STEEL WORKS MARCH 4, 20 29

A. REIN FORCEMENT OF CHB


By HE AREA METHOD
TD TAL AREA 383. 683 cq m
FoR VE KICAL 363. 6Bz x 2. 13 155. 77 n lohg
FR tDRIZONTAL 353. 883 x 2. 1t 760. 65 hm. lohg
T6 t4L LEN 6 TH 753. 77 n. t 760. 85 5 (4. n. lang
1514. 62 252.4 rder
G-00 252 PCs. Dmm Xe.00n lorg
lorgete
A-2. E WIRE Fog CAR
TDTAL AREA REINFOREMENT
353. 883 Sam
REFER 10 TABUE3-G - co cm VrticaL (PAUNG
PACING. AYER

353.88? s.m X 0.032 : |. 32


6. FooTING
REINFORCENENT
CoNCRETE CoVER : 75 Cm
-2 A. 1.05 t .10 1G (Ieig th)
C. I7 FOOTING : I1 x (e= 272 pee.
9. IN A G/(-15 : 5. 2| or 5 pl.

botton bors both wrye


Foo nNC E WIRE

2. G4 x I7 o88 TIEL
5. uSE 30 Cm LONG ES
E 088 X30 326. 40 n. 6.| WIE
f. CONVERT TD KOceAM
324.4
'53
C. REINFOR CEMENT OF COUMN
( malN VERI CAL REINPORCENENT)
BEND AT HEBASE GF fOOTDNG 20
tooTI NC NCL
NeL TD FFL (BACKAL)
- G.6

bonE (IEot to sEsD) -.40


q.7 TDTAL LEWTH
MO. oF bARS:

89. 4 pes
48 9. 4 ÷ G (LANOARD) lu4.9 pca (6 mm e verhal bare
0. ATERAL
TIES
: Iu X lphqitydinal bar diAnce
250
2. 48 X lateral fhie bar dianete 49 X.b mm .4 80
3. lcat dinetio of tho Columa 20 mn . 200

. 20, theretor, adopt . 20 rpa cing


NunBeR 0F LATEFAL PER cOwmN
4.
alway add 1to pacing
"20
46.5 47 Pcs
LATERAL IN 7 cO MN 47 x I7 = 799 pcs
* LENGTH 0F LATERA IES
0.075 x2 : . 15 ( CoNCPETE COVER)
30 0. 05 x 2 . lo ( Hbok )
"20
30-15
20 15
.15 X2
05 X2
G+.50 = 2
799 2 Go 58 pes

long tel bars


wir 6T
2bm =40X. 54Ch2 ue.40 900>
1-2
on£ wiee)6x9
54 = (tF 2 &504
8+|4 tnm lopes. 1.5 *6 9
=J50 15)o+.
(0 -.20 "
Bay7.5 20= |..50
4 GX
50 I-
oarc =.350+,100
=.450 -.1G) .G0D
teel long 6.Dm
500 fohing
.486 m
.l0 X48 I,30 hgl to
6:12
5= 200
(itACIN) mec) LATFRA (
PE(NFORCEMENt OTIN ToIR E2,
IpE 6.le #b-28,
ka 53 3 kg tonuot CoWiRE GJ m,15 30X.50J)
WiRE WE
FoOTING
n TRIR E1.
barl boom pet
(ebm Gn.71 10.25/ c
3.50 ps |00.550X
4.75 pue 50-950x
(.550)
bar bottoh b)
.550 t-0 50
0.40.u0-.150 VHANG
450, +.tc0 B50 0. .(50 4.-00 a) UNE
q5bHCAN INE (-490)
4m
foo1NG CIAIR E,
53
1417.4
KÊ0GRAM£:
TO eTVECON 4.
Wlre G.l l417.6 .40 X
4794
lorg
40
tied 4144 17 x282
COLMM
: N OF NO.
Thtorrecton 282 47 X tIECLÀTEEAL X BAR
INTER(ECTION: foR
WIRE TE eAL LATE D-2
F. BEAM (BI B2)
45
30

300 300 300


1B0' 40
200 200
(Right vupp ort)
L|5+ 250

B-1: (kft uport) 8|9 0.4 t .25 0.65 + (46 go bd)


: (Righ! ouppart) 35 (44t .5 (.95 t.48 33
:(D4PAN) 314 0.75 +-
t 20 0.45 X 2 1.4
.0 - (.9 (1+ (46° bend x2) 1-|+,32 .42

B2 : 2 5 0.4 t .25
Al5 : 0.4 + -25 . 45 t 0.48 : 12(right raprort
214 p.5 t 0 0.70 X L4
2.0 - -4 0. 0 + (45' end Y2) 0.60t .h-0.q2 (hibSPAN)

(tvtRL ENETH)
b- .93 4 .92 + (42 + 7.00 = Il. 08 m
= I1.0B x |2 = 144.04 m
B-2 I. 13 t |: 3 + D.92 t 5.0D =
8.18 m
- 9.18 X 5 40. 4
Dfa BEAM ENGTH 144.04 + 40.4 = (4.14