DAILY DIARY
Temporary 128 00 -
Rings
Permanent Rings
Type A 10482 1853 06
Type B 7209 03 02
Type C 126 04 00
Total 17948 1860 08
Type A Type B Type C Total Rejected Segment
S1-26 S1- S1- Nos.
S2-52 S2- S2- S1-26
Rejected S3-43 S3- S3- S2-52
S3-43
Segments S4-34 S4- S4-
S4-34
S5-27 S5- S5- S5-27
S6-34 S6- S6-01 S6-35
General Consultants
For Chennai Metro Rail Project,
Phase - II
3. Casting of rings – PR1853/M14, 1854/M08 (TYPE B), 1855/M07 (TYPE B), 1856/M18, 1857/M16,
1858/M19, 1859/M15, 1860/M10
1. Non availability of comcaster materials & Concrete disturbance frame for further continue the works.
2. Delay in implementing RFID & barcode systems for Tunnel rings.
3. Double tyier stacking no work carried out .
4. TBM lubricant shed no work carried out .
5. Trial ring assembly – Second layer assembly no work carried out .
Sr. No. SOR Issued? Description of SOR NCR Issued? Description of NCR
-
1 No No -
Quality Issues
1. Poor stacking of Cut & bend rebars inside the casting shed & in temporary fabrication shed area.
2. RFI-ID & Barcode placed on the mould but not integrated with apps system.
3. Improper microfinishing activities.
1 No - No -
Sr.No. Description
Description
Manpower Report
1 L&T Staffs 07
3 Unskilled worker 09
Total Manpower 49
General Consultants
For Chennai Metro Rail Project,
Phase - II
Part view of PR-1854 / M08 -Type B cage fixed on the Segment Mould Cleaning work in progress
mould at radial view.
General Consultants
For Chennai Metro Rail Project,
Phase - II