This document contains a schedule for building tasks including the description, duration, start and end dates, required materials, provider, unit cost and total cost for each task. The schedule allows tracking of building progress by listing the tasks, timing, resource needs and costs over the construction period.
This document contains a schedule for building tasks including the description, duration, start and end dates, required materials, provider, unit cost and total cost for each task. The schedule allows tracking of building progress by listing the tasks, timing, resource needs and costs over the construction period.
This document contains a schedule for building tasks including the description, duration, start and end dates, required materials, provider, unit cost and total cost for each task. The schedule allows tracking of building progress by listing the tasks, timing, resource needs and costs over the construction period.
Tasks Description Duration Start End Materials/ Provider Unit TOTAL
Date Date Dependencies (location) Cost COST(ksh) e.g Roofing Setting ceiling frame 1 days 18.03.24 24.03.24 3 inch nails - 4kg Karen X- Hardware 120 480 BUILDING
Tasks Description Duration Start End Materials/ Provider Unit TOTAL
Date Date Dependencies (location) Cost COST BUILDING
Tasks Description Duration Start End Materials/ Provider Unit TOTAL