Well Assessment Result for Rig GBT # 09

Date : 7-Jan-24
Location : KB # 273
Assesment by : SYAHRUL

Data Well Well Pad condition

Distanc
No Under Junction Prod. Prod. Line Chemical
Well Well Access Pad size e to Surface cable Well Transform Prod. Block House Guy line Need
Well No.
Type status road properly power
ground box
protector guard er
QCI
Line valve
Line Pressure schale Oil Spill
Keeping position
Building or civilians property SimOps
cable electric Header switch inhibitor
line

OIL PROD 1 PAD 2 Will


1 KB # 273 (ESP)
ON Good
WELL
95 FT
Check
Yes N/A Good Yes YES OK OK OK - N/A NO 0K OK N/A

Well head Assessories

Packing Lock nut Master


No Master Master Number of Need improvement item Distance Remark
Well head element / of By pass Casing Flange Master Check Heigh of well Tubing Casing Gas Press Master valve Flange bolt Sample
valve valve flange
size doughnut tubing line Valve bolts valve Valve head Pressure Pressure Content Gauge valve type rating diameter cock
size connection bolts
hanger pressure

4 EA 1 ea
7-1/16" x 1 EA
1 QCI (comple 2 EA OK OK OK 2.7 FT - 1 EA Good - (Broken - Screw - - DIKE NEED DRESS UP READY TO EXECUTE
2000 Good
te) )

Assessment by

SYAHRUL
( Rig Supt )