6 Deep Screening of Turnout
Cumulative
Progress during
progress as on
Sr.DEN/ Target the week
S.N. Div. ADEN date: 07.03.24 Balance Remarks
DEN (Nos.)
Machine Manual Machine Manual
1 BRJN 20 0 0 0 0 20
2 EAST RIG 15 0 0 0 0 15
3 CPH 25 0 0 0 0 25
4 BSP 25 0 12 0 12 13
CENTRAL
5 BSP PND 20 0 0 0 0 20
6 SDL 15 0 0 0 0 15
7 NORTH UMR 10 0 0 0 0 10
8 MDGR 20 0 0 0 0 20
TOTAL 150 0 12 0 12 138
1 Sr.DEN (I) BYT 40 0 0 0 0 40
2 R BIA-I 20 0 0 0 31 -11
3 R Tr.R 0 0 2 0 15 -15
4 DEN (II) R BIA-II 40 0 10 0 19 21
TOTAL 100 0 12 0 65 35
1 Track 49 0 0 1 0 48
Central
2 TMR 16 0 0 2 3 11
3 G 3 0 0 0 0 3
East
4 DGG 6 0 0 0 5 1
NAG
5 NIR 8 0 0 0 5 3
North
6 CWA 0 0 0 0 0 0
7 South NAB 18 0 0 0 0 18
TOTAL 100 0 0 3 13 84
SECR TOTAL 250 0 24 3 90 257

5.7 Bridges identified for attention as per latest TRC and OMS run
(BSP – TRC: Jan & Feb-24 (61%) & BSP –OMS-Feb-24 (63%);
R – TRC – Jan & Feb 24 (51%)&OMS – Dec-23 (94%)
NAG –TRC – Feb 24 (71%);OMS –Feb-24 (74%))
 Note : % shown are % recording done at speed of above than maximum permissible
speed minus 10 Kmph.
Nos. of Nos. of bridges Balance
Division Progress Progress
bridges attended (Cum)
previous week this week
identified
BSP 36 15 0 36 0
R 1 1 0 1 0
NAG 34 18 16 34 0
Total 71 34 16 71 0
5.8 Weekly progress of removal of Cracked Sleeper
Scope Cumulative
Progress(Km) Balance Balance
Division (km) progress (km)
P-1 P-2 P-3 Previous This Progress Progress
(As on (As on
week week total (km) P-1(km)
31.07.22) 07.03.24)
BSP 409.12 139.42 67.61 202.08 6.68 5.61 198.415 210.705 30.067
R 39.07 15.06 10.963 13.048 0 0 35.722 3.349 0
NAG 49.47 0.21 0.12 49.14 0.768 0.727 37.735 11.735 0
Total 497.66 154.69 80.69 262.27 7.448 6.337 271.872 225.789 30.067
Remarks,P-1Section:
BSP:JSG-CPH,CPH-BSP,BSP-PND,APR-NKJ,BRH-SJQ,
R:BSP-DPH,DGS-NPI, BIA Yd, URK Yd, R-MNDH,GDZ-KYS.
NAG:

5.9 Details of TSR for more than 30 days over SECR as on 07.03.2024

List of TSR more than 30 days over Bilaspur Division


Date of Revised
SN Division Details of TSR Old TDC
Imposition TDC
JSG-CPH UP LINE
1 BSP JSG-IB-75KMPH-U/C TRACK [BCM SITE] 07.10.2023 15.03.2024 31.03.2024
2 BSP LJKR-BPH-45 KMPH U/C TRACK 27.01.2024 10.03.2024 20.03.2024
HGR-YD E/E: 75 KMPH -UC TRACK+ SCANTY
3 BSP 01.11.2023 15.03.2024 31.03.2024
BALLAST(BCM SITE)
KRL-RIG: 45 KMPH - DUE TO EXCAVATION OF WALL
4 BSP 01.12.2023 20.03.2024 31.03.2024
NEAR UP
5 BSP KRL-RIG: 75 KMPH-BR-121 TRACK UNEVENESS 12.07.2023 28.02.2024 31.03.2024
CPH-BSP UP LINE
6 BSP CPH-NIA-50 KMPH- CRACK IN SLP BR-46 11.10.2023 31.12.2023 31.03.2024
7 BSP AKT-YD W/E: 45 KMPH- CACKED UP CUSHION 10.01.2024 31.03.2024 -
JSG-CPH DN LINE
RIG-KRL- 45 KMPH-METAL LOSS & HEAVY
8 BSP 06.12.2022 28.02.2024 31.03.2024
CORROSION ON BR NO. 121
9 BSP KRL-JMG- 75 KMPH- MISALIGNMENT ON BR-136 26.07.2023 30.06.2024 -
10 BSP JMG-YD-75 KMPH- SCANTY BALLAST 20.11.2023 15.03.2024 31.03.2024
11 BSP BPH- YD- 75 KMPH - LESS CUSHION 05.08.2023 28.02.2024 31.03.2024
12 BSP BPH- YD- 75 KMPH -LESS CUSHION 05.08.2023 28.02.2024 31.03.2024
13 BSP IB-JSG-75 KMPH-UC TRACK (BCM SITE) 19.09.2023 15.03.2024 31.03.2024
CPH-BSP DN LINE
14 BSP NIA-CPH -75 KMPH-CRACK IN PIER BR-46 29.09.2023 28.02.2025 -
CPH-BSP MID LINE
15 BSP CPH YD W/E -75 KMPH-U/C TRACK[TWS] 29.09.2023 20.03.2024 31.03.2024
JSG-CPH 3RD LINE
LJKR-BRJN- 75KMPH-MISALIGNMENT OF X-LEVEL
16 BSP 17.10.2023 15.03.2024 31.03.2024
PT NO-105A
17 BSP IB-JSG-30KMPH -PILING WORK ON BR. NO-184 16.09.2023 28.02.2024 31.03.2024
GAD-CPH UP LINE
18 BSP KBS-KRBA - 45 KMPH-BR. 63 PIER CRACK 08.09.2023 10.11.2023 28.02.2025
GAD-CPH DN LINE
19 BSP PLAU-YD-75 KMPH-UC TRACK 12.02.2023 28.02.2024 31.03.2024
BSP-SDL UP LINE
20 BSP BSP-USL -75 KMPH - UC TRACK 04.02.2023 29.02.2024 31.03.2024
21 BSP GTK-KLTR-20 KMPH-TSR 19.01.2024 15.03.2024 31.03.2024
22 BSP KLTR-KGB-45 KMPH-UC TRACK (TRS SITE) 19.01.2024 15.03.2024 31.03.2024
23 BSP KLTR-KGB-75 KMPH-UC TRACK (TRS SITE) 19.01.2024 15.03.2024 31.03.2024
24 BSP PND-HRB-45 KMPH - UC TRACK AT TRT SITE 23.01.2024 31.03.2024 -
25 BSP PND-HRB-45KMPH-UC TRACK AT TRT SITE 05.02.2024 31.03.2024 -
BSP-SDL DN LINE
26 BSP APR-CLF: 45 KMPH-UC TRACK AT TRT SITE 10.01.2024 10.03.2024 31.03.2024
27 BSP APR-CLF: 45 KMPH-UC TRACK AT TRT SITE 10.01.2024 31.03.2024 -
28 BSP VKR-HRB: 45 KMPH-UC TRACK + TRT WORK 14.01.2024 10.03.2024 31.03.2024
29 BSP HRB-YD-45 KMPH - PRE WORK OF TRT 07.02.2024 31.03.2024 -
SDL-KTE UP LINE
30 BSP VYK-RPD-95 KMPH-BR 206 REPAIR 01.04.2023 28.02.2024 31.03.2024
KTE-SDL DN LINE
31 BSP RPD-VYK- 30 KMPH -EARTH CUTTING BY JCB M/C 26.12.2023 15.03.2024 31.03.2024
VYK-CHD -75 KMPH - SECOND TAMPING DONE BY
32 BSP 05.12.2023 20.03.2024 31.03.2024
MACHINE
BRND-APR UP LINE
33 BSP MZH-APR- 75KMPH-JACKETING WORK ON BR.-01 17.06.2023 31.12.2023 31.03.2024
APR-BRND DN LINE
34 BSP BJRI-BRND -30 KMPH-BR NO 53 REBUILDING WORK 05.01.2023 28.02.2024 31.03.2024
BRND-ABKP SINGLE LINE
35 BSP BRH-KTO-75 KMPH- U/C TRACK AT TSR SITE 22.11.2023 20.03.2024 31.03.2024
36 BSP KJZ-BSPR- 75KMPH - UC TRACK [TSR SITE] 09.11.2023 28.02.2024 31.03.2024
37 BSP KJZ-BSPR- 75 KMPH - UC TRACK [TSR SITE] 09.11.2023 28.02.2024 31.03.2024
38 BSP BSPR-YD L-02- 45KMPH-UC TRACK[TSR SITE] 09.11.2023 28.02.2024 31.03.2024
39 BSP BSPR-KLPG- 45 KMPH - UC TRACK[TSR SITE] 09.11.2023 28.02.2024 31.03.2024
40 BSP BSPR-KLPG-30KMPH-HECK RAIL NOT PROVIDED 09.11.2023 28.02.2024 31.03.2024

Details of TSR for more than 30 days over R Divn as on 07.03.24 - NIL

Details of TSR for more than 30 days over NAG Divn as on 07.03.24.
Date of Revised
SN Details of TSR Old TDC
Imposition TDC
KWN Yd 3rd line, Km: 1023/32-1022/32, SR: 75 kmph
1 25.12.23 15.02.24 15.03.24
Unconsolidated track in MDS site.
AGN Yd DN line, Km:978/36-978/34, SR: 75 kmph due
2 05.02.24 10.03.24 20.03.24
to UML peak of Twist.
GDM-AGN UP, Km: 982/19-21, SR: 20 kmph Launching
3 08.12.23 20.01.24 17.03.23
of relieving girder at LC.no.499
GDM-AGN 3rd line, Km: 982/18-16, SR: 20 kmph due to
4 27.01.24 06.03.24 17.03.24
Box Pushing.
KNHN-DKU, Km: 1121/1-1122/11, SR: 75 kmph due
5 23.01.24 15.03.24
Unconsolidated Track.
GDM-AGN DN line, Km: 982/20-18, SR: 20 kmph
6 06.12.23 20.01.24 17.03.24
Launching of releving girder at LC.no.499
ULA-BDKD SL, Km: 1289/8-10, SR: 30 kmph due to
7 20.12.23 18.02.24 31.03.24
Strengthening of Girder Bridge no. 78.
KAV-KRDI UP line, Km: 2 KRD/5-7KRD/3, SR: 65 kmph
8 18.01.24 20.03.24
due to Unconsolidated Track.
KAV-KRDI UP line, Km: 7 KRD/3-7KRD/5, SR: 30 kmph
9 18.01.24 20.03.24
due to Destressed Track.
KAV-KRDI UP line, Km: 7 KRD/5-8KRD/25, SR: 45
10 18.01.24 20.03.24
kmph due to Unconsolidated Track.
KAV-KRDI UP line, Km: 8 KRD/25-9KRD/7, SR: 30
11 18.01.24 20.03.24
kmph due to Cross Level Variation.
KAV-KRDI DN, Km: 1 KRD/6-2KRD/6, SR: 30 kmph
12 27.12.23 15.02.23 31.03.24
due to Unconsolidated Track
KAV-KRDI DN, Km: 2 KRD/6-8 KRD/10, SR: 65 kmph
13 27.12.23 15.02.23 31.03.24
due to Unconsolidated Track
KAV-KRDI DN, Km: 8 KRD/10-9KRD/6, SR: 30 kmph
14 27.12.23 15.02.23 31.03.24
due to Unconsolidated Track
NAB-TUD, Km: 1141/09-1142/18, SR: 45 kmph due to
15 27.01.24 31.03.24
less cushion
LDE-KLOD , Km: 1346/8-10, SR: 30 kmph
16 14.11.23 17.01.24 31.03.24
Strengthening of Girder Br No. 247.
PDE-NIR , Km: 1129/10J-1130/10J, SR: 80 kmph
17 28.09.23 15.11.23 20.03.24
Unconsolidated Track
BMC-BDKD SL, Km: 1294/23-1295/5, SR: 20 kmph
18 28.04.22 31.12.23 31.03.24
Br.No.94 repairing work
31.03.24
19 NAB Yd L1, Km: 1133/16-17, SR: 15 kmph 31.12.22 30.11.23 T-28 m/c
required)

5.10 Leaning mast & Critical Implantation status Upto 01.03.24

Progress
Population Condonation Balance
(Scope) as Cumm under w.r.t
Div. Work status
on Prog. During process Scope
Cumm.
01.04.23 Upto the (if any) (b-e)
(c+d)
previous month
Month
a b c d e f g
Leaning : Work sanctioned for 199 nos in
Umbrella work 22-23. Tender opened on
03.05.23. No offer received. Retender done,
Tender opened on 05.06.23 & discharged.
Fresh Tender opened on 09.10.23 and
BSP 1859 305 26 331 -- 1528 under TC.
Critical : 751 nos. sanctioned in 6 different
works (2 works in Umbrella 21-22, 3 works
in Engineering work of 19-20 & 1 work in
MWP -21-22) . Work awarded in 6 different
contracts section wise for 751 nos.
Leaning : 150 nos. sanctioned.
i) 100 nos. sanctioned in Umbrella work 21-
22 and work awarded.
ii) 50 nos. Sanctioned in MWP 22-23 and
R 578 222 41 263 -- 315 work awarded.

Critical : 109 nos. sanctioned in Umbrella


work 18-19 and work awarded.
Leaning : 311 nos. sanctioned in LB-18-19
and work awarded.

NGP 631 159 24 183 -- 448 Critical : 196 nos. sanctioned in 2 works
(Umbrella work 20-21 and MWP-19-20) &
work awarded in two different contracts.

SECR 3068 686 91 777 -- 2291


5.11 Summary of Deficiencies noted during Joint Point & Crossing Inspection
Deficiencies pending for Deficiencies pending for Deficiencies pending >2
Division
less than 01 month 01-02 months month
BSP 42 21 0
R 22 0 0
NAG 66 1 0
Total (SECR) 130 22 0

5.12 Details of GPS tracker - NotDue


5.13 STATUS OF LC GATES
No. of LC-Gates of
TVU>20,000
S.N Divn Non Action Plan for interlocking of LC
TDC
. . Tota Interlo - Gates of TVU>20,000
LC No.
l cked Interloc
ked
May be interlocked with CPH-RIG
297 (KDTR-BEF) AT Auto-Signalling work, if gate will
1 BSP 80 79 1 _
KM 599/17-19 not be closed against ROB/RUB
work.
389(BYT-HN) AT For closure
RUB in lie of LC gate sanctioned
KM 774/13-15 March'24
in Umbrella Work 20-21.
(Engg)
For closure
393(HN-TLD) AT RUB in lie of LC gate sanctioned
March'24
KM 784/4-6 in Umbrella Work 20-21.
(Engg)
Interlocking to be done by GSU
394(HN-TLD) AT
2 R 52 47 5 during commissioning of Auto Sig Dec'24 (GSU)
KM 785/21-23
work in HN-URK section.
Interlocking to be done by GSU
406(SLH-MDH) AT
during commissioning of Auto Sig Dec'24 (GSU)
KM 807/7-9
work in HN-URK section
For closure
409(SLH-MDH) AT RUB in lie of LC gate sanctioned
March'24
KM 814-23-25 in Umbrella Work 20-21.
(GSU)
GCF-4(G-HDM) AT
KM 1007/8-9
GCF-125(MME-
RUB/ROB in lie of LC gate
KEZ) AT KM _
1206/13 sanctioned in MWP 23-24.
TT-33(DGBZ-TRDI)
AT KM 1085/12-13
RUB/ROB in lie of LC gate
GJ-149(GRG-BUQ)
3 NAG 106 99 7 Proposed in Umbrella Work 24- _
AT KM 1216/8-9
25.
RUB/ROB in lie of LC gate
GCF-46(DEW-AJU)
sanctioned in Umbrella Work 21- _
AT KM 1080/3-4
22.
NI-77(MIB) AT KM
Division may propose MWP _
1242/5
under DRM in power which is
GCF-1(G-HDM) AT
not covered under ROB/RUB. _
KM 1003/6-7
Grand Total 238 225 13

6. Important Safety Works (Upto February'24) – Not Due


7. 1 Summarized Crew Long Hrs (More than 12 Hrs) of SECR from 25.02.24 to
09.03.24 (14 days period) –
% of more than
>12 Hrs from
Total 12 hrs from >12 Hrs from Sign % of more than 12 hrs
Div. Sign ON to
TOS Sign ON to ON to WS from Sign ON to WS
Sign OFF
Sign OFF
BSP 17042 1249 7.33 159 0.93
R 6752 295 4.37 57 0.84
NAG 7565 549 7.26 24 0.32
SECR 31359 2093 6.67 240 0.77

Summarized Crew Long Hrs of SECR, Lobby Wise from 25.02.24 to 09.03.24 (14 days
period) –
% of more % of more
>12 Hrs from >12 Hrs from
than 12 hrs of than 12 hrs of
Division Lobby Total TOS Sign ON to Sign ON to
Sign ON to Sign ON to
Sign OFF WS
Sign OFF WS
AKT 276 7 2.54 1 0.36
BJRI 914 38 4.16 8 0.88
BRJN 2116 172 8.13 17 0.80
BSP 3766 326 8.66 30 0.80
KHS 819 95 11.60 11 1.34
KRBA 2192 96 4.38 9 0.41
BSP
PND 663 19 2.87 2 0.30
RIG 2410 215 8.92 38 1.58
SDL 2853 209 7.33 42 1.47
SJQ 218 0 0.00 0 0.00
USL 815 72 8.83 1 0.12
TOTAL 17042 1249 7.33 159 0.93
BYT 1187 68 5.73 15 1.26
DBEC 4136 153 3.70 33 0.80
DRZ 321 7 2.18 0 0.00
R DURG 17 0 0.00 0 0.00
MXA 22 0 0.00 0 0.00
R 1069 67 6.27 9 0.84
TOTAL 6752 295 4.37 57 0.84
CWA 116 3 2.59 0 0.00
DGG 2300 116 5.04 4 0.17
G 2206 152 6.89 4 0.18
JESG 188 1 0.53 0 0.00
KAV 1537 184 11.97 8 0.52
NAG
NAB 128 14 10.94 3 2.34
NIR 344 3 0.87 0 0.00
SCLN 708 76 10.73 5 0.71
TMR 38 0 0.00 0 0.00
TOTAL 7565 549 7.26 24 0.32
Fortnightly Sign ON to Sign OFF (>12 hours %)
Jan- Mar-
S.No. Div. OCT-2 OCT-3 NOV-1 NOV-2 Dec- 1 Dec- 2 Jan- 1 Feb-1 Feb-2
2 1
1 BSP 27.77 26.12 24.48 28.17 26.30 19.85 10.62 9.51 8.89 8.11 7.33
2 R 7.10 9.15 6.86 6.69 6.57 4.44 4.51 7.09 3.34 3.14 4.37
3 NAG 15.35 12.23 11.15 11.07 9.70 5.91 4.18 6.96 7.37 7.12 7.26
4 SECR 20.39 18.19 17.43 19.53 18.06 13.27 7.82 8.39 7.39 6.83 6.67

30.00

25.00

20.00
BSP
15.00
NAG
10.00 R
SECR
5.00

0.00
OCT-2 OCT-3 NOV-1 NOV-2 Dec- 1 Dec- 2 Jan- 1 Jan- 2 Feb-1 Feb-2 Mar-
1

Fortnightly SignON to Wheel Stop (>12 hours %)


Dec- Dec- Jan- Jan- Mar-
S.No Div. OCT-2 OCT-3 NOV-1 NOV-2 Feb-1 Feb-2
1 2 1 2 1
1 BSP 1.60 1.32 1.37 1.86 1.45 1.21 1.06 0.89 0.98 1.14 0.93
2 R 0.35 0.70 0.61 0.60 0.74 0.55 0.46 0.88 0.48 0.56 0.84
3 NAG 1.37 0.96 0.61 0.51 0.58 0.39 0.28 0.51 0.33 0.36 0.32
4 SECR 1.27 1.09 1.02 1.26 1.09 0.87 0.75 0.80 0.79 0.82 0.77

2.00
1.80
1.60
1.40
1.20
BSP
1.00
NAG
0.80
R
0.60
0.40 SECR

0.20
0.00
OCT-2 OCT-3 NOV-1 NOV-2 Dec- 1 Dec- 2 Jan- 1 Jan- 2 Feb-1 Feb-2 Mar-
1
Summarized Crew Long Hrs (More than 14 Hrs) of SECR from 25.02.24 to 09.03.24
(14 days period) –
% of more than
>14 Hrs from
Total 14 hrs from >14 Hrs from Sign % of more than 14 hrs
Div. Sign ON to
TOS Sign ON to ON to WS from Sign ON to WS
Sign OFF
Sign OFF
BSP 17042 325 1.91 15 0.09
R 6752 56 0.83 6 0.09
NAG 7565 118 1.56 3 0.04
SECR 31359 499 1.59 24 0.08

Summarized Crew Long Hrs of SECR, Lobby Wise from 25.02.24 to 09.03.24 (14 days
period) –
% of more % of more
>14 Hrs from >14 Hrs from
than 14 hrs of than 14 hrs of
Division Lobby Total TOS Sign ON to Sign ON to
Sign ON to Sign ON to
Sign OFF WS
Sign OFF WS
AKT 276 1 0.36 0 0.00
BJRI 914 9 0.98 1 0.11
BRJN 2116 59 2.79 4 0.19
BSP 3766 85 2.26 0 0.00
KHS 819 21 2.56 0 0.00
KRBA 2192 23 1.05 1 0.05
BSP
PND 663 3 0.45 0 0.00
RIG 2410 33 1.37 5 0.21
SDL 2853 75 2.63 4 0.14
SJQ 218 0 0.00 0 0.00
USL 815 16 1.96 0 0.00
TOTAL 17042 325 1.91 15 0.09
BYT 1187 10 0.84 2 0.17
DBEC 4136 27 0.65 4 0.10
DRZ 321 0 0.00 0 0.00
R DURG 17 0 0.00 0 0.00
MXA 22 0 0.00 0 0.00
R 1069 19 1.78 0 0.00
TOTAL 6752 56 0.83 6 0.09
CWA 116 0 0.00 0 0.00
DGG 2300 23 1.00 0 0.00
G 2206 31 1.41 1 0.05
JESG 188 1 0.53 0 0.00
KAV 1537 40 2.60 2 0.13
NAG
NAB 128 8 6.25 0 0.00
NIR 344 0 0.00 0 0.00
SCLN 708 15 2.12 0 0.00
TMR 38 0 0.00 0 0.00
TOTAL 7565 118 1.56 3 0.04
Fortnightly Sign ON to Sign OFF (>14 hours %)
Dec- Dec- Jan- Jan- Mar-
S.No Div. OCT-2 OCT-3 NOV-1 NOV-2 Feb-1 Feb-2
1 2 1 2 1
1 BSP 12.33 10.64 9.55 12.48 11.31 7.65 3.26 2.59 2.10 2.03 1.91
2 R 1.46 2.33 1.25 1.20 1.24 0.89 1.05 1.42 0.71 0.60 0.83
3 NAG 3.73 2.47 1.89 2.31 1.85 0.78 0.67 1.09 1.58 1.48 1.56
4 SECR 7.91 6.77 5.88 7.64 6.86 4.58 2.19 1.99 1.69 1.59 1.59

14.00

12.00

10.00

8.00 BSP

6.00 NAG
R
4.00
SECR
2.00

0.00
OCT-2 OCT-3 NOV-1 NOV-2 Dec- 1 Dec- 2 Jan- 1 Jan- 2 Feb-1 Feb-2 Mar-
1

Fortnightly Sign ON to Wheel Stop (>14 hours %)


Dec- Dec- Jan- Jan- Mar-
S.No Div. OCT-2 OCT-3 NOV-1 NOV-2 Feb-1 Feb-2
1 2 1 2 1
1 BSP 0.16 0.11 0.09 0.19 0.07 0.06 0.12 0.11 0.08 0.11 0.09
2 R 0.03 0.09 0.00 0.05 0.06 0.03 0.03 0.01 0.05 0.05 0.09
3 NAG 0.08 0.04 0.00 0.04 0.03 0.04 0.00 0.01 0.06 0.09 0.04
4 SECR 0.11 0.09 0.05 0.12 0.06 0.05 0.07 0.06 0.07 0.09 0.08

0.20
0.18
0.16
0.14
0.12
BSP
0.10
NAG
0.08
R
0.06
SECR
0.04
0.02
0.00
OCT-2 OCT-3 NOV-1 NOV-2 Dec- 1 Dec- 2 Jan- 1 Jan- 2 Feb-1 Feb-2 Mar-
1
Average PDD over SECR from 17.12.23 to 30.12.23 (14 days period)

17.12.23 31.12.23 14.01.24 28.01.24 11.02.24 25.02.24


to to to to to to
30.12.23 13.01.24 27.01.24 10.02.24 24.02.24 09.03.24

BSP 2:05 2:00 2:01 1:59 1:45 1:33


KRBA 1:56 1:53 1:54 1:59 1:47 1:40
BSP RIG 1:35 1:27 1:21 1:27 1:26 1:24
BRJN 1:29 1:32 1:35 1:41 1:43 1:36
SDL 1:21 1:22 1:20 1:30 1:27 1:20
Avg. BSP Div. 1:47 1:44 1:42 1:45 1:39 1:30
R BMY 1:00 1:02 0:57 1:02 1:01 1:04
Avg. R Div. 1:12 1:12 1:06 1:12 1:11 1:13
NAG G 1:15 1:05 1:00 0:59 1:03 1:01
Avg. NAG Div. 1:08 1:07 1:05 1:05 1:08 1:06

Date Wise Avg.


1:22 1:21 1:17 1:34 1:34 1:25
SECR

PDD of BSP Division


2:24
2:09
1:55
1:40
1:26
In Hours

1:12
0:57
0:43
0:28
0:14
0:00
17.12.23 to 31.12.23 to 14.01.24 to 28.01.24 to 11.02.24 to 25.02.24 to
30.12.23 13.01.24 27.01.24 10.02.24 24.02.24 09.03.24
BSP 2:05 2:00 2:01 1:59 1:45 1:33
KRBA 1:56 1:53 1:54 1:59 1:47 1:40
RIG 1:35 1:27 1:21 1:27 1:26 1:24
BRJN 1:29 1:32 1:35 1:41 1:43 1:36
SDL 1:21 1:22 1:20 1:30 1:27 1:20
PDD of BMY (DBEC) Lobby
1:06
1:03
In Hours

1:00
0:57
0:54
0:51
17.12.23 to 31.12.23 to 14.01.24 to 28.01.24 to 11.02.24 to 25.02.24 to
30.12.23 13.01.24 27.01.24 10.02.24 24.02.24 09.03.24
BMY 1:00 1:02 0:57 1:02 1:01 1:04

PDD of G Lobby
1:26
1:12
0:57
In Hours

0:43
0:28
0:14
0:00
17.12.23 to 31.12.23 to 14.01.24 to 28.01.24 to 11.02.24 to 25.02.24 to
30.12.23 13.01.24 27.01.24 10.02.24 24.02.24 09.03.24
G 1:15 1:05 1:00 0:59 1:03 1:01

7. 2 Summarized Guard Long Hrs of SECR from 11.02.24 to 24.02.24 (14 days period)
– Not Due

7.3 Cases of RHQ of Crew–


Division Period No. of Cases of RHQ

BSP 02.03.24-08.03.24 132


R 02.03.24-08.03.24 54
NAG 02.03.24-08.03.24 132
Total 318

BSP RHQ Details


No Bed For Shuttling Personal
Duration Total RHQ No Authority
Available Balancing TO reason
Feb 05 – Feb 11 165 21 116 0 23 5
Feb 12 – Feb 18 192 36 122 0 22 12
Feb 19 – Feb 25 153 33 107 0 0 13
Feb 26 – Mar 01 180 27 138 0 12 3
Mar 02 – Mar 08 132 23 95 0 4 10
Lobby KRBA BRJN BJRI SJQ BSP RIG TOTAL
No bed
11 06 02 02 01 01 23
available

No. of No. of
Running
Division additional additional Action Plan/Augmentation TDC
Room
Rooms Beds
BSP 25 50 Work in progress (40%) 31.12.24
8 31.03.24
RIG 4 4 Rooms -WIP (50%)
(Provided)
10 nos bed with Mattress
BRJN 5 10 Completed
BSP recd.
Proposal under progress
AKT 25 50
from CONST/Fund.
Proposal under progress
SDL 5 10 -
from CONST/Fund

R RHQ Details
No Bed For Shuttling Personal
Duration Total RHQ No Authority
Available Balancing TO reason
Feb 05 – Feb 11 49 14 26 6 0 3
Feb 12 – Feb 18 57 16 37 1 0 3
Feb 19 – Feb 25 60 6 44 2 0 8
Feb 26 – Mar 01 62 6 43 6 0 7
Mar 02 – Mar 08 54 5 32 13 0 4

Lobby BMY RSD Total


No Bed Available 4 1 5

No. of No. of
Running Action Plan for
Division additional additional Remarks TDC
Room Augmentation.
Rooms Beds
12 Rooms (2
BMY 3 7 Work Bedded) Umbrella 31.07.24
completed Works (23-24)
(PH-64)
No further
feasibility for
Raipur 2 4 Work -
providing extra
completed
beds in existing
Raipur building.
12 Rooms (2
RSD 4 8 Work Bedded) Umbrella 31.07.24
completed Works (23-24)
(PH-64)
5 Rooms (2
DUG - - Bedded) Umbrella 31.07.24.
-
Works (23-24)
(PH-64)
NAG HQ details
No Bed For Personal
Duration Total RHQ No Authority Shuttling TO
Available Balancing reason
Feb 05 – Feb 11 173 0 165 3 0 5
Feb 12 – Feb 18 157 0 153 2 0 2
Feb 19 – Feb 25 131 0 127 0 0 4
Feb 26 – Mar 01 147 0 139 1 0 7
Mar 02 – Mar 08 132 0 126 3 0 3

No. of No. of
Running
Division additional additional Action Plan/Augmentation TDC
Room
Rooms Beds
KAV 1 8 Work completed
G 1 5 Work completed -
Construction of service building
10 20 against sanction work of PH-15 01.11.24
DGG
Nagpur (Doubling). Work proposal is
under process.
Construction of service building
15 30 against sanction work of PH-15 01.11.24
G
(Doubling). Work proposal is
under process.

SECR RHQ Details


No Bed For Personal
Duration Total RHQ No Authority Shuttling TO
Available Balancing reason
Feb 05 – Feb 11 387 35 307 9 23 13
Feb 12 – Feb 18 406 52 312 3 22 17
Feb 19 – Feb 25 344 39 278 2 0 25
Feb 26 – Mar 01 389 33 320 7 12 17
Mar 02 – Mar 08 318 28 253 16 4 17

8.1 Details of PME Overdue as on 29.02.24 – Not Due

8.2 Details of Refresher Overdue as on 29.02.24 – Not Due

9.1 Details of abnormalities reported in CMS by Crew & CLI


Total abnormalities reported No. of abnormalities resolved % of abnormalities resolved
during within three days within three days
Division Last week This week Last week This week Last week This week
(23.02.24 to (01.03.24 to (23.02.24 to (01.03.24 to (23.02.24 to (01.03.24 to
29.02.24) 07.03.24) 29.02.24) 07.03.24) 29.02.24) 07.03.24)
BSP 69 77 67 76 97.1 98.7
R 30 16 29 16 96.67 100
NAG 15 14 15 14 100 100
SECR 114 107 111 106 97.37 99.07
9.2 Manual Sign ON & OFF Cases Lobby Wise Over SECR
Period 25.02.24 to 09.03.24
% %
Total Sign Manual Total Sign Manual
SR DIVISION LOBBY Manual Manual
ON Sign ON OFF Sign OFF
Sign ON Sign OFF
1 AKT 1057 14 1.32 1066 7 0.66
2 BJRI 1881 6 0.32 1862 4 0.21
3 BRJN 4617 94 2.04 4608 32 0.69
4 BSP 9587 473 4.93 9553 39 0.41
5 KDTR 2 2 100.00 2 0 0.00
6 KHS 1636 32 1.96 1655 21 1.27
7 KJZ 168 7 4.17 170 1 0.59
8 BSP KRBA 5482 17 0.31 5452 44 0.81
9 PND 1759 29 1.65 1789 6 0.34
10 PSRS 160 160 100.00 160 0 0.00
11 RIG 5300 27 0.51 5269 24 0.46
12 SDL 4588 16 0.35 4554 10 0.22
13 SJQ 348 6 1.72 351 12 3.42
14 USL 1334 19 1.42 1354 6 0.44
[TOTAL] 37919 902 2.38 37845 206 0.54
1 BYT 2006 15 0.75 1990 2 0.10
2 DBEC 7807 37 0.47 7710 17 0.22
3 DPH 37 21 56.76 37 0 0.00
4 DRZ 670 15 2.24 667 5 0.75
5 DURG 1249 11 0.88 1254 5 0.40
6 MGCH 17 7 41.18 19 1 5.26
7 R MGMT 11 3 27.27 11 0 0.00
8 MRLB 16 0 0.00 16 0 0.00
9 MXA 152 53 34.87 151 2 1.32
10 R 2178 17 0.78 2151 8 0.37
11 RSD 1310 31 2.37 1306 6 0.46
12 TLD 121 78 64.46 121 0 0.00
[TOTAL] 15574 288 1.85 15433 46 0.30
1 CHCR 206 8 3.88 206 2 0.97
2 CWA 617 5 0.81 602 5 0.83
3 DGG 3969 16 0.40 3994 8 0.20
4 G 3963 5 0.13 3944 1 0.03
5 JESG 419 1 0.24 428 0 0.00
6 KAV 2448 39 1.59 2460 7 0.28
7 KWN 10 10 100.00 10 0 0.00
NAG
8 NAB 460 3 0.65 466 2 0.43
9 NIR 806 1 0.12 810 2 0.25
10 NITR 178 8 4.49 179 7 3.91
11 PMAM 38 0 0.00 38 0 0.00
12 SCLN 2471 22 0.89 2441 17 0.70
13 TMR 288 0 0.00 288 0 0.00
[TOTAL] 15873 118 0.74 15866 51 0.32
SECR Total 69366 1308 1.89 69144 303 0.44

10. Safety Hazard - Nil


11. Pending DAR action:
Remarks
# Location Accident Type DAR status

Gondia
Yard Primary-
(NAG) Tower wagon No. SEC 943011, Rajesh Kumar- LP of Tower car/Gondia-
07.10.23 while moving from point No. 108 to SF-5 issued on 02.11.23.
at 07:45 line No. 8 for oil Siding, LP Preliminary inquiry held on 18.12.23. D+152 days
hrs proceeded Tower Wagon without 1st sitting done on 06.01.24. as on
(Non observing shunt signal (SH 20) 2nd sitting done on 30.01.24. 07.03.24.
SIMS- which was in ‘ON’, resulting into Report submitted by I.O. on 22.02.24
SPAD ) burst of Point No. 114. Report sent to Party on 23.02.24
>90 Acknowledged by Party on 24.02.24
days

12.Yard improvement details-Not Due


13.1Six monthly Counseling of Field Staff(Engg.) till 02.03.2023. Period–1st Jan onwards-
Completed
13.2 Six monthly Counseling of Field Staff (Mech.) till 02.03.2023.Period–1st Jan onwards
-Completed

13.3 Six monthly Counseling of Field Staff (Optg.) till 09.03.2023. Period –1stJanonwards-
Completed

14. Compliance of Night Inspection for Feb -2024


No. of inspections No. of inspections
As per schedule Actual Done
HOD 17 17

Dy.HOD 18 17

Total 35 34
15. Status of Safety Items being monitored by Railway Board as on 07.03.2024
Rly Bd
Position as on 07.03.24
Item
no. Items BSP R NAG SECR
FENCING FOR PREVENTION OF CATTLE RUN OVER
1B
Number of other
vulnerable locations
6 15 16 37
identified
Number of other This
0 0 0 0
vulnerable locations week
where Total 0 1 02 03
Fencing completed
Target date of completion
for fencing of other 31.07.24
vulnerable locations

ITEM BSP R WRS NAG SECR

10 Number of BOXN-type
Wagons in which 2 This
doors dummied week 3 50 60 113
(Target
2500); TDC – March No freight
Total 252 1078 2345 examination 3675
2024
Number of BOXN-type This point in
Wagons in which week 2 50 60 NAG 112
door heights Division
reduced (Target
2500); TDC – March Total 136 729 1478 2343
2024

12 Modification of Total– 44 nos.


D1 Emergency Completed this week – 01
Valves in Completed (Cum.) - 44
WDP4/ WDG4 Pending – 0
Locomotives TDC – 31.01.2024
Revised TDC – 15.02.24, Re-revised TDC – 15.03.24
13 Provision of Total Locomotive-150
Shunting mode Eligible population – 72
operation Make Qty. Modification done Balance
switch in Medha 22 17 05
Electric Loco AAL (Tepro) 12 7 05
Laxven 35 16 19
Modern Rail
3 02 01
Tech
Total 72 42 30

No. of Loco modified this week– 04


No. of Loco modified (cum.) - 42
Pending - 30
TDC – 31.05.2024
16.1 Internal Joint Safety Audit Report by Dy.CSO/S&T and Dy.CSO/Tfc.
No. of
No. of
Deficiencies
Period of Deficiencies in No. of Pending TDC of the pending
S.No. Divisions Station Complied in
report Main Audit Deficiencies deficiencies
Main Audit
Report
Report
August
09.08.23 to
1 BSP SNGP 93 93 0 -
11.08.23
22.08.23 to
2 R RVH 50 50 0 -
25.08.23
29.08.23 to
3 NAG NIR 80 80 0 -
01.09.23
September
25.09.23 to
1 BSP USL 66 66 0 -
27.09.23
20.09.23 to
2 R R 55 55 0 -
23.09.23
28.09.23 to
3 NAG DGG 34 34 0 -
30.09.23
October
10.10.23 to
1 BSP GTK 51 51 0 -
12.10.23
05.10.23 to
2 R BYL 38 38 0 -
07.10.23
27.10.23 to
3 NAG RSM 19 19 0 -
30.10.23
November
02.11.23 to
1 BSP RAIGARH (RIG) 26 26 0 -
04.11.23
20.11.23 to
2 R URKURA (URK) 19 19 0 -
22.11.23
KACHEWANI 07.11.23 to
3 NAG 21 21 0 -
(KWN) 09.11.23
December
JAIRAMNAGAR 13.12.23 &
1 BSP 38 38 0 -
(JRMG) 18.12.23
BHILAI NAGAR 26.12.23 to
2 R 18 18 0 -
(BQR) 27.12.23
TDC – 31.01.24
RAJNANDGAON 20.12.23 to Revised TDC – 10.02.24
3 NAG 28 27 01
(RJN) 23.12.23 Re-revised TDC –
15.03.24
Total 84 83 1
January
SHAHDOL 24, 25 & TDC-29.02.24
1 BSP 42 41 01
(SDL) 27.01.24 Revised TDC – 31.03.24
TILDA 09.01.24 to
2 R 20 20 0 -
(TLD) 10.01.24
GONDIA 03.01.24 to
3 NAG 34 32 02 TDC-31.03.24
(G) 04.01.24
Total 96 93 3
LIST OF PENDING DEFICIENCIES
Audits conducted in DEC’ 2023 :
Divn. Stn. S.N. Items to be Checked Observations / Deficiencies noted Remarks/TDC
1. One Hand Point is shown in FCI Line ahead of SH-30
(Fixed On Shunt/ Dummy Shunt) but physically there is
Deficiencies in Station Yard
no Hand Point (Non-interlocked) on this line. This needs
Layout should be identified and Revised
NAG RJN 2 to be complied at site or in Plan as per the requirement
suggestions for its improvement at the location.(Deficiency-3) . TDC-15.03.24
should be given.

Audits conducted in JAN’ 2024


Divn. Stn. S. N. Items to be checked Observations/Deficiencies noted Remarks/TDC
Cable Meggering Record of 4. Several lines of the yard at both ends have been
station should be checked, for dismantled owing to yard remodeling in connection with
BSP SDL 41 ensuring completion as per laid 3rd line work but no any Temporary Instruction for the TDC-31.03.24
down norms. same has been issued (Deficiency-34 )

Deficiencies in Station Yard 5. PQRS Siding Line No. 01 & 02 and MalajKhand Siding
Layout should be identified and taking off from PQRS siding No. 03 is neither maintained
suggestions for its improvement nor in use. Track is completely covered under bushes
2 TDC-15.03.24
should be given. and not visible apparently. Future use of these lines to
be examined and if not required, may be removed.
(Deiciency-5).
Check for incorporation in a) The yard gradient shall be prominently displayed in
SIP/RCT/Circuits etc. of CRS’s yard diagram available in SM's Room/Control Panel. But
NAG G Conditions/Observation the same is not complied (Deficiency-8).
mentioned in CRS Sanction
Letter for initial commissioning
6 as well as all alterations TDC-31.03.24
subsequently