R0 - STR - 1ST Slab LVL Extension Portion
R0 - STR - 1ST Slab LVL Extension Portion
SCHEDULE OF BEAMS
B1
Y
BR1 X BOTTOM STEEL TOP STEEL EXTRA TOP STEEL
SUNK SLAB SLAB
REMARKS
MKD THICKNESS MAIN SPAN OTHER SPAN MAIN SPAN OTHER SPAN MAIN SPAN OTHER SPAN
SLAB
B2
Z BEAM TOP AT
Y
SUNK TOP LEVEL S1 110 #08@150 C/C #08@150 C/C #08@150 C/C #08@150 C/C -- -- PLAIN DOUBLE MESH SLAB
BR1
S2 110 #08@150 C/C #08@150 C/C #08@150 C/C #08@150 C/C -- -- PLAIN DOUBLE MESH SLAB
REBARING OF BEAM ON REBARING OF BEAM
THIS SIDE 200MM INSIDE ON THIS SIDE NOTE : REFER SECTIONAL DETAILS ACCORDING TO SLAB
USING REBARING CHEMICAL EXISTING MIN. 200MM INSIDE USING
REBARING CHEMICAL
(DOWELS TO BE LEFT MIN.
1000MM & TO BE LAPPED STRUCTURE (DOWELS TO BE LEFT MIN.
WITH NEW BEAM BARS 1000MM & TO BE LAPPED PROPOSED
REGULAR SLAB TOP LEVEL
WITH NEW BEAM BARS BRACKET
RCC BEAM 8@150 C/C
STEEL BOTHWAYS AT TOP FACE
PROPOSED EXISTING
150
BEAM B2 STEEL BOTHWAYS
AT TOP FACE SUNK TOP LEVEL
150
8@150 C/C EXISTING EXISTING SUNK SLAB 110
RCC BEAM
110
REBARING INSIDE BY 6" STEEL BOTHWAYS AT
USE REBARING CHECMICAL BOTTOM FACE, 8@150 C/C
STAGGERED STAGGERED
STEEL BOTHWAYS DOWELS 8MM @ 6" C/C
AT BOTTOM FACE DOWELS 8MM @ 8" C/C NEW BEAM "B1"
8@150 C/C (BEAM TOP AT SUNK TOP)
IMPORTANT INSTRUCTIONS :
STRUCTURAL LAYOUT AT FIRST SLAB LEVEL 1) GRADE OF CONCRETE = M25
2) GRADE OF STEEL = FE500
3) COVER TO BEAM = 30MM,
4) COVER TO SLAB = 20MM
*** IMP NOTE : BEFORE DOING REBARING AT ANY SURFACE, CHIP OFF EXISTING 5) ALL DIMENSIONS WILL BE AS PER ARCHITECTURAL DRAWING UNLESS OTHERWISE
PLASTER & COLOR FROM THAT EXISTING CONCRETE SURFACE, SPECIFIED.
*** DO MIN. 150MM REBARING BY USING ADHESIVE CHEMICAL & BEFORE DOING 6) ADD SUPPORT TO 2ND SLAB (BELOW EXTENDED PORTION) FROM BELOW UNLESS
CONCRETING APPLY RBR ADHESIVE CHEMICAL OVER THE SURFACE , BEFORE UNTIL ABOVE SLAB IS COMPLETED.
LAYING NEW CONCRETE. 7) EXISTING STRUCTURAL STABILITY WILL NOT BE OUR RESPONSIBILITY.
8) REFER ARCHITECTURAL DRAWINGS ALONG WITH THIS DRAWING.
9) DISCREPANCY IF ANY SHALL BE DISCUSSED WITH STRUCTURAL ENGINEER.