ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-016
Page 1 of 3

SECTION A: GENERAL INFORMATION


Work Building
PMB, Office Area and P-Way Yard Section Civil
Task Description Breaking – Drilling & Cutting of Concrete – TSA-016

Method Ref. No. HSE Risk Assessment


Statement Serial No. Serial No.
Ref. No. D0201-FAY-GHS-PR-00014 Ref. No. D0201-FAY-GHS-PR-00007
Lifting Plan PTW
Serial No Serial No.
Emergency PMB North, Near Substation 01
+97156-4134006 Assembly Point
Contact No Rest Area, Logistic Area

Specific Training Required Site Induction, Task Specific PPE, Manual Handling
Adjacent Work Hazards Extreme Weather Excessive Noise/ Dust
Stop Work Conditions Openings / missing edge
Change in Work Conditions Fires & Explosions
(if any, work shall stop& re-assessed) protection
Pollutant Spills/Releases Unusual Odors Evacuation Alarm
SECTION B: TASK PLANNING – HAZARD IDENTIFICATION AND CONTROLS
Task Steps Potential Hazards Mitigation Controls
1. Concrete  Pre-task briefing conducted to all personnel involved in the
breaking or activity.
drilling &  Housekeeping periodical
cutting  Slips, trips, falls  Proper routing of all cables on the deck
 Safe access should be provided.
 All the access to be cleared for any material, tools, and
equipment’s
 Fire Extinguishers
 Use equipment as per manufacturers recommendations.
 Fire  Area must be free from combustible materials / substances.
 Firefighting equipment shall be readily accessible.
 Hot Works Permit to Work Procedure will be implemented.
 Injury caused by  Proper Barrication with signage must be placed.
fragments of  Wear proper PPE, including hand gloves when handling
concrete materials.
 Remove scrap with a rake or shovel to avoid injuries while
handling sharp edges.
 Damage of  Identify the presence of any underground utilities by
Underground appropriate methods to prevent any damage.
Rev
ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-016
Page 2 of 3

utilities  Provide appropriate protection to the exposed existing or


identified underground utilities.
 Excessive Dust  Dust mask will be worn.
 Water will be used to suppress any task generated dust.
 Noise  Regular maintenance of plants and equipment to minimize
noise.
 Ear plugs will be available on site
 Vibration  Regular maintenance of plants and equipment to minimize
vibration.
 Task specific PPE to be worn.
 System of job rotation in place so that workers are not
exposed to long vibration.
 Competent and Certified Operator and Flagman all the time,
 Outrigger will be in position while operation to ensure the
stability of the equipment.
 Proper Barrication and signage must be placed.
 Operatives must keep a safe distance from the equipment.
 Proper and correct tools and equipment suitable for the job
will be used.
 Hit by Equipment
 Inspect the Compressor & hoses before starting the job and
 Pinch point
2. Mechanical tag.
handling of cut  All necessary guards & safety devices are in place protecting
materials workers from all moving & rotating parts.
 Hoses are secure with a crimp connector.
 Sharp edges to be protected.
 Housekeeping shall be conducted daily.
 Proper PPE.
 Timely Removal of Steel and Concrete Scarp from the site
 Waste through approved waste contractor.
Management  Spill kit will be available nearby to handle any accidental spill
from the equipment.
 All personnel will be spoken to during PTB on the importance
of being hydrated and telling someone if they feel ill.
3. General Works  Heat Stress  Competent task-related supervision will be in place to
monitor works.
 Rest Shelters and drinking water will be available.

Name Signature Date


Rev
ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-016
Page 3 of 3

Completed By
Shamim Abbas
Approved By
Musadiq Hussain
Distribution List

You might also like