ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-011
Page 1 of 2

SECTION A: GENERAL INFORMATION


Work Area Section Civil
Task Description Erection, Modification and Dismantling of Scaffold – TSA-011

Method Ref. No. D0201-FAY-EAD-PM-00001 HSE Risk Assessment RA-D0201-FAY-EAD-PM-


Statement Serial No. Serial No. 00001
Ref. No. D0201-FAY-GHS-PR-00014 Ref. No. D0201-FAY-GHS-PR-00007
Lifting Plan PTW
Serial No Serial No.
Emergency PMB North, Near Substation 01
+97156-4134006 Assembly Point
Contact No Rest Area, Logistic Area

Specific Training Required Mandatory PPE Wear

Adjacent Work Hazards Extreme Weather Excessive Noise/ Dust


Stop Work Conditions Openings / missing edge
Change in Work Conditions Fires & Explosions
(if any, work shall stop& re-assessed) protection
Pollutant Spills/Releases Unusual Odors Evacuation Alarm
SECTION B: TASK PLANNING – HAZARD IDENTIFICATION AND CONTROLS
Task Steps Potential Hazards Mitigation Controls
1. Planning of  PTW for work at height to be obtained.
scaffold at the  Slip and fall.  Pre task briefing will be conducted.
task area  Only required materials to be taken to the site.
 Scaffold materials are to be unloaded by mechanical
2. Moving  Worker struck by an
means.
offloading and object.
 Area of storage of scaffolding materials to be
handling of  Worker struck by the
barricaded.
scaffold vehicle during
 2.2.3 Avoid single man handling of heavy and of lengthy
materials offloading.
scaffold materials. Grip Unit Firmly with both hands.
 The work area will be cleaned and levelled.
 Competent scaffolder will be assigned to do the task.
 Ergonomic hazards
 100% Tie off mandatory above 2 m.
 Body injuries
3. Assembling the  Area to be barricaded and sign board placed.
 Falling of scaffold
scaffold  Certified Scaffold inspector will inspect the scaffold
materials and hit a
before use.
worker
 Housekeeping shall be maintained all personnel
involved shall wear the mandatory PPE.
Rev
ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-011
Page 2 of 2

Name Signature Date


Completed By
Shamim Abbas
Approved By
Musadiq Hussain