3.0 UNUSUALS
Date and Location Nature Case Details Remarks
Time /Type Prima Facie Cause
3.3 Run Over Detail February 2024 (Below data are from Security Deptt./Hq) –
Not Due
4.1 Position of DFW (R), as on 07.03.24 (Below data are from TMS)
Opening Balance Accrual during Removal during Balance
the week the week
(A Route+Other) (A Route+Other) (A Route+Other) (A Route+Other)
0 01 01 0
BSP (0 + 0) (0 + 01) (0 + 01) (0 + 0)
0 0 0 0
R (0 + 0) (0 + 0) (0 + 0) (0 + 0)
0 0 0 0
NAG (0 + 0) (0 + 0) (0 + 0) (0 + 0)
0 01 01 0
Total (0 + 0) (0 + 01) (0 + 01) (0 + 0)
5.1 Overdue status of USFD“AT-Weld ”(New + Old) Testing on Main Line, as on dt.07.03.2024
Balance on Accrual during Testing done Balance on
Division Net Progress
01.03.24 this week during this week 07.03.24
BSP 0 1166 1141 25 25 nos. increased
R 0 540 540 0 0
NAG 0 936 936 0 0
Total 0 2642 2617 25 0
These data are from TMS
5.2 Overdue status of USFD Rail Testing on Main Line, as on dt.07.03.2024
Accrual
Balance on Testing done Balance on
during this
Division 01.03.24 during this 07.03.24 Net Progress
week
(T Km) week (T Km) (T Km)
(T Km)
BSP 10.000 246.937 244.207 12.73 2.73 T Km increased
R 0 73.539 73.539 0 0
NAG 0 93.649 93.649 0 0
Total 0 414.125 411.395 12.73 2.73 T Km increased
These data are from TMS
5.5 Turnout identified for UNIMAT tamping as per latest TRC and OMS run
(BSP – TRC: Jan & Feb-24 (61%) & BSP –OMS- Feb-24 (63%);
R –TRC – Jan & Feb 24(51%) &OMS – Dec-23 (94%)
NAG –TRC – Feb 24 (71%);OMS –Feb-24 (74%))
Note : % shown are % recording done at speed of above than maximum permissible
speed minus 10 Kmph.
Nos. of No. of Machines
Progress this
turnout Balance available for
week at
Nos. of Progress tamped turnout Turnout tamping
Division Turnout previous Other at tamping at
identified week Identified than identified identified Open Cons./
Total
location identified location location line Other
location (Cum)
BSP 296 02 07 02 17 279 02 0 02
R 254 14 11 0 70 184 2 0 2
NAG 226 4 7 1 28 198 2 0 2
Total 776 20 25 3 115 661 6 0 6
5.6 Deep Screening of Turnout
Cumulative
Progress during
progress as on
Sr.DEN/ Target the week
S.N. Div. ADEN date: 07.03.24 Balance Remarks
DEN (Nos.)
Machine Manual Machine Manual
1 BRJN 20 0 0 0 0 20
2 EAST RIG 15 0 0 0 0 15
3 CPH 25 0 0 0 0 25
4 BSP 25 0 12 0 12 13
CENTRAL
5 BSP PND 20 0 0 0 0 20
6 SDL 15 0 0 0 0 15
7 NORTH UMR 10 0 0 0 0 10
8 MDGR 20 0 0 0 0 20
TOTAL 150 0 12 0 12 138
1 Sr.DEN (I) BYT 40 0 0 0 0 40
2 R BIA-I 20 0 0 0 31 -11
3 R Tr.R 0 0 2 0 15 -15
4 DEN (II) R BIA-II 40 0 10 0 19 21
TOTAL 100 0 12 0 65 35
1 Track 49 0 0 1 0 48
Central
2 TMR 16 0 0 2 3 11
3 G 3 0 0 0 0 3
East
4 DGG 6 0 0 0 5 1
NAG
5 NIR 8 0 0 0 5 3
North
6 CWA 0 0 0 0 0 0
7 South NAB 18 0 0 0 0 18
TOTAL 100 0 0 3 13 84
SECR TOTAL 250 0 24 3 90 257
5.7 Bridges identified for attention as per latest TRC and OMS run
(BSP – TRC: Jan & Feb-24 (61%) & BSP –OMS-Feb-24 (63%);
R – TRC – Jan & Feb 24 (51%)&OMS – Dec-23 (94%)
NAG –TRC – Feb 24 (71%);OMS –Feb-24 (74%))
Note : % shown are % recording done at speed of above than maximum permissible
speed minus 10 Kmph.
Nos. of Nos. of bridges Balance
Division Progress Progress
bridges attended (Cum)
previous week this week
identified
BSP 36 15 0 36 0
R 1 1 0 1 0
NAG 34 18 16 34 0
Total 71 34 16 71 0
5.8 Weekly progress of removal of Cracked Sleeper
Scope Cumulative
Progress(Km) Balance Balance
Division (km) progress (km)
P-1 P-2 P-3 Previous This Progress Progress
(As on (As on
week week total (km) P-1(km)
31.07.22) 07.03.24)
BSP 409.12 139.42 67.61 202.08 6.68 5.61 198.415 210.705 30.067
R 39.07 15.06 10.963 13.048 0 0 35.722 3.349 0
NAG 49.47 0.21 0.12 49.14 0.768 0.727 37.735 11.735 0
Total 497.66 154.69 80.69 262.27 7.448 6.337 271.872 225.789 30.067
Remarks,P-1Section:
BSP:JSG-CPH,CPH-BSP,BSP-PND,APR-NKJ,BRH-SJQ,
R:BSP-DPH,DGS-NPI, BIA Yd, URK Yd, R-MNDH,GDZ-KYS.
NAG:
5.9 Details of TSR for more than 30 days over SECR as on 07.03.2024
Details of TSR for more than 30 days over R Divn as on 07.03.24 - NIL
Details of TSR for more than 30 days over NAG Divn as on 07.03.24.
Date of Revised
SN Details of TSR Old TDC
Imposition TDC
KWN Yd 3rd line, Km: 1023/32-1022/32, SR: 75 kmph
1 25.12.23 15.02.24 15.03.24
Unconsolidated track in MDS site.
AGN Yd DN line, Km:978/36-978/34, SR: 75 kmph due
2 05.02.24 10.03.24 20.03.24
to UML peak of Twist.
GDM-AGN UP, Km: 982/19-21, SR: 20 kmph Launching
3 08.12.23 20.01.24 17.03.23
of relieving girder at LC.no.499
GDM-AGN 3rd line, Km: 982/18-16, SR: 20 kmph due to
4 27.01.24 06.03.24 17.03.24
Box Pushing.
KNHN-DKU, Km: 1121/1-1122/11, SR: 75 kmph due
5 23.01.24 15.03.24
Unconsolidated Track.
GDM-AGN DN line, Km: 982/20-18, SR: 20 kmph
6 06.12.23 20.01.24 17.03.24
Launching of releving girder at LC.no.499
ULA-BDKD SL, Km: 1289/8-10, SR: 30 kmph due to
7 20.12.23 18.02.24 31.03.24
Strengthening of Girder Bridge no. 78.
KAV-KRDI UP line, Km: 2 KRD/5-7KRD/3, SR: 65 kmph
8 18.01.24 20.03.24
due to Unconsolidated Track.
KAV-KRDI UP line, Km: 7 KRD/3-7KRD/5, SR: 30 kmph
9 18.01.24 20.03.24
due to Destressed Track.
KAV-KRDI UP line, Km: 7 KRD/5-8KRD/25, SR: 45
10 18.01.24 20.03.24
kmph due to Unconsolidated Track.
KAV-KRDI UP line, Km: 8 KRD/25-9KRD/7, SR: 30
11 18.01.24 20.03.24
kmph due to Cross Level Variation.
KAV-KRDI DN, Km: 1 KRD/6-2KRD/6, SR: 30 kmph
12 27.12.23 15.02.23 31.03.24
due to Unconsolidated Track
KAV-KRDI DN, Km: 2 KRD/6-8 KRD/10, SR: 65 kmph
13 27.12.23 15.02.23 31.03.24
due to Unconsolidated Track
KAV-KRDI DN, Km: 8 KRD/10-9KRD/6, SR: 30 kmph
14 27.12.23 15.02.23 31.03.24
due to Unconsolidated Track
NAB-TUD, Km: 1141/09-1142/18, SR: 45 kmph due to
15 27.01.24 31.03.24
less cushion
LDE-KLOD , Km: 1346/8-10, SR: 30 kmph
16 14.11.23 17.01.24 31.03.24
Strengthening of Girder Br No. 247.
PDE-NIR , Km: 1129/10J-1130/10J, SR: 80 kmph
17 28.09.23 15.11.23 20.03.24
Unconsolidated Track
BMC-BDKD SL, Km: 1294/23-1295/5, SR: 20 kmph
18 28.04.22 31.12.23 31.03.24
Br.No.94 repairing work
31.03.24
19 NAB Yd L1, Km: 1133/16-17, SR: 15 kmph 31.12.22 30.11.23 T-28 m/c
required)
Progress
Population Condonation Balance
(Scope) as Cumm under w.r.t
Div. Work status
on Prog. During process Scope
Cumm.
01.04.23 Upto the (if any) (b-e)
(c+d)
previous month
Month
a b c d e f g
Leaning : Work sanctioned for 199 nos in
Umbrella work 22-23. Tender opened on
03.05.23. No offer received. Retender done,
Tender opened on 05.06.23 & discharged.
Fresh Tender opened on 09.10.23 and
BSP 1859 305 26 331 -- 1528 under TC.
Critical : 751 nos. sanctioned in 6 different
works (2 works in Umbrella 21-22, 3 works
in Engineering work of 19-20 & 1 work in
MWP -21-22) . Work awarded in 6 different
contracts section wise for 751 nos.
Leaning : 150 nos. sanctioned.
i) 100 nos. sanctioned in Umbrella work 21-
22 and work awarded.
ii) 50 nos. Sanctioned in MWP 22-23 and
R 578 222 41 263 -- 315 work awarded.
NGP 631 159 24 183 -- 448 Critical : 196 nos. sanctioned in 2 works
(Umbrella work 20-21 and MWP-19-20) &
work awarded in two different contracts.
Summarized Crew Long Hrs of SECR, Lobby Wise from 25.02.24 to 09.03.24 (14 days
period) –
% of more % of more
>12 Hrs from >12 Hrs from
than 12 hrs of than 12 hrs of
Division Lobby Total TOS Sign ON to Sign ON to
Sign ON to Sign ON to
Sign OFF WS
Sign OFF WS
AKT 276 7 2.54 1 0.36
BJRI 914 38 4.16 8 0.88
BRJN 2116 172 8.13 17 0.80
BSP 3766 326 8.66 30 0.80
KHS 819 95 11.60 11 1.34
KRBA 2192 96 4.38 9 0.41
BSP
PND 663 19 2.87 2 0.30
RIG 2410 215 8.92 38 1.58
SDL 2853 209 7.33 42 1.47
SJQ 218 0 0.00 0 0.00
USL 815 72 8.83 1 0.12
TOTAL 17042 1249 7.33 159 0.93
BYT 1187 68 5.73 15 1.26
DBEC 4136 153 3.70 33 0.80
DRZ 321 7 2.18 0 0.00
R DURG 17 0 0.00 0 0.00
MXA 22 0 0.00 0 0.00
R 1069 67 6.27 9 0.84
TOTAL 6752 295 4.37 57 0.84
CWA 116 3 2.59 0 0.00
DGG 2300 116 5.04 4 0.17
G 2206 152 6.89 4 0.18
JESG 188 1 0.53 0 0.00
KAV 1537 184 11.97 8 0.52
NAG
NAB 128 14 10.94 3 2.34
NIR 344 3 0.87 0 0.00
SCLN 708 76 10.73 5 0.71
TMR 38 0 0.00 0 0.00
TOTAL 7565 549 7.26 24 0.32
Fortnightly Sign ON to Sign OFF (>12 hours %)
Jan- Mar-
S.No. Div. OCT-2 OCT-3 NOV-1 NOV-2 Dec- 1 Dec- 2 Jan- 1 Feb-1 Feb-2
2 1
1 BSP 27.77 26.12 24.48 28.17 26.30 19.85 10.62 9.51 8.89 8.11 7.33
2 R 7.10 9.15 6.86 6.69 6.57 4.44 4.51 7.09 3.34 3.14 4.37
3 NAG 15.35 12.23 11.15 11.07 9.70 5.91 4.18 6.96 7.37 7.12 7.26
4 SECR 20.39 18.19 17.43 19.53 18.06 13.27 7.82 8.39 7.39 6.83 6.67
30.00
25.00
20.00
BSP
15.00
NAG
10.00 R
SECR
5.00
0.00
OCT-2 OCT-3 NOV-1 NOV-2 Dec- 1 Dec- 2 Jan- 1 Jan- 2 Feb-1 Feb-2 Mar-
1
2.00
1.80
1.60
1.40
1.20
BSP
1.00
NAG
0.80
R
0.60
0.40 SECR
0.20
0.00
OCT-2 OCT-3 NOV-1 NOV-2 Dec- 1 Dec- 2 Jan- 1 Jan- 2 Feb-1 Feb-2 Mar-
1
Summarized Crew Long Hrs (More than 14 Hrs) of SECR from 25.02.24 to 09.03.24
(14 days period) –
% of more than
>14 Hrs from
Total 14 hrs from >14 Hrs from Sign % of more than 14 hrs
Div. Sign ON to
TOS Sign ON to ON to WS from Sign ON to WS
Sign OFF
Sign OFF
BSP 17042 325 1.91 15 0.09
R 6752 56 0.83 6 0.09
NAG 7565 118 1.56 3 0.04
SECR 31359 499 1.59 24 0.08
Summarized Crew Long Hrs of SECR, Lobby Wise from 25.02.24 to 09.03.24 (14 days
period) –
% of more % of more
>14 Hrs from >14 Hrs from
than 14 hrs of than 14 hrs of
Division Lobby Total TOS Sign ON to Sign ON to
Sign ON to Sign ON to
Sign OFF WS
Sign OFF WS
AKT 276 1 0.36 0 0.00
BJRI 914 9 0.98 1 0.11
BRJN 2116 59 2.79 4 0.19
BSP 3766 85 2.26 0 0.00
KHS 819 21 2.56 0 0.00
KRBA 2192 23 1.05 1 0.05
BSP
PND 663 3 0.45 0 0.00
RIG 2410 33 1.37 5 0.21
SDL 2853 75 2.63 4 0.14
SJQ 218 0 0.00 0 0.00
USL 815 16 1.96 0 0.00
TOTAL 17042 325 1.91 15 0.09
BYT 1187 10 0.84 2 0.17
DBEC 4136 27 0.65 4 0.10
DRZ 321 0 0.00 0 0.00
R DURG 17 0 0.00 0 0.00
MXA 22 0 0.00 0 0.00
R 1069 19 1.78 0 0.00
TOTAL 6752 56 0.83 6 0.09
CWA 116 0 0.00 0 0.00
DGG 2300 23 1.00 0 0.00
G 2206 31 1.41 1 0.05
JESG 188 1 0.53 0 0.00
KAV 1537 40 2.60 2 0.13
NAG
NAB 128 8 6.25 0 0.00
NIR 344 0 0.00 0 0.00
SCLN 708 15 2.12 0 0.00
TMR 38 0 0.00 0 0.00
TOTAL 7565 118 1.56 3 0.04
Fortnightly Sign ON to Sign OFF (>14 hours %)
Dec- Dec- Jan- Jan- Mar-
S.No Div. OCT-2 OCT-3 NOV-1 NOV-2 Feb-1 Feb-2
1 2 1 2 1
1 BSP 12.33 10.64 9.55 12.48 11.31 7.65 3.26 2.59 2.10 2.03 1.91
2 R 1.46 2.33 1.25 1.20 1.24 0.89 1.05 1.42 0.71 0.60 0.83
3 NAG 3.73 2.47 1.89 2.31 1.85 0.78 0.67 1.09 1.58 1.48 1.56
4 SECR 7.91 6.77 5.88 7.64 6.86 4.58 2.19 1.99 1.69 1.59 1.59
14.00
12.00
10.00
8.00 BSP
6.00 NAG
R
4.00
SECR
2.00
0.00
OCT-2 OCT-3 NOV-1 NOV-2 Dec- 1 Dec- 2 Jan- 1 Jan- 2 Feb-1 Feb-2 Mar-
1
0.20
0.18
0.16
0.14
0.12
BSP
0.10
NAG
0.08
R
0.06
SECR
0.04
0.02
0.00
OCT-2 OCT-3 NOV-1 NOV-2 Dec- 1 Dec- 2 Jan- 1 Jan- 2 Feb-1 Feb-2 Mar-
1
Average PDD over SECR from 17.12.23 to 30.12.23 (14 days period)
1:12
0:57
0:43
0:28
0:14
0:00
17.12.23 to 31.12.23 to 14.01.24 to 28.01.24 to 11.02.24 to 25.02.24 to
30.12.23 13.01.24 27.01.24 10.02.24 24.02.24 09.03.24
BSP 2:05 2:00 2:01 1:59 1:45 1:33
KRBA 1:56 1:53 1:54 1:59 1:47 1:40
RIG 1:35 1:27 1:21 1:27 1:26 1:24
BRJN 1:29 1:32 1:35 1:41 1:43 1:36
SDL 1:21 1:22 1:20 1:30 1:27 1:20
PDD of BMY (DBEC) Lobby
1:06
1:03
In Hours
1:00
0:57
0:54
0:51
17.12.23 to 31.12.23 to 14.01.24 to 28.01.24 to 11.02.24 to 25.02.24 to
30.12.23 13.01.24 27.01.24 10.02.24 24.02.24 09.03.24
BMY 1:00 1:02 0:57 1:02 1:01 1:04
PDD of G Lobby
1:26
1:12
0:57
In Hours
0:43
0:28
0:14
0:00
17.12.23 to 31.12.23 to 14.01.24 to 28.01.24 to 11.02.24 to 25.02.24 to
30.12.23 13.01.24 27.01.24 10.02.24 24.02.24 09.03.24
G 1:15 1:05 1:00 0:59 1:03 1:01
7. 2 Summarized Guard Long Hrs of SECR from 11.02.24 to 24.02.24 (14 days period)
– Not Due
No. of No. of
Running
Division additional additional Action Plan/Augmentation TDC
Room
Rooms Beds
BSP 25 50 Work in progress (40%) 31.12.24
8 31.03.24
RIG 4 4 Rooms -WIP (50%)
(Provided)
10 nos bed with Mattress
BRJN 5 10 Completed
BSP recd.
Proposal under progress
AKT 25 50
from CONST/Fund.
Proposal under progress
SDL 5 10 -
from CONST/Fund
R RHQ Details
No Bed For Shuttling Personal
Duration Total RHQ No Authority
Available Balancing TO reason
Feb 05 – Feb 11 49 14 26 6 0 3
Feb 12 – Feb 18 57 16 37 1 0 3
Feb 19 – Feb 25 60 6 44 2 0 8
Feb 26 – Mar 01 62 6 43 6 0 7
Mar 02 – Mar 08 54 5 32 13 0 4
No. of No. of
Running Action Plan for
Division additional additional Remarks TDC
Room Augmentation.
Rooms Beds
12 Rooms (2
BMY 3 7 Work Bedded) Umbrella 31.07.24
completed Works (23-24)
(PH-64)
No further
feasibility for
Raipur 2 4 Work -
providing extra
completed
beds in existing
Raipur building.
12 Rooms (2
RSD 4 8 Work Bedded) Umbrella 31.07.24
completed Works (23-24)
(PH-64)
5 Rooms (2
DUG - - Bedded) Umbrella 31.07.24.
-
Works (23-24)
(PH-64)
NAG HQ details
No Bed For Personal
Duration Total RHQ No Authority Shuttling TO
Available Balancing reason
Feb 05 – Feb 11 173 0 165 3 0 5
Feb 12 – Feb 18 157 0 153 2 0 2
Feb 19 – Feb 25 131 0 127 0 0 4
Feb 26 – Mar 01 147 0 139 1 0 7
Mar 02 – Mar 08 132 0 126 3 0 3
No. of No. of
Running
Division additional additional Action Plan/Augmentation TDC
Room
Rooms Beds
KAV 1 8 Work completed
G 1 5 Work completed -
Construction of service building
10 20 against sanction work of PH-15 01.11.24
DGG
Nagpur (Doubling). Work proposal is
under process.
Construction of service building
15 30 against sanction work of PH-15 01.11.24
G
(Doubling). Work proposal is
under process.
Gondia
Yard Primary-
(NAG) Tower wagon No. SEC 943011, Rajesh Kumar- LP of Tower car/Gondia-
07.10.23 while moving from point No. 108 to SF-5 issued on 02.11.23.
at 07:45 line No. 8 for oil Siding, LP Preliminary inquiry held on 18.12.23. D+152 days
hrs proceeded Tower Wagon without 1st sitting done on 06.01.24. as on
(Non observing shunt signal (SH 20) 2nd sitting done on 30.01.24. 07.03.24.
SIMS- which was in ‘ON’, resulting into Report submitted by I.O. on 22.02.24
SPAD ) burst of Point No. 114. Report sent to Party on 23.02.24
>90 Acknowledged by Party on 24.02.24
days
13.3 Six monthly Counseling of Field Staff (Optg.) till 09.03.2023. Period –1stJanonwards-
Completed
Dy.HOD 18 17
Total 35 34
15. Status of Safety Items being monitored by Railway Board as on 07.03.2024
Rly Bd
Position as on 07.03.24
Item
no. Items BSP R NAG SECR
FENCING FOR PREVENTION OF CATTLE RUN OVER
1B
Number of other
vulnerable locations
6 15 16 37
identified
Number of other This
0 0 0 0
vulnerable locations week
where Total 0 1 02 03
Fencing completed
Target date of completion
for fencing of other 31.07.24
vulnerable locations
10 Number of BOXN-type
Wagons in which 2 This
doors dummied week 3 50 60 113
(Target
2500); TDC – March No freight
Total 252 1078 2345 examination 3675
2024
Number of BOXN-type This point in
Wagons in which week 2 50 60 NAG 112
door heights Division
reduced (Target
2500); TDC – March Total 136 729 1478 2343
2024
Deficiencies in Station Yard 5. PQRS Siding Line No. 01 & 02 and MalajKhand Siding
Layout should be identified and taking off from PQRS siding No. 03 is neither maintained
suggestions for its improvement nor in use. Track is completely covered under bushes
2 TDC-15.03.24
should be given. and not visible apparently. Future use of these lines to
be examined and if not required, may be removed.
(Deiciency-5).
Check for incorporation in a) The yard gradient shall be prominently displayed in
SIP/RCT/Circuits etc. of CRS’s yard diagram available in SM's Room/Control Panel. But
NAG G Conditions/Observation the same is not complied (Deficiency-8).
mentioned in CRS Sanction
Letter for initial commissioning
6 as well as all alterations TDC-31.03.24
subsequently