ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-016
Page 1 of 3
Specific Training Required Site Induction, Task Specific PPE, Manual Handling
Adjacent Work Hazards Extreme Weather Excessive Noise/ Dust
Stop Work Conditions Openings / missing edge
Change in Work Conditions Fires & Explosions
(if any, work shall stop& re-assessed) protection
Pollutant Spills/Releases Unusual Odors Evacuation Alarm
SECTION B: TASK PLANNING – HAZARD IDENTIFICATION AND CONTROLS
Task Steps Potential Hazards Mitigation Controls
1. Concrete Pre-task briefing conducted to all personnel involved in the
breaking or activity.
drilling & Housekeeping periodical
cutting Slips, trips, falls Proper routing of all cables on the deck
Safe access should be provided.
All the access to be cleared for any material, tools, and
equipment’s
Fire Extinguishers
Use equipment as per manufacturers recommendations.
Fire Area must be free from combustible materials / substances.
Firefighting equipment shall be readily accessible.
Hot Works Permit to Work Procedure will be implemented.
Injury caused by Proper Barrication with signage must be placed.
fragments of Wear proper PPE, including hand gloves when handling
concrete materials.
Remove scrap with a rake or shovel to avoid injuries while
handling sharp edges.
Damage of Identify the presence of any underground utilities by
Underground appropriate methods to prevent any damage.
Rev
ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-016
Page 2 of 3
Completed By
Shamim Abbas
Approved By
Musadiq Hussain
Distribution List