LL1-2R07-0010 - A - Care & Protection Procedure
LL1-2R07-0010 - A - Care & Protection Procedure
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
DOCUMENT INFORMATION
Creation by : Phattanawadee T
Master Document CV CO CM EE EM
ES FT FF IE IF
LE ME PE PL PC
PM QM SE …….
Copied Document CV CO CM EE EM
(E-file) ES FT FF IE IF
LE ME PE PL PC
PM QM SE MR MS
MP ……
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
REVISION LOG
Revised Detail
Rev. Date
Item Page Article Description
A 11/02/2019 all all all Issue for Review
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
CONTENTS
1 GENERAL ................................................................................................................ 5
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
1 GENERAL
1.1 Intent
This Care and Protection Procedure (hereinafter referred to as “PROCEDURE”)
is intended to define the Care and Protection of purchased materials and
equipment, from the time of arrival at the site, through startup.
In this PROCEDURE, it is assumed that the materials and equipment are
adequately protected for shipment and storage by the VENDOR, in accordance
with the purchase specification or the VENDOR standard practice.
This PROCEDURE specifies the common requirements for the Care and
Protection of various types of materials and equipment.
Special Care and Protection of any specific materials or equipment shall be in
accordance with the VENDOR instruction.
1.2 Responsibilities
(1) Care and protection before Issue to SITE
The responsibility for the Care and Protection for all material and equipment
stored in Contractor’s warehouse and open storage area (s) lies with the
Construction Manager until issued to the SITE. Project Engineer shall carry
out the periodical Care and Protection with the assistance from Material
Controller and Chief of Quality Control.
(2) Care and Protection after Issue to SITE
The responsibility for the Care and Protection for all materials and
equipment issued to the SITE lies with the respective Construction
Contractor, under the control of Project Engineer until Mechanical
Completion of the Plant.
The Project Engineer is responsible for establishing the manpower
requirements, the Care and protection Schedule, and to ensure that the
Care and Protection Schedule, and to ensure that they are maintained
correctly, after issue to the SITE.
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
(3) Preservatives shall protect parts of machinery and other items from
corrosion by weather, perspiration and/or atmospheric vapors.
a. Before application, check and consider the particular environmental
conditions prevailing during transport and at the place of installation.
b. Types of preservatives are described and examples of products given
list in Table 1 and their applications are examples. This shall not
relieve VENDOR from any responsibility for proper preservation for the
contractually agreed period
(4) Cleaning
a. Cleaning shall be made to remove visible corrosion, dust, grease,
other residue of foreign materials, fingerprints, sweat, acid, alkali and
others which remain on the metallic products and caused corrosion
during transportation or storage.
b. If it is impracticable to make cleaning after assembling, parts of
machines shall be cleaned sufficiently and coated with rust
preventives as intermediate rust prevention prior to assembling and
after assembling, exposed parts shall be cleaned to remove
intermediated rust preventives and subject to final rust preventive
treatment.
(5) Drying
a. Metallic products shall be dried immediately after cleaning to remove
the solvent or attached moisture.
b. VENDOR shall adopt the most suitable drying method as it depends
on cleaning method adopted.
c. If the metallic products are washed with water, it requires drying
immediately. However, if it is impracticable to do immediate drying,
rust prevention shall be made by using water-soluble inhibitor or water
replacing rust preventive.
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
.
c. Threaded bolt holes, including the weep holes in rein-forcing
pads, shall be plugged by VENDOR before shipping. If any
missing is found, these shall be plugged with the specified
corrosion preventative compound.
(4) All machined surfaces shall be coated with a suitable corrosion
preventative compound.
3.1.2 Machinery
(1) All units shall be examined upon delivery to the SITE, for compliance
with the shipping preparation requirements.
(2) Long term storage procedures for compressor, drive and lube oil
system shall be as outlined by each VENDOR,
(3) For diesel engines, the following check and treatment shall be
made :
a) Cover all inlets and outlets to prevent ingress of moisture or
foreign materials.
b) Disconnect the battery and follow the VENDOR recommended
storage procedure.
c) Provide adequate cover for units stored outside.
3.1.3 Pumps
(1) Pumps will be supplied with a coating of the specified corrosion
inhibitor applied to all machined surfaces. The coating shall be
checked periodically, and reapplied where required.
(2) All bare metal shafts, couplings, machined parts, etc. shall be
applied with a corrosion inhibitor.
3.1.4 Package Equipment
(1) Package equipment shall be stored in the original unopened
condition, as far as possible.
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
3.2.3 Pumps
(1) All bearing housing reservoirs and oil pumps shall be filled with the
applicable lubrication oil.
(2) The pump nozzle flange covers shall be removed and the corrosion
inhibitor checked. The flanges shall be resealed, using temporary
gaskets or new gaskets if required, in lieu of this, Sub-clause (4)
below may be applied where practical.
(3) All turbines and engine driver units shall be completely enclosed and
sealed in a waterproof envelope, with desiccant inside. All
envelopes must be checked for rips and effective sealing, every
three (3) weeks.
(4) All pumps and driver shafts shall be hand rotated two (2) complete
turns, and then a further thirty-degree (30°) turn. This shall be
carried out every two (2) weeks using the correct tool, such as a
strap wrench, for this purpose, sealed openings shall be inspected at
the time of hand rotating, to ascertain tightness.
(5) All bare metal shafts, couplings, machined parts, etc. shall be
applied with a corrosion inhibitor.
(6) All bearing wells shall be applied with a corrosion inhibitor. For the
it’s fitter with bearing oil reservoirs, the specified oil shall be
replenished, as required.
(7) During installation, all efforts shall be made to minimize the
circulation of outside air within the unit, keeping all openings closed
as much as possible.
3.2.4 Package Equipment
(1) If any package equipment is pressurized with inert gas inhibitor,
protection.
(2) Measure shall be made in accordance with Clause 2.4 of this
PROCEDURE.
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
(6) Safety Valve shall be keep in a dry environment and protect them
from the weather. Do not remove the valve from the skids or crates
until immediately before installation. Do not remove flange protectors
and seating plugs until the valve is ready to be bolted into place
during the installation.
_____________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express
permission of Long Son Petrochemicals Co., Ltd.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM
VIỆT NAM
Long Son Petrochemicals Co., Ltd
LLDPE PLANT
Example of Products
Type Protective Film Application for Special Properties Preservation
requested Duration Brands
ESSO SHELL Valvoline Mobil Oil +Heilnrich
A Oily Internal preservation of Must be compatible Transport RS 335 RUST- Ensis Oil L RITZOL 6 Mobil
Note )1 drives and bearing with lubricating oil preservation at BAN 335 RITZOL CG Arma 523,524
casings used later least 12 months TECTYL 511-M
B greasy Preservation of bare May not emit Long-term RS 393 Ensis Fluid SDC ECTYL 502-C
parts cylinders, seal acids,must wash off preservation at RUST BAN 393
faces with kerosene least 12 months
C waxy Preservation of: Must protect against Permanent RB 324 RUST Ensis Fluid MD TECTYL 846 TEXVEX 39
-piston rods salt and be scratch protection for 324 TECTYL 506
-crank shaft proof machinery parts, For tropics
And in bearing area min. 12 months TECTYL 164
-shaft journals
-spare parts
E luminumcoated Additional protection for : Must be strippable Transport Branorust
wax paper -bare parts preservation
-seal faces
-shaft hubs
-piston rods
-crank shaft
-couplings
If Type “A” is used for parts which later come into contact with oils from closed circuit systems, It must be assured that preservative residues will not clog the line filters of the oil
circulation system (10mm)
___________________________________________________________________________________________________________________________________
Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd.