You are on page 1of 1

UNIT HIDROLOGI TARIKH: 5/12/2023

LEMBAGA URUS AIR SELANGOR (LUAS) HARI: SELASA


BORANG SENARAI SEMAK LiSS MASA: 9:00 AM
v Tiada Kemaskini data terbaru ( - )
LiSS SUNGAI SELANGOR
DATA
BIL NAMA STESEN ADA ( / ) @ CATATAN
TIADA (X)
1 Current Values
a) Empangan x
b) Muka Sauk (35) x
c) Paras Air x
d) Baraj x
e) Hujan x
f) OPAK (-)
g) Hujan Maya (Radar) x
2 Historical Data
a) Empangan x
b) Muka Sauk (35) x
c) Paras Air x
d) Baraj x
e) Hujan x
f) OPAK x
g) Hujan Maya (Radar) x
3 Forecast and Reports
a) Sg Selangor Residual Flow (barrage) (LiSS/ICMLive) Observed Flow (barrage) (ICMLive/IWRIMS)
x
3,667.70
b) Sg Tinggi Residual Flow (barrage) (LiSS/ICMLive) Observed Flow (barrage) (ICMLive/IWRIMS)
x
3,667.70
c) Kolam KL Larut Residual Flow (barrage) (LiSS/ICMLive) Observed Flow (barrage) (ICMLive/IWRIMS)
x

d) Kolam HORAS 600 Residual Flow (barrage) (LiSS/ICMLive) Observed Flow (barrage) (ICMLive/IWRIMS)
x

e) Kolam MBI Residual Flow (barrage) (LiSS/ICMLive) Observed Flow (barrage) (ICMLive/IWRIMS)
x

f) Kolam Tan Chong Residual Flow (barrage) (LiSS/ICMLive) Observed Flow (barrage) (ICMLive/IWRIMS)
x

g) NWP x
h) Corrected NWP x
i) Radar x
j) Download Report x
k) Water Audit x
l) Forecast vs Actual x
m) Forecast vs Actual (Areal) x
n) Forecast vs Actual (Point) x

LiSS SUNGAI LANGAT


DATA
BIL NAMA STESEN ADA ( / ) @ CATATAN
TIADA (X)
1 Current Values
a) Empangan x
b) Muka Sauk (35) x
c) Paras Air x
e) Hujan x
2 Historical Data
a) Empangan x
b) Muka Sauk (35) x
c) Paras Air x
e) Hujan x
3 Forecast and Reports
a) Sg Langat Residual Flow (Bkt Tampoi) (LiSS/ICMLive) Forecast Flow (Sg Langat Batu 10) (LiSS/ICMLive) Observed Flow (Sg Langat Batu 10) (ICMLive)
x
b) Sg Semenyih Residual Flow (Bkt Tampoi) (LiSS/ICMLive) Forecast Flow (LRA Sg Semenyih (LiSS/ICMLive) Observed Flow (LRA Sg Semenyih) (ICMLive)
x
c) NWP x
d) Radar x
e) Download Report x
f) Water Audit x
g) Forecast vs Actual x

Disediakan Oleh : Fatin Aqilah binti Arshad Disemak Oleh:


Nama : Fatin Aqilah binti Arshad Nama:…..........................................................
Jawatan : Penolong Jurutera (JA29) Jawatan :….....................................................
Tandatangan: Tandatangan:

fatin …....................................................................

You might also like