SECTION A: GENERAL INFORMATION


WorkBuilding
PMB, Office Area and Logistic Area Section Civil
Task Description Working with Man Basket

Method Ref. No. HSE Risk Assessment


Statement Serial No. Serial No.
Ref. No. D0201-FAY-GHS-PR-00014 Ref. No. D0201-FAY-GHS-PR-00007
Lifting Plan PTW
Serial No Serial No.
Emergency PMB North, Near Substation 01
+97156-4134006 Assembly Point
Contact No Rest Area, Logistic Area

Specific Training Required Site Induction, Task Specific PPE, Work at Height Training
Adjacent Work Hazards Extreme Weather Excessive Noise/ Dust
Stop Work Conditions Openings / missing edge
Change in Work Conditions Fires & Explosions
(if any, work shall stop& re-assessed) protection
Pollutant Spills/Releases Unusual Odors Evacuation Alarm
SECTION B: TASK PLANNING – HAZARD IDENTIFICATION AND CONTROLS
Task Steps Potential Hazards Mitigation Controls
1. Planning the  Injuries to body
 Proper Wear of Additional PPE
operation parts
2. Designating &
Instructing  Slips & Trips  Riggers in the area will be competent & 3rd party trained
personnel
3. Work at  All personnel working at heights shall be trained on the
 Falls
height. wear of full body harnesses and the 100% tie off rule
 Failure due to
 Crane operator shall be certified prior starting operation.
operator
 Machines  Rigger shall guide the crane operator during operation.
mechanical failure  Equipment used shall be third party certified.
 The man basket shall be inspected every 6 months and shall
be 3rd party certified.
 In case of great wind, the supervisor shall stop the
operation.
 The equipment shall have an approved checklist & color
coded.
 Operators shall be strictly instructed not to use mobile
phones while operating.
Rev
ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-018
Page 2 of 2

 Man, basket shall be controlled with use of tag line. Do not


handle the wire rope with your bare hand.
 The area within the working radius shall be barricaded and
no unauthorized personnel shall access the area during
operation.
4. Emergency  Personnel /  Emergency contact details are posted at site.
Situations. Equipment /  Emergency plan communicated with all workforces and
Weather followed at site.
conditions.  Weather status must be coordinated with supervisor.
 Pinch Points  Avoid placing hand outside the grip bar of the man basket.

Name Signature Date


Completed By
Shamim Abbas
Approved By
Musadiq Hussain