Sta Clara International Corporation

WEEKLY ACCOMPLISHED DRAWINGS SUMMARY REPORT


Project : KIANGAN COMBO 3 MINI HYDRO POWER PLANT Date Prepared : 2/2/2024
Prepared by: Larsen Verlo A. De Castro WADSR No. 11 Period Covered : 1/29-31/2024, 2/1-2/2024
Target Submission Delay/ Total Pages Drawing
Item No. Drawing Title Drawing No./ Rev. No. Structure Submitted No. Pages Submission Type Date Responded Response Status
Date Advance Days Category
1 IBULAO POWER HOUSE MEZZANINE FLOOR PLAN & DETAILS KMHPP-SCIC-SD-I-PH-266/REV 1 POWERHOUSE 31-Jan-24 31-Jan-24 1 0 0 RV,SD 1/29/2024 STRUCTURAL
2 IBULAO POWERHOUSE MEZZANINE FLOOR PLAN SLEEVES PLAN KMHPP-SCIC-SD-I-PH-267/REV 1 POWERHOUSE 31-Jan-24 31-Jan-24 1 0 0 RV,SD 1/29/2024 STRUCTURAL
IBULAO POWERHOUSE MEZZANINE FLOOR SLAB REINFORCEMENTS
3 KMHPP-SCIC-SD-I-PH-268/REV 1 POWERHOUSE 31-Jan-24 31-Jan-24 1 0 0 RV,SD 1/29/2024 STRUCTURAL
DETAILS ALONG Y-AXIS

IBULAO POWERHOUSE MEZZANINE FLOOR SLAB REINFORCEMENTS


4 KMHPP-SCIC-SD-I-PH-269/REV 1 POWERHOUSE 31-Jan-24 31-Jan-24 1 0 0 RV,SD 1/29/2024 STRUCTURAL
DETAILS ALONG Y-AXIS
IBULAO POWERHOUSE MEZZANINE FLOOR SLAB REINFORCEMENTS
5 KMHPP-SCIC-SD-I-PH-270/REV 1 POWERHOUSE 31-Jan-24 31-Jan-24 1 0 0 RV,SD 1/29/2024 STRUCTURAL
DETAILS ALONG X-AXIS
IBULAO POWERHOUSE MEZZANINE FLOOR SLAB REINFORCEMENTS
6 KMHPP-SCIC-SD-I-PH-271/REV 1 POWERHOUSE 31-Jan-24 31-Jan-24 1 0 0 RV,SD 1/29/2024 STRUCTURAL
DETAILS ALONG X-AXIS
7 IBULAO POWER HOUSE STAIR "A" PLAN AND DETAILS FOR REFERENCE POWERHOUSE 31-Jan-24 31-Jan-24 1 0 0 SD 1/30/2024 STRUCTURAL
8 IBULAO POWER HOUSE STAIR "B" PLAN AND DETAILS FOR REFERENCE POWERHOUSE 31-Jan-24 31-Jan-24 1 0 0 SD 1/30/2024 STRUCTURAL
IBULAO POWER HOUSE TAILRACE PLAN AND REINFORCEMENT DETAILS
10 ONGOING POWERHOUSE 16-Feb-24 10 0 0 FS,SD 2/1/2024 STRUCTURAL

TOTAL (AVERAGE DAYS) 18 0.00 0 Note : Submission every Friday of the week
LEGENDS
Prepared by & Date Signed : Verified/ Checked by & Date Signed : WEEKLY PERFORMANCE SCORE FS FIRST SUBMISSION
2/2/2024 KPI SCORE 4 RV REVISION
LARSEN VERLO A. DE CASTRO LEONARDO D. ESTOCAPIO SD SHOP DWG.
AutoCad Operator ENGINEERING HEAD AD AS-BUILT DWG.
MONDAY TUESDAY WEDNESDAY THURSDAY

upo with shrimp


torta paksiw na tilapia
LUNCH kamatis/pork omelet
sinampalukan
inabraw vegies nilaga pork
DINNER chicken feet tinola

INGREDIENTS:
ITEM QUANTITY UNIT
talong 4 pcs.
egg 8 pcs.
inabraw vegies 1 ls
tilapia paksiw depends on size pcs.
tilapia inabraw small 2 p.cs
upo 1 pc
kamatis 1 pack
chicken feet 0.5 kg
gabi 1-2 pc
pechay 1 tumpok
sigang mix 1 pack
pork 1 kg
repolyo medium 1 pc
potato 3-4 pcs.
chicken 0.5 kg
sayote 2-3 pcs.
shrimp(kuros) 2 packs
suka 1 pack
soy 1 pack
sibuyas 1 pack
bawang 1 pack
luya 1 pack
chicken cube 1 pc
pork cube 2 pcs.
paminta 5 pcs.
FRIDAY

pork adobo

You might also like