Professional Documents
Culture Documents
Rangaswamy
Professor/EEE
C/P
D/A
HPH
LPH
F/P
BIHER EEE 3
COMPONENTS OF THERMAL POWER PLANT
Boiler Cooling Water System
Turbine Instrument Air System
Generator Service Air System
Demineralization Potable Water System
Plant
HV/LV Electrical System
Ash handling
Uninterrupted Power Supply
Fuel Handling
DCS Network
Sea Water Intake
BIHER EEE 4
Thermal power plant consists of the
following four main circuits :
BIHER EEE 5
WATER SYSTEM
B STEAM
O
I
L
E C COOLING
R O HOT WATER
N TOWER
D
E
N
D.M.
S
ECONOMIZER E
PLANT R
COOL WATER
B.F.P
BIHER EEE 6
STEAM SYSTEM
R.H.
condenser
BIHER EEE 7
BIHER EEE 8
BIHER EEE 9
BIHER EEE 10
BOILER CONTROLS
• Combustion Control
BIHER EEE 12
GENERATOR CONTROLS
• MW control
• Runback control
• Capability of the Generator
• Variation of terminal voltage
• Frequency variation
• Temperature of the coolants
• Over loading
• Stator winding temperature
BIHER EEE 13
STEAM
WATER
GENERATOR
TURBINE
FUEL
B
O
I
AIR L
E
R
INPUT/OUTPUT
BIHER EEE 14
FUEL
CONTROL
B
O
I
L
E
R
GEN TURBINE
CONTROL&DEMAND SIGNAL
BIHER EEE 15
THROTTLE PRESSURE LOAD CONTROLLER
CONTROLLER
COMBUSTION
CONTROL Legends
DRUM WATER
T-Turbine
G-Generator
O2-Oxygen
BOILER
FUEL
O2
FLUE GAS
AIR
Block diagram for combustion
O2 TRIM control of boiler
BIHER EEE 16
CONTROLLERS
• PID Based Controller
• Feedback Controller
• Cascade Controller
• Split-Range Controller
• Ratio Controller
BIHER EEE 17
ADVANCED CONTROLLERS
• Adaptive Controller
• Scheduled Adaptive Controller
• Self-adaptive Controller
• Model-Reference Adaptive Controller
• Gain Scheduled Controller
• Predictive controllers
• Intelligent controllers
BIHER EEE 18
INTELLIGENT CONTROLLERS
NEURAL NETWORK
FUZZY CONTROLLERS
NEURO-FUZZY CONTROLLERS
EXPERT CONTROLLERS
BIHER EEE 19
CONTROL ROOM
BIHER EEE 20