Description of Change:

PROJECT: SOLAIRE NORTH DATE: February 01, 2023


SUBJECT: L1 Driveway Widening_Operations CR

ORIGINATOR: DRAWING LEVEL: DESCRIPTION OF CHANGE ATTACHMENTS:

Operations Level - 1 This CR is raised to measure the cost impact of L1 driveway widening
 CR-SK-01- Key Plan
Change Request are as follows:  CR-SK-02- VIP Driveway
1. VIP Driveway (see CR-SK-02)  CR-SK-03- SOLA Exit
a Demolition of existing planter walls affected by widening  CR-SK-04- Main Entrance
b Construct new planter wall and add new beam  CR-SK-05- Round About
c Hacking of exposed beams
d Steel jacketing of affected beams (see Sy2 detail)
2. SOLA Exit Driveway (see CR-SK-03)
a Demolition of existing planter wall affected by widening
b Construct new planter wall
3. Main Entrance Driveway (see CR-SK-04)
a Demolition of existing planter wall and planter slab affected
by widening
b Construct new planter wall and slab
c Hacking and retrofitting of exposed beams
d Filling of structural styro (with 50mm screed) for the dropped
slabs to level with the driveway
4. Round About Driveway (see CR-SK-05)
a Demolition of existing planter wall affected by widening
b Filling of structural styro (with 50mm screed) for the dropped
slabs to level with the driveway

Prepared by: Romer Cadiz