Rev

ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-013
Page 1 of 2

SECTION A: GENERAL INFORMATION


Work Building
PMB, Office Area and P-Way Yard Section Civil
Task Description Night Shift – TSA-013

Method Ref. No. D0201-FAY-ECE-PM-00005 HSE Risk Assessment RA-D0201-FAY-ECE-PM-


Statement Serial No. Serial No. 00005
Ref. No. D0201-FAY-GHS-PR-00014 Ref. No. D0201-FAY-GHS-PR-00007
Lifting Plan PTW
Serial No Serial No.
Emergency PMB North, Near Substation 01
+97156-4134006 Assembly Point
Contact No Rest Area, Logistic Area

Specific Training Required Site Induction


Adjacent Work Hazards Extreme Weather Excessive Noise/ Dust
Stop Work Conditions Openings / missing edge
Change in Work Conditions Fires & Explosions
(if any, work shall stop& re-assessed) protection
Pollutant Spills/Releases Unusual Odors Evacuation Alarm
SECTION B: TASK PLANNING – HAZARD IDENTIFICATION AND CONTROLS
Task Steps Potential Hazards Mitigation Controls
 Collision /Struck by  Pre-Task briefing to be conducted prior to the activity.
 Person struck by  Competent / certified personnel / equipment
vehicle.  Post speed limits
 Lone working hazard  Barricading and blinking light provided on access and
1. Night works  Slip, Trip and fall working areas.
 5.Poor visibility /  Mandatory clear glasses shall be worn.
inadequate  Buddy system to be always followed.
illumination  All trucks and equipment to be equipped with audible
 Adverse weather reverse alarm, rotating, rear view and side mirrors.
condition (cool  Hi visibility vests to be worn always.
/humid weather and  Adequate Supervision
high wind at night)  Flashlights / torches must be provided.
 Blind spots  Adequate Area Lighting (Minimum 100 Lux)
 Sharpe edges.  Competent banks man always presents.
 Stand by vehicle to be available.
 Emergency procedure / flow chart to be followed.
 Planed and marked route shall be for
 Sharp edges shall be protected, and packing shall be
applied.
Rev
ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-013
Page 2 of 2

 Access and egress shall be made free of obstruction.


 Mandatory wear of PPE.

Name Signature Date


Completed By
Shamim Abbas
Approved By
Musadiq Hussain