As Per PGCB Bid document

qdes = q0*α*K1 where K1= 1.00


= 167.64 kg/m2 ρ= 0.12
= 1643.84993082507 N/m2(Terr.-B) V= 45.00 m/s
Terrain B=Open terrain with scattered obstructions having. H= 50.00 m
heights generally less than 9.1 m q0 = 1/2 ρ V2 = 121.50
α = (H/10)1/n = 1.38

AS Per IEC 60826

1st approach:
Ter-B Ter-C
qdes = (1/2)*T*μ*(Kr*Vrb)^2*Gc*GL Combined wind Factor(From Graph), Gc = 2.43 2.85
Span factor(From Graph), GL = 0.95
= 2308.71 N/m2 (Terrain-C)) Air density correction factor, T = 0.95
μ= 1.227 kg/m3
= 2724.54 N/m2 (Terrain-B) Vrb= 45 m/s
Kr= 0.85 Terrain C= Numerous small obstacles of low height (Hedge

Kr= 1 Terrain B= Open country with few obstacles (Cultivated fie


2nd Approach:

qdes = (1/2)*T*μ*(Kr*Vz)^2*GL Vrc= Vrb*Krc


= 38.25 m/s
= 1644.642309315 α= 0.22 Terr-C
Vz= Vrc(H/10)^α
= 54.50 m/s
height (Hedges, trees, buldings)

(Cultivated field withfew trees, buildings)