ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-014
Page 1 of 4

SECTION A: GENERAL INFORMATION


Workand
Generator Area
Electrical Distribution Boards Section Civil
Task Description Electrical Works (LOTO) – TSA-014

Method Ref. No. HSE Risk Assessment


Statement Serial No. Serial No.
Ref. No. D0201-FAY-GHS-PR-00014 Ref. No. D0201-FAY-GHS-PR-00007
Lifting Plan PTW
Serial No Serial No.
Emergency PMB North, Near Substation 01
+97156-4134006 Assembly Point
Contact No Rest Area, Logistic Area

Specific Training Required Site Induction, Task Specific PPE, Manual Handling, electrical Safety Awareness
Adjacent Work Hazards Extreme Weather Excessive Noise/ Dust
Stop Work Conditions Openings / missing edge
Change in Work Conditions Fires & Explosions
(if any, work shall stop& re-assessed) protection
Pollutant Spills/Releases Unusual Odors Evacuation Alarm
SECTION B: TASK PLANNING – HAZARD IDENTIFICATION AND CONTROLS
Task Steps Potential Hazards Mitigation Controls
1. Preparations of  Fires  Safeguards, safety devices, and safety systems
tools and  Severe burns  Reliability, history, and failure mode
working area  Electrocution  Operational/maintenance demands of task
2.  Health impairment  Possibility of defeat or failure of safeguards
 Slips, Trips, and falls  Accident history of task, activity, machine, equipment,
 Potential Injuries to or process
Back, Fingers/Thumb,  Competence of persons performing task
Arm, Lower limbs,  Ensure that authorized employees follow safe
Rest of torso, Hand, lockout/tagout procedures that are consistent with
others this policy.
 Injuries to multiple  Workshop Manager Identify employees who need
personnel. lockout/tagout safety training, schedule the training,
 Unsafe conditions. and ensure that employees are in attendance.
 Faulty equipment.  Develop and maintain safe shut down procedures on
 Lack of attention. each piece of equipment or machine that their
 Lack of employees are expected to service or maintain. The
communication. shutdown procedures will be reviewed by the
 Inadequate training. designated Electrical / Mechanical Section head or
Manager.
Rev
ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-014
Page 2 of 4

 Authorized/Designated Employees will notify their


supervisor when they have any questions about
isolating energy sources safely,
 Pre task briefing shall be conducted prior to start of
work.
 All equipment shall be of an approved Standard.
 Wear slip resistant & correct fitting in Main Power
footwear.
 Staff use the nearest electrical socket to reduce trip
hazards.
 Archirodon Housekeeping Policy to be adhered to.
 Correct Fuses
 Supervision procedures break shift patterns
established.
 Use of proper ergonomic techniques like appropriate
clothing, access the load, position of feet, grip the
load, lift the load, able to see where load is to be
moved, avoid body twisting, set down the load.
 Ensure use of trolleys for heavy or awkward loads
 Mandatory wear of PPE.
 Safeguards, safety devices, and safety systems
 Slips, Trips, and falls
 Reliability, history, and failure mode
 Potential Injuries to
 Operational/maintenance demands of task
Back, Fingers/Thumb,
 Possibility of defeat or failure of safeguards
3. Positioning of Arm, Lower limbs,
 Competence of persons performing task
equipment Rest of torso, Hand,
 Use of proper ergonomic techniques like appropriate
and/or others
clothing, access the load, position of feet, grip the
machineries.  Lack of attention.
load, lift the load, able to see where load is to be
 Lack of
moved, avoid body twisting, set down the load.
communication.
 Mandatory wear of appropriate PPE to the task
 Inadequate training.
 Supervision available at the location.
4. Identify all  Damage to property  Develop and maintain safe shut down procedures on
tasks/activities:  Slips, Trips, and falls each piece of equipment or machine that their
All tasks and  Injuries to multiple employees are expected to service or maintain. The
activities will be personnel. shutdown procedures will be reviewed by the
considered  Inadequate job designated Electrical / Mechanical Section head or
including set up, planning. Manager.
installation,  Unsafe procedures.  Authorized/Designated Employees will notify their
Rev
ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-014
Page 3 of 4

supervisor when they have any questions about


isolating energy sources safely,
 Authorized/Designated Employees will notify their
supervisor when they have any questions about
isolating energy sources safely, have observed non-
compliance activities or when problems are identified
removal,  Unsafe conditions. with equipment or lockout devices.
maintenance,  Faulty equipment.  Accident history of task, activity, machine, equipment,
operating,  Inadequate design or or process
adjusting, configuration.  Competence of persons performing task
cleaning,  Lack of attention.  Working environment
troubleshooting,  Lack of  Ensure that authorized employees follow safe
and communication. lockout/tag-out procedures that are consistent with
programming.  Inadequate training. this policy.
 Ensure access and egress clear from obstacles.
 Ensure work areas are non-slippery.
 Wear slip resistant & correct fitting in Main Power
footwear.
 Staff use nearest electrical socket to reduce trip
hazards.
5. Use of Power  Electric shock  Use of inspected and certified equipment
tools for cutting  Broken grinding/  All electrical circuits/generators shall be provided with
& grinding. cutting disc. an ELCB.
 Cut and abrasion  Route of cable shall not be exposed to wear, tear, or
injuries from contact other type of damage.
with rotating wheel.  Hand tools must be in good condition, inspected and
 Waste Generation colour coded.
 Inspect all power tools before use, checking leads,
on/off switches, guards are in place and general
condition.
 All handheld power tools with positive accessory
holding means (handle, knob) shall be equipped with a
constant pressure switch or control and may have a
lock-on control if turnoff can be accomplished by a
single motion of the same finger or fingers that turn it
on.
 Proper handling of machine.
 Appropriate wear of the correct PPE will be
Rev
ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-014
Page 4 of 4

mandatory & additional PPE according to the job


requirements. Proper face shields to be used while
cutting / grinding.
 Tools when not in use or before servicing, and when
changing accessories such as blades, bits and cutters
should be disconnected.
 Speed rating of cutting / grinding discs should be equal
to or more than that of the machine.
 Check for the expiry dates of the cutting/ grinding
discs.
 Operation of machines according to manufacture
guidelines.

Name Signature Date


Completed By
Kamal Nasir
Approved By
Musadiq Hussain
Distribution List