The Design, Construction, Installation, Integration, Completion, Testing and Commissioning of Proposed Baggage Handling System (BHS)

Asset Replacement Program at KL International Airport, Sepang, Selangor, Malaysia Package 2 – BHS Main Works

UNDER REVIEW 4
WITHDRAWN 1
CODE 3
WORK METHOD STATEMENT (WMS) REGISTER
6
CODE 2 51
CODE 1 7
SUBMITTED 69
Date
DRF Reference Date Received
No. MS Document No. Description Rev. No. Letter No. Submitted to Ref. No COKUL Latest Status Remarks
No. via Email
CO KUL
3 BHSARP-00-ZZZ-ZZ-SM-WMS-710103 WMS Accommodation for PD, PMC and SLT7 Consortium at Block A Level 3 Carpark G01 PM-0171 14/3/2023 2023-077 DRF 065/2023 27/3/2023 CODE 2
6 BHSARP-00-ZZZ-ZZ-SM-WMS-710106 WMS Demolition & Preparation of PD, PMC, & SLT7 Accommdodation G01 PM-0245 4/4/2023 2023-146 DRF 096/2023 3/5/2023 CODE 2
7 BHSARP-00-ZZZ-ZZ-SM-WMS-710149 WMS 3D Laser Scanning of BHS at KLIA G01 PM-0321 27/4/2023 2023-171 DR 096/2023 11/5/2023 CODE 2
8 BHSARP-00-ZZZ-ZZ-SM-WMS-710233 Work Method Statement - Construction & Associated Works For Mini Savior Line G01 PM-0367 6/5/2023 2023-193 DRF 111/2023 23/5/2023 CODE 2
9 BHSARP-00-ZZZ-ZZ-AR-WMS-710301 PARTITION WALL G01 PM-0300 13/4/2023 2023-194 DRF 103/2023 23/5/2023 CODE 2
10 BHSARP-00-ZZZ-ZZ-AR-WMS-710302 CARPET TILE INSTALLATION G01 PM-0407 16/5/2023 2023-214 DRF 119/2023 29/5/2023 CODE 2
11 BHSARP-31-CPI-GL-AR-WMS-801504 Door Installation (CCR) G01 PM-1112 5/10/2023 2023-660 #734 10/10/2023 CODE 2
12 BHSARP-31-CPI-GL-AR-WMS-801505 Dry Wall Installation (CCR) G01 PM-1116 27/9/2023 2023-658 #735 11/10/2023 CODE 2
13 BHSARP-31-CPI-GL-AR-WMS-801506 Ceiling Installation - Gypsum Board (CCR) G01 PM-1115 27/9/2023 2023-657 #736 10/10/2023 CODE 2
14 BHSARP-31-CPI-GL-AR-WMS-801507 Painting Works (CCR) G01 PM-1114 27/9/2023 2023-652 #737 10/10/2023 CODE 2
15 BHSARP-31-CPI-GL-AR-WMS-801508 Skim Coat Application (CCR) G01 PM-1113 27/9/2023 2023-653 #738 10/10/2023 CODE 2
16 BHSARP-31-CPI-GL-AR-WMS-801509 SPC Flooring Installation (CCR) G01 PM-1117 27/9/2023 2023-649 #739 10/10/2023 CODE 2
17 BHSARP-31-CPI-GL-AR-WMS-801510 Lightweight WALL INSTALLATION (CCR) G01 PM-1522 22/11/2023 2023-1084 #940 18/12/2023 CODE 2
18 BHSARP-31-CPI-GL-AR-WMS-801515 Raised Floor System G01 PM-1346 2/11/2023 2023-897 #1083 10/11/2023 CODE 2
19 BHSARP-31-SAT-AL-AR-WMS-801517 Secondary Control Room (SCR) - Demolition Work G01 PM-1345 2/11/2023 2023-902 #1082 14/11/2023 CODE 2
20 BHSARP-31-SAT-AL-AR-WMS-801518 Relocation of Main Entrance Glass Door G01 PM-1561 28/11/2023 2023-1071 #1289 13/12/2023 CODE 2
21 BHSARP-31-CPI-GL-AR-WMS-801520 Built-In Fixtures Installation G01 PM-1601 4/12/2023 2023-1124 #1359 21/12/2023 CODE 2
22 BHSARP-31-CPI-GL-AR-WMS-801525 Installation of Curve Smart Glass G01 PM-1600 4/12/2023 2023-1123 #1358 21/12/2023 CODE 2
23 BHSARP-31-SAT-AL-AR-WMS-801524 Demolition Works G01 PM-1523 22/11/2023 2023-1046 #1260 6/12/2023 CODE 2

24 BHSARP-56-MSL-ZZ-AR-WMS-817200 Installation of Louvers G01 PM-1797 8/1/2024 2023-0087 #1623 16/1/2024 CODE 2
25 BHSARP-00-ZZZ-ZZ-SM-WMS-806001 Steelwork Erection at MSL G01 PM-1501 22/11/2023 2023-1078 #1239 15/12/2023 CODE 2
26 BHSARP-00-ZZZ-ZZ-CS-WMS-710233 Excavation Work for Mini Savior Line (MSL) G01 PM-0516 9/6/2023 - #55 7/6/2023 CODE 2
27 BHSARP-00-ZZZ-ZZ-SM-WMS-000150 MSL Construction G02 PM-0671 18/7/2023 2023-342 #284 1/8/2023 CODE 2
29 BHSARP-31-ZZZ-ZZ-CS-WMS-710236 Demolition Work CCR Room G01 PM-0777 9/8/2023 2023-430 #373 24/8/2023 CODE 2
30 BHSARP-31-MSL-GL-CS-WMS-710237 Tree Cutting MSL G01 PM-0776 9/8/2023 2023-404 #374 21/8/2023 CODE 1
31 BHSARP-31-ZZZ-ZZ-CS-WMS-710238 Remedial and Rectification Work for Defect at Concrete Structure G02 PM-1348 3/11/2023 2023-1080 #1080 4/12/2023 CODE 2
32 BHSARP-31-ZZZ-ZZ-CS-WMS-801202 Rectification Work for Stump F1(7) G01 PM-1420 9/11/2023 2023-964 #1158 24/11/2023 CODE 2
33 BHSARP-31-CPI-GL-AR-WMS-801503 Anti Termites for CCR Room G01 PM-1045 15/9/2023 2023-637 #602 5/10/2023 CODE 2
34 BHSARP-31-CPI-GL-CS-WMS-801513 Construction of RC Lintel G01 PM-1392 8/11/2023 2023-938 #1118 21/11/2023 CODE 2
35 BHSARP-31-CPI-GL-CS-WMS-801514 Construction of RC Stiffener G01 PM-1393 8/11/2023 2023-937 #1119 21/11/2023 CODE 2
36 BHSARP-31-MSL-GL-CS-WMS-801534 Rebar Planting for Plinth & Associate Works G01 PM-1613 5/12/2023 2023-1077 #1372 15/12/2023 CODE 2
37 BHSARP-36-MSL-ZZ-CS-WMS-806003 HST3 Expansions Bolt Pull Out and Shear Test G01 PM-1447 15/11/2023 2023-977 #1205 27/11/2023 CODE 2
38 BHSARP-36-MSL-ZZ-CS-WMS-806004 Application of Anti-Rust and Fire Proofing Intumescent Paint G01 PM-1749 29/12/2023 2024-0081 #1565 15/1/2024 CODE 2
39 BHSARP-00-ZZZ-ZZ-EL-WMS-710415 Sub Switch Board and Distribution Board Installation Works G00 PM-0456 5/7/2023 - #91-EL 18/7/2023 CODE 2
40 BHSARP-00-ZZZ-ZZ-EL-WMS-710416 Electrical Cables, Cable Tray, Trunking and conduit Installation Works G00 PM-0456 5/7/2023 - #91-EL 18/7/2023 CODE 2
41 BHSARP-00-ZZZ-ZZ-EL-WMS-710417 Lighting and Small Power Installation Works G00 PM-0456 5/7/2023 - #91-EL 18/7/2023 CODE 2

42 BHSARP-37-MTB-ZZ-EL-WMS-808071 Work Method Statement for Modification of Existing ERL-MDB2 and MDB4 at MTB G00 PM-0642 6/7/2023 2023-328 #232 28/7/2023 CODE 2

43 BHSARP-37-MTB-ZZ-EL-WMS-808081 Existing EMDB-CRS AT MTB MEZZ G01 PM-0618 29/7/2023 2023-323 #267 28/7/2023 CODE 2
44 BHSARP-45-ZZZ-ZZ-EL-WMS-813001 SITE SURVEY FOR CABLE & CABLE CONTRAIMENT TAGGING AND IDENTIFICATION G01 PM-790 17/8/2023 2023-453 #375 30/8/2023 CODE 2
BHSARP-37-MTB-ZZ-EL-WMS-808073 Work Method Statement - Installation of the Expansion Panel Located at MDB East
45 G01 PM-1201 10/12/2023 2023-832 #894 2/11/2023 CODE 2
and MDB West for the Existing MDB-ERL 2 & 4 Rev. G01
47 BHSARP-00-ZZZ-ZZ-EL-WMS-710420 Demolition of Existing OOG OC2 Conveyor Line G01 PM-0818 18/8/2023 2023-459 #409 5/9/2023 CODE 2
51 BHSARP-47-ZZZ-ZZ-ME-WMS-814001 SKB F38 Uninsulated Fire Shutter G01 PM-1550 24/11/2023 2023-1090 #1275 18/12/2023 CODE 2
DISMANTLING AND DIVERSION WORK FOR EXISTING DUCTING, FAN AND AIR
52 BHSARP-52-MTB-ZZ-ME-WMS-816402 G01 PM-1373 6/11/2023 2023-943 #1102 22/11/2023 CODE 2
CONDITIONING UNIT
53 BHSARP-00-ZZZ-ZZ-SM-WMS-000148 WMS Work Method Statement – Cold Water & Sanitary Plumbing (CWSP) G01 PM-0354 22/5/2023 2023-239 DRF116/2023 23/5/2023 CODE 1
56 BHSARP-42-ZZZ-ZZ-IT-WMS-809023 WMS IT Switch Configuration for PDPMC G01 PM-1178 10/10/2023 2023-755 #853 26/10/2023 CODE 2
WMS - Huawei Switch Devices Installation Works for DC, DRC, MITB, SAT, SCR, CCR
54 BHSARP-42-ZZZ-ZZ-IT-WMS-809005 G01 PM-1027 18/9/2023 2023-535 #600 20/9/2023 CODE 1
Tunnel and PDPMC
55 BHSARP-42-ZZZ-ZZ-IT-WMS-809027 WMS IT Switch Configuration for DC & DRC G01 PM-1177 10/10/2023 2023-706 #852 17/10/2023 CODE 2
57 BHSARP-42-ZZZ-ZZ-IT-WMS-809025 WMS IT WAC Installation G01 PM-1179 10/10/2023 2023-705 #856 17/10/2023 CODE 2
58 BHSARP-42-ZZZ-ZZ-IT-WMS-809026 WMS IT WAC Configuration G01 PM-1180 10/10/2023 2023-704 #857 17/10/2023 CODE 2
59 BHSARP-40-CPI-GL-IT-WMS-809013 WMS - Video Wall and Workstation Provisioning G02 PM-1188 11/10/2023 2023-734 #877 23/10/2023 CODE 2
60 BHSARP-41-ZZZ-ZZ-IT-WMS-811001 WMS for HPE Server Rack and vSAN Infrastructure Installation Work G01 PM-0854 24/8/2023 2023-468 #470 9/9/2023 CODE 2
WMS - Fiber Optic, Uninterruptible Power Supply (UPS), Trunking, and Conduit
61 BHSARP-44-PMO-A3-IT-WMS-812101 G01 PM-1222 16/10/2023 2023-720 #909 19/10/2023 CODE 1
Installation Works at PDPMC
62 BHSARP-44-ZZZ-ZZ-IT-WMS-812104 WMS for Wireless Access Point Installation at PDPMC Site Office, SCR and CCR G01 PM-1223 16/10/2023 2023-761 #921 30/10/2023 CODE 1
WMS - FIber Optic Cabling
63 BHSARP-44-ZZZ-ZZ-IT-WMS-812102 1. DCR (Pos L4) to SAT g07 G01 PM-1216 16/10/2023 2023-721 #908 19/10/2023 CODE 1
2. DCR (PosL4) to SAT G19
65 BHSARP-44-ZZZ-ZZ-IT-WMS-812106 WMS - UTP Cabling for DC and DRC G01 PM-1217 16/10/2023 2023-719 #910 19/10/2023 CODE 1
67 BHSARP-38-ZZZ-ZZ-BMS-WMS-808100 BMS Cable Installation G01 PM-1664 13/12/2023 2023-1202 #1422 29/12/2023 CODE 2
68 BHSARP-38-ZZZ-ZZ-BMS-WMS-808101 BMS Sensor Installation G01 PM-1665 13/12/2023 2024-0024 #1423 5/1/2024 CODE 2
69 BHSARP-38-ZZZ-ZZ-BMS-WMS-808102 BMS DDC Installation G01 PM-1666 13/12/2023 2024-0025 #1424 5/1/2024 CODE 2