Professional Documents
Culture Documents
EXCLUSIONS
1) Civil works shall not form any part of this bill including foundations, core cuts and any other kind of cutouts in any structural component etc.
RATES
1) The quoted rates are exclusive of all taxes and duties.
2) The rates shall be prepared in conjuction and with reference to the contents of S.C.C., Specification & Drawings.
3) The rates quoted shall also include for providing any temporary work or preparatory work required to execute the particular items of work.
4) The unit prices stated hereunder shall be deemed to include, but not be limited to the following :
a. Site management and supervision, labour and all costs in connection therewith, including the cost of overtime as necessary.
b. The supply, fabrication and supervision during installation of all goods and all costs in connection therewith.
c. Delivery as appropriate.
Paint, tools, equipment and all cost in connection therewith site facilities and all other costs from items that are necessary to execute the
d. Work.
e. Waste of Material.
f. Mobilization costs, overhead costs and profit.
g. Major civil works shall not form any part of this contract including foundations.
The rates for each item of work included in the schedule of quantities shall unless expressed stated otherwise, include cost of all equipment,
5) ancilliary equipment, fixing material, accessories, tools, plants, transport, labour and incidentals required for the completion of the work as
called for in the item and as per Specification and drawings.
NOTES
All the items of work under this contract shall be executed strictly in accordance with the description of the item in the schedule of
1) quantities relevant drawings and specifications read in conjunction with appropriate Indian Standard Specifications, Special conditions of
contract.
This bill is to be read in conjunction with all other project documents and deviations if any shall be brought into the notice of the consultant
2) in prior.
All the items of work given in this schedule of quantities shall be executed strictly in accordance with National Building codes 2016 and
3) requirements of the Indian standards read in conjunction with the relevant drawings, specifications and the appropriate Indian Standards.
The contractor shall visit the site and shall satisfy himself as to conditions under which the work is to be performed. No extra claim as a
4) consequence of ignorance or on grounds of insufficient description will be allowed at a later date.
No Alteration whatsoever is to be made to the text or quantities of this schedule of quantities unless alteraion is authorised in writing by
5) client. Any such alterations, notes or additions shall, unless authorised in writing be disregarded when tender documents are considered.
6) Any error in totalling in the amount column and in carrying forward totals shall be corrected.
Any error in description or in quantity or omission of items from the contract schedule shall not vitiate this contract but shall be corrected
7) and deemed to be a variation required by the owner.
1
PROJECT - JALANDHAR RAILWAY STATION
PACKAGE - DRINKING WATER SYSTEM
DETAILED ESTIMATE
S. NO. DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT
1 CHAPTER-1 : REVERSE OSMOSIS BASED PLANT
2. Filtration System:
2
3. Reverse Osmosis System: