SAMPLING PLAN

LOT SIZE SAMPLE SIZE

UPTO 1000 25 NOS OR 10% WHICHEVER IS LOWER


NOS
ACCEPTANCE / REJECTION CRITERIA:
IF 100% SAMPLES ARE ACCEPTED , ACCEPT ENTIRE LOT
IF 100% SAMPLES ARE REJECTED, REJECT ENTIRE LOT

IF UPTO 2 SAMPLES REJECTED , SEGREGATE REJECTION AND THEN ACCEPT ENTIRE BALANCE
LOT
IF MORE THAN 2 SAMPLES REJECTED. THEN TAKE DOUBLE SAMPLE SIZE AND REINSPECT , IF
100% ACCEPTED, ACCEPT LOT AND IF IN CASE OF REJECTION REPORTED THEN REJECT ENTIRE
LOT
1001-3000 40 NOS
ACCEPTANCE /REJECTION CRITERIA:
IF 100% SAMPLES ARE ACCEPTED , ACCEPT ENTIRE LOT
IF 100% SAMPLES ARE REJECTED, REJECT ENTIRE LOT

IF UPTO 4 SAMPLES REJECTED , SEGREGATE REJECTION AND THEN ACCEPT ENTIRE BALANCE
LOT
IF MORE THAN 4 SAMPLES REJECTED. THEN TAKE DOUBLE SAMPLE SIZE AND REINSPECT , IF
100% ACCEPTED ,ACCEPT LOT AND IF IN CASE OF REJECTION REPORTED THEN REJECT ENTIRE
LOT
3001-5000 50 NOS
ACCEPTANCE / REJECTION CRITERIA
IF 100% SAMPLES ARE ACCEPTED , ACCEPT ENTIRE LOT
IF 100% SAMPLES ARE REJECTED, REJECT ENTIRE LOT

IF UPTO 6 SAMPLES REJECTED , SEGREGATE REJECTION AND THEN ACCEPT ENTIRE BALANCE
LOT
IF MORE THAN 6 SAMPLES REJECTED. THEN TAKE DOUBLE SAMPLE SIZE AND REINSPECT , IF
100% ACCEPTED ,ACCEPT LOT AND IF IN CASE OF REJECTION REPORTED THEN REJECT ENTIRE
LOT
ABOVE 5000 75 NOS
ACCEPTANCE / REJECTION CRITERIA:
IF 100% SAMPLES ARE ACCEPTED , ACCEPT ENTIRE LOT
IF 100% SAMPLES ARE REJECTED, REJECT ENTIRE LOT

IF UPTO 8 SAMPLES REJECTED , SEGREGATE REJECTION AND THEN ACCEPT ENTIRE BALANCE
LOT
IF MORE THAN 8 SAMPLES REJECTED. THEN TAKE DOUBLE SAMPLE SIZE AND REINSPECT , IF
100% ACCEPTED, ACCEPT LOT AND IF IN CASE OF REJECTION REPORTED THEN REJECT ENTIRE
LOT
SAMPLING PLAN

INPROCESS INSPECTION

SAMPLING: ONCE EVERY HOUR

ACCEPTANCE / REJECTION CRITERIA:


IF SAMPLE ACCEPTED, PROCEED FURTHER PROCESSING.
IF SAMPLE NOT ACCEPTED, REJECT AND PROCEED FURTHER PROCESSING; IN CASE OF REWORK, KEEP
IN DESIGNATED AREA AND RE-INSPECT AND THEN CHECK FOR ACCEPTANCE OR REJECTION, AS
APPLICABLE.

FINAL INSPECTION

SAMPLING: 100%

ACCEPTANCE / REJECTION CRITERIA:


IF SAMPLE ACCEPTED, PROCEED FURTHER INSPECTION.
IF SAMPLE NOT ACCEPTED, REJECT AND PROCEED FURTHER INSPECTION; IN CASE OF REWORK, KEEP
IN DESIGNATED AREA AND RE-INSPECT AND THEN CHECK FOR ACCEPTANCE OR REJECTION, AS
APPLICABLE.

PRE-DISPATCH INSPECTION

SAMPLING: 100%

ACCEPTANCE / REJECTION CRITERIA:


IF SAMPLE ACCEPTED, PROCEED FURTHER INSPECTION.
IF SAMPLE NOT ACCEPTED, REJECT AND PROCEED FURTHER INSPECTION; IN CASE OF REWORK, KEEP
IN DESIGNATED AREA AND RE-INSPECT AND THEN CHECK FOR ACCEPTANCE OR REJECTION, AS
APPLICABLE.