I. SCOPE OF WORKS
1. Design of Automatic Fire Sprinkler System
2. Installation Works (MHO Warehouse Approx. Area: 6760 sqm)
Piping
Pipe Sleeve (including fire stopping sealant)
Sprinkler Heads
Hangers and Support
Fittings
Isolation Valves
Pressure Relief Valves
Check Valves and Auxiliary valves
Drain Valves
Pressure Gauges
Check Valves
Flow Switch and Meter
3. Supply of Spare Sprinkler Head units (5% of the Total Installed Sprinkler Heads)
4. Restoration Works
5. Painting Works
6. Testing and Commissioning (Hydrostatic Testing)
7. Integration of AFSS with FDAS through supervisory devices
8. Civil / Structural Works: Including all necessary Materials, Equipment and Tools required
in the Project Execution. Contractor shall ensure that the System is Working in Terms of
Function, Safety and Reliability