WEEKLY ACCOMPLISHED DRAWINGS SUMMARY REPORT


Project : KIANGAN COMBO 3 MINI HYDRO POWER PLANT Date Prepared : 11/24/2023
Prepared by: Larsen Verlo A. De Castro WADSR No. 3 Period Covered : 20/11-24/11
Response Drawing
Item No. Drawing Title Drawing No./ Rev. No. Structure Submitted No. Pages Submission Type Date Responded
Status Category
IBULAO
1 IBULAO POWERHOUSE DOORS AND WINDOW SCHEDULE KMHPP-SCIC-SD-I-PH-248/ REV 2 21-Nov-23 1 RV,SD STRUCTURAL
POWERHOUSE
RCPC & SLOPE CIVIL/
2 LOT 18 PROPOSED RCPC 4A & SLOPE PROTECTION PLAN AND DETAILS KMHPP-SCIC-SD-I-SEC2-068/ REV 1 21-Nov-23 1 FS,SD
PROTECTION STRUCTURAL
RCPC & SLOPE CIVIL/
3 LOT 18 PROPOSED RCPC 4A & SLOPE PROTECTION SECTION & PROFILE KMHPP-SCIC-SD-I-SEC2-069/ REV 1 21-Nov-23 1 FS,SD
PROTECTION STRUCTURAL
IBULAO HEADRACE(OVERALL) LOCATION OF OLD, MODIFIED & NEW HEADRACE CIVIL/
4 KMHPP-SCIC-SD-I-HR-087/ REV 1 HEADRACE 23-Nov-23 1 RV,SD
DESIGN STRUCTURAL
AD,SD,FOR CIVIL/
5 IBULAO HEADRACE AS-BUILT CONCRETING WORKS FOR REFERENCE HEADRACE 23-Nov-23 1
REFERENCE STRUCTURAL
AD,SD,FOR CIVIL/
6 IBULAO HEADRACE LOCATION OF OLD, MODIFIED & NEW HEADRACE DESIGN FOR REFERENCE HEADRACE 24-Nov-23 1
REFERENCE STRUCTURAL
AD,SD,FOR CIVIL/
7 IBULAO HEADRACE LOCATION OF OLD, MODIFIED & NEW HEADRACE DESIGN FOR REFERENCE HEADRACE 24-Nov-23 1
REFERENCE STRUCTURAL
AD,SD,FOR CIVIL/
8 IBULAO HEADRACE LOCATION OF OLD, MODIFIED & NEW HEADRACE DESIGN FOR REFERENCE HEADRACE 24-Nov-23 1
REFERENCE STRUCTURAL
AD,SD,FOR CIVIL/
9 IBULAO HEADRACE LOCATION OF OLD, MODIFIED & NEW HEADRACE DESIGN FOR REFERENCE HEADRACE 24-Nov-23 1
REFERENCE STRUCTURAL
AD,SD,FOR CIVIL/
10 IBULAO HEADRACE LOCATION OF OLD, MODIFIED & NEW HEADRACE DESIGN FOR REFERENCE HEADRACE 24-Nov-23 1
REFERENCE STRUCTURAL
AD,SD,FOR CIVIL/
11 IBULAO HEADRACE LOCATION OF OLD, MODIFIED & NEW HEADRACE DESIGN FOR REFERENCE HEADRACE 24-Nov-23 1
REFERENCE STRUCTURAL
AD,SD,FOR CIVIL/
12 IBULAO HEADRACE LOCATION OF OLD, MODIFIED & NEW HEADRACE DESIGN FOR REFERENCE HEADRACE 24-Nov-23 1
REFERENCE STRUCTURAL

TOTAL PAGES 12 Note : Submission every Friday of the week


LEGENDS
Prepared by & Date Signed : Verified/ Checked by & Date Signed : FS FIRST SUBMISSION
RV REVISION
LARSEN VERLO A. DE CASTRO LEONARDO D. ESTOCAPIO SD SHOP DWG.
AutoCad Operator ENGINEERING HEAD AD AS-BUILT DWG.