HMSI
Made by
THEME
ANGLE OF GUIDE BEND NOT OK 96 degree (Spec.-90± 3 degrre) SNO Probable Cause Ideal Condition Actual Condition Result P. BHAYANA AJAY PAWAR D. MALIK
[ Situation Event Symptom, Complaints, Number of occurrences, actions ] [ Identified facts result of verification, cause analysis, manufacturing quality status on the applicable date ]
SPECIFICATION: Parts should be as per drg. ACTUAL: parts not as per drg
1. TYPE OF OCCURANCE CABLE CAME OUT DURING ASSY. PROBLEM CONTENTS: Guide bending angle ng
OCCURANCE
2 .PLACE OF OCCURANCE HMSI PROCESS FLOW DIAGRAM OF GUIDE BENDING :-
SUB SUPPLIER BENDING PROCESS NOT ESTABLISHE ( NO PROCESS QAV DONE BY ADVIK)
3. CONDITIONS AND
CIRCUMSTANCES OF SUB ASSY 2 ( SUB ASSY.
PROBLEM WHEN IT
DURING ASSY. 1 + SPRING + LEVER +
OCCURED BOP REC. & TRACEBILITY MARKING SUB ASSY 1 (BRKT L PIN PIVOT + LEVER
INSPECTION HANDLE + SW ASSY.) COMP. + BOLT + CABLE
COMP 1ST
NG GUIDE
4. DATE OF OCCURANCE 1/9/2016
Bending angle not ok(96 degree) OUTFLOW
SUB ASSY 3 & SW NO CHECK POINT AT FINAL "Q" GATE AND ASSY. ( NO POTENTIAL CAUSE ANALYSED & CONSIDERED IN FMEA)
5. NUMBER OF CASES 04/30 NOS. SUB ASSY 4 (BRKT BRK WORKING CHECKING (
+ EQUALIZER + SUB ASSY 2 + NUT
FINAL ASSY & FINAL STOPPER EQUALIZER + MOUNTING SUB ASSY FLANGE + E RING
INSPECTION SPRING DELAY + 3 ON HANDLE
COVER + CABLE COMP
DETAILS :- Material checked at HMSI end & Supplier end as below : 2 FR & 2ND RR + BOLT
Material packed as Finish Good checked again details as below: FACTS VERIFICATION CAUSE ANALYSIS
SR.
S.NO LOCATION QTY. CHECKED NG PARTS Probable Cause Ideal Condition Actual Condition Result
NO Fishbone Diagram
Man Machine
2 2 1st bending AS PER SPEC. OK OK
OPERATOR AWARENESS
3 3 2nd bending AS PER SPEC. OK OK
NO CHECKPOINT
4 3rd bending AS PER SPEC. NG NG
Guide bending angle not ok
Root Cause of Problem ( How the Problem occurred, duplication test, problem analysis ) Counter Measure Taken ( Measure contents, expected Results) Confirmation of effectiveness ( Actual Results After Counter Measure Taken )
1 TIER 2 PROCESS NOT ESTABLISHED ( INADEQUATE BENDING PROCESS) 1 SUB SUPPLIER PROCESS ESTABLISHED Done
S.NO DATE LOT QTY RESULT REMARKS
SUB SUPPLIER PROCESS QAV-2 DONE & ALL COUNTERMEASURE CLOSED ( QAV PLAN MADE
2 QAV-2 AT SUB SUPPLIER WAS NOT ENOUGH 2 1
FOR ALL SUB SUPPLIERS)
3 POTENTIAL FAILURE NOT CONSIDERED IN FMEA 3 FMEA UPDATED FOR ALL BOP PARTS FOR POTENTIAL FAILURE 2
1 NO CHECK POINT AT ASSY. & FINAL "Q" GATE 1 100% CHECK POINT ADDED ON ASSY. LINE Done
TRAINING TO OPERATORS/ INSPECTORS & OPL DISPLAYED AT ASSY. & FINAL INSPECTION
2 NO OPERATOR / INSPECTOR AWARENESS 2
STAGE
3 WEAK RECEIVING INSPECTION STANDARD 3 RECEIVING INSPECTION STANDARD REVISED FOR BENDING ANGLE CHECK n
(BENDING IN DIE BY POWER PRESS PROVIDE THE BLOCK TO DETECT THIS ANGLE
Step 1 2 3 4 5
).Excess movement of lever in manual bending No any provision to control the lever Man depend process control
C Occurrence Guide a tilt welded Bending angle not ok
fixture stroke length
o
n
t
e
n
t
s Outflow Guide a ng angle flow out No detection in fixture for angle varify