DREAM BIG HOLDINGS DIVE RESORT - BUILDING C SITE CLEARANCE/PREPARATION

Qty Unit Rate CI$ c

SITE CLEARANCE/PREPARATION
Preliminary site work

Location of underground services; The contractor


should refer to the site works section of this BQ in
conjunction with the Civil Engineering drawings when
a pricing this item ITEM 0.00 0.00

Excavating alongside existing underground services;


The contractor should examine the Site Works
Section of this BQ and the Civil Engineers drawings
to ascertain the location of existing services and
b allow here for excavating along side or over these ITEM 0.00 0.00

Page 1
To Summary CI$ 0.00

Page 2
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C SUBSTRUCTURE

Qty Unit Rate CI$ c

SUBSTRUCTURE
Excavation and Earthwork - All Quantities in this
Section are Provisional

Excavation, commencing at formed level, not


exceeding 5 feet deep including working space,
temporary measures to preserve the surfaces from
collapse and all attendant risk
a Foundation trenches 538 CF 0.00 0.00
Disposal
b Dispose of excavated materials off site 538 CF 0.00 0.00
Keep all excavations free from water arising from
c any source ITEM 0.00 0.00
Filling
Backfilling to all classes of excavations with
d engineered fill and compacted as specified 298 CF 0.00 0.00

Fill below ground bearing slabs with approved


engineered fill material layered and compacted as
e specified 4928 CF 0.00 0.00
Surface treatments
f Compacting surface of excavations 2212 SF 0.00 0.00

Treat surface of ground and sides of excavations


under building with approved chemicals to eradicate
g and prevent sub-subterranean termites 2802 SF 0.00 0.00
Membranes

Minimum 1000 gauge polythene membrane laid


between hardcore filling and ground bearing slabs,
h including all sides and end laps 1643 SF 0.00 0.00
Concrete Work

4000 PSI reinforced in-situ concrete filled into


formwork and packed and vibrated around
reinforcement in
i Wall foundations 538 CF 0.00 0.00
j Columns 18 CF 0.00 0.00
k Slab on grade, 5" thick 754 CF 0.00 0.00
l Thickenings under slab 55 CF 0.00 0.00

Page 3
To Collection CI$ 0.00

Page 4
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C SUBSTRUCTURE

Qty Unit Rate CI$ c

SUBSTRUCTURE continued ...


Concrete Work continued ...

Formwork and supports including release agent and


making good exposed faces of concrete after removal
to
Foundations
a Vertical sides of wall foundations 591 SF 0.00 0.00
Columns
b Columns 94 SF 0.00 0.00
Slabs and floors
c Edges of slab on grade, 5" thick 366 LF 0.00 0.00
Vertical or battering sides of under slab
d thickenings, not exceeding 12" 494 LF 0.00 0.00

High yield steel deformed bar reinforcement; rates to


include for laps, bends, hooks, tying wire and
spacers, as general reinforcement in
Wall foundations
e #5 bars 1029 LBS 0.00 0.00
Columns
f #4 bars 187 LBS 0.00 0.00
Slab on grade
g #4 bars 2778 LBS 0.00 0.00
Slab thickenings
h #4 bars 379 LBS 0.00 0.00

High yield steel deformed bar reinforcement; rates to


include for laps, bends, hooks, tying wire and
spacers, as links, stirrups bindings and hoops in
Wall foundations
i #4 bars 567 LBS 0.00 0.00
Columns
j #3 bars 34 LBS 0.00 0.00
Concrete Sundries
Surface finishes to in-situ concrete
k Steel power floating to concrete slabs 1808 SF 0.00 0.00
Joints
l Saw cut joints 14 LF 0.00 0.00

Page 5
To Collection CI$ 0.00

Page 6
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C SUBSTRUCTURE

Qty Unit Rate CI$ c

SUBSTRUCTURE continued ...


Blockwork

Concrete masonry units, laid and jointed in mortar; all


pockets filled with 3000 PSI concrete, built around
vertical and horizontal reinforcement (measured
separately)
a 8" thick blockwalls, Provisional 718 SF 0.00 0.00
Mild steel bars ASTM A-615 Grade 60 reinforcement
in accordance with Engineer's details
b #4 bars vertically in block walls, bent, Provisional 1332 LBS 0.00 0.00

Page 7
To Collection CI$ 0.00

Page 8
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C SUBSTRUCTURE

Qty Unit Rate CI$ c

Collection

Total from Page 2 CI$ 0.00

Total from Page 3 CI$ 0.00

Total from Page 4 CI$ 0.00

Page 9
To Summary CI$ 0.00

Page 10
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C FRAME

Qty Unit Rate CI$ c

FRAME
Concrete Works

4000 PSI reinforced in-situ concrete filled into


formwork and packed and vibrated around
reinforcement in
a Belt beams below slabs 233 CF 0.00 0.00
b Columns 125 CF 0.00 0.00
c Lintels 84 CF 0.00 0.00
d Cills 10 CF 0.00 0.00

Formwork and supports including release agent and


making good exposed faces of concrete after removal
to
Sides and soffits of belt beams (measured below
e the slab) 939 SF 0.00 0.00
f Vertical sides of columns 664 SF 0.00 0.00
g Sides and soffits of lintels 344 SF 0.00 0.00
h Sides of cills 86 LF 0.00 0.00

High yield steel deformed bar reinforcement; rates to


include for laps, bends, hooks, tying wire and
spacers, as general reinforcement in
Beams
i #4 bars 152 LBS 0.00 0.00
j #5 bars 1129 LBS 0.00 0.00
k #6 bars 274 LBS 0.00 0.00
Columns
l #4 bars 518 LBS 0.00 0.00
m #5 bars 180 LBS 0.00 0.00
Lintels
n #4 bars 238 LBS 0.00 0.00
o #5 bars 209 LBS 0.00 0.00
Cills
p #4 bars 33 LBS 0.00 0.00

High yield steel deformed bar reinforcement; rates to


include for laps, bends, hooks, tying wire and
spacers, as links, stirrups bindings and hoops in
Beams
q #3 bars 215 LBS 0.00 0.00

Page 11
To Collection CI$ 0.00

Page 12
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C FRAME

Qty Unit Rate CI$ c

FRAME continued ...


Concrete Works continued ...

High yield steel deformed bar reinforcement; rates to


include for laps, bends, hooks, tying wire and
spacers, as links, stirrups bindings and continued ...
Columns
a #3 bars 253 LBS 0.00 0.00
Lintels
b #3 bars 164 LBS 0.00 0.00

Page 13
To Collection CI$ 0.00

Page 14
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C FRAME

Qty Unit Rate CI$ c

Collection

Total from Page 6 CI$ 0.00

Total from Page 7 CI$ 0.00

Page 15
To Summary CI$ 0.00

Page 16
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C UPPER FLOORS

Qty Unit Rate CI$ c

UPPER FLOORS
Concrete Works

4000 PSI reinforced in-situ concrete filled into


formwork and packed and vibrated around
reinforcement in
a Suspended slabs 6" thick 106 CF 0.00 0.00
b Suspended slabs 8" thick 506 CF 0.00 0.00

Formwork and supports including release agent and


making good exposed faces of concrete after removal
to
c Horizontal soffits of suspended slabs 971 SF 0.00 0.00
d Edges of suspended slabs not exceeding 12" 237 LF 0.00 0.00

High yield steel deformed bar reinforcement; rates to


include for laps, bends, hooks, tying wire and
spacers, as general reinforcement in
Suspended slabs
e #4 bars 3291 LBS 0.00 0.00
Surface finishes to in-situ concrete
f Steel power floating to concrete slabs 971 SF 0.00 0.00

Page 17
To Summary CI$ 0.00

Page 18
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C STAIRS AND LANDINGS

Qty Unit Rate CI$ c

STAIRS AND LANDINGS


Concrete Works

4000 PSI reinforced in-situ concrete filled into


formwork and packed and vibrated around
reinforcement in
a Stairs 57 CF 0.00 0.00
b Landings, 8" thick 31 CF 0.00 0.00

Formwork and supports including release agent and


making good exposed faces of concrete after removal
to
c Horizontal soffits of suspended slabs 46 SF 0.00 0.00
d Sloping soffits of stairs 57 SF 0.00 0.00
e Stair stringer including profile cutting 39 SF 0.00 0.00
f Edges of suspended slabs not exceeding 12" 47 LF 0.00 0.00
g Edges of risers not exceeding 12" 82 LF 0.00 0.00

High yield steel deformed bar reinforcement; rates to


include for laps, bends, hooks, tying wire and
spacers, as general reinforcement in
Stairs and landings
h #4 bars 517 LBS 0.00 0.00
i #5 bars 31 LBS 0.00 0.00
Surface finishes to in-situ concrete
j Floating to concrete slabs 57 SF 0.00 0.00

Page 19
To Summary CI$ 0.00

Page 20
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ROOFING

Qty Unit Rate CI$ c

ROOFING
Pitched Roof

Built up roof trusses and associated timber support


members and metal connections. Contractor to
provide shop drawings from truss manufacturer for
a Engineer's approvals (Area: 1794 SF) ITEM 0.00 0.00
b 5/8" treated plyboard sheets fixed to roof trusses 1794 SF 0.00 0.00
Built up blocking comprising 5/8" plyboard, 2"x4"
c and 2" x 6" pressure treated members 156 LF 0.00 0.00
Block, 2" x 6" on top of wall pressure treated
d members 39 NR 0.00 0.00
e Timber fascias, 2" x 10" pressure treated members 181 LF 0.00 0.00
Metalwork - Pitched Roof
f 1/2" x 8" LG J bolts 39 NR 0.00 0.00
g Hurricane straps 78 NR 0.00 0.00
h Any other fittings not specifically mentioned above ITEM 0.00 0.00
Roof finish

Standing seam metal roofing, with Kynar 500 finish,


gauge and colour as specified including all supporting
edge and joint flashing, accessories and trims for a
complete installation
i Sloping 5:12 1794 SF 0.00 0.00
Insulation
Bio based or sim. foam insulation between trusses,
j 6" thick 892 SF 0.00 0.00
Waterproofing
Allow for waterproofing system including edge
treatments

Grace Vycor Ultra ice and water shield or sim.


applied to plywood sheathing (measured
k separately) 1794 SF 0.00 0.00
Eaves

Continuous 3/4" cementitious soffit board, fixed to


2" x 4" pressure treated timber framing with 1" x 1"
blocking, fixed to block walls with 3/8" x 4"LG exp.
l bolts at 48" oc (23nr) 506 SF 0.00 0.00
m Eave vents 18 NR 0.00 0.00

Page 21
To Collection CI$ 0.00

Page 22
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ROOFING

Qty Unit Rate CI$ c

ROOFING continued ...


Roof finish continued ...
Painting and decorating

Prepare surfaces and apply prime coat and (3)


coats oil paint as per manufacturer's
recommendations. Colour and type as per Client's
recommendations
a Timber fascias, 2" x 10" 181 LF 0.00 0.00
Dryvit finish mix and apply as per manufacturer's
recommendations
b Eaves 506 SF 0.00 0.00
Rainwater Disposal
c Rainwater gutters fixed to timber fascia 183 LF 0.00 0.00
Rainwater down pipes, 3" dia. fixed to blockwalls
d and discharge to cistern 161 LF 0.00 0.00
Finals
e Deco finals on roof 3 NR 0.00 0.00

Page 23
To Collection CI$ 0.00

Page 24
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ROOFING

Qty Unit Rate CI$ c

Collection

Total from Page 11 CI$ 0.00

Total from Page 12 CI$ 0.00

Page 25
To Summary CI$ 0.00

Page 26
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C EXTERNAL WALLS

Qty Unit Rate CI$ c

EXTERNAL WALLS
Blockwork

Concrete masonry units, laid and jointed in mortar all


pockets filled with 3000 PSI concrete, built around
vertical and horizontal reinforcement (measured
separately)
a 8" thick blockwalls 3202 SF 0.00 0.00
Mild steel bars ASTM A-615 Grade 60 reinforcement
in accordance with Engineer's details
b #4 bars vertically in block walls, bent 2557 LBS 0.00 0.00
c #4 bars horizontally in block walls 1040 LBS 0.00 0.00
Balustrades
Railings fixed to concrete surfaces including final
paint finishes type as specified
d 36" high guardrail, horizontal 83 LF 0.00 0.00

Page 27
To Summary CI$ 0.00

Page 28
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C WINDOWS AND EXTERNAL DOORS

Qty Unit Rate CI$ c

WINDOWS AND EXTERNAL DOORS

PGT or equally approved aluminum framed


windows; Miami Dade: hurricane large missile
impact rated; Kynar 500-match terratone. Please
refer to Window Schedule for additional
information
Casement windows
a Ref OP11, 12, 13 or sim.: 2' x 6' 3 NR 0.00 0.00
b Ref OP04, 08, 09, 21, 22, 23 or sim.: 2' x 4'-6" 9 NR 0.00 0.00
c Ref OP14, 24 or sim.: 4' x 5' 2 NR 0.00 0.00

Louvres including final paint finishes. Kynar


500-match terratone. Please refer to window
schedule for additional information
Louvres
d Ref LV-03, 04 or sim.: 2' x 4'-6" 2 NR 0.00 0.00
e Ref LV-A or sim.: 13'-8" x 2' 1 NR 0.00 0.00

PGT or equally approved solid wood doors with


glazed panel swing out; Miami Dade: hurricane
large missile impact rated; Kynar 500-match
terratone. Please refer to Door Schedule for
additional information
Swing
f Ref OP-01 or sim.: 3' x 8' 1 NR 0.00 0.00
g Ref OP-10 or sim.: 3' x 8' 1 NR 0.00 0.00
Slider
h Ref OP-05, 07 or sim.: 8' x 8' 2 NR 0.00 0.00
i Ref OP-06, 18, 20 or sim.: 6' x 8' 3 NR 0.00 0.00
j Ref OP-19 or sim.: 12' x 8' 1 NR 0.00 0.00
Edge treatments

Allow for all timber blocking and edge treatments as


required for complete installation of windows and
k doors ITEM 0.00 0.00
l Bamboo wall inserts to louvers ITEM 0.00 0.00

Page 29
To Summary CI$ 0.00

Page 30
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C INTERNAL WALLS AND PARTITIONS

Qty Unit Rate CI$ c

INTERNAL WALLS AND PARTITIONS


Metal framed systems to walls
Drylining and partitioning systems to walls

Metal framed system to form walls. Note: Allow


here for framing only, wall boarding measured
separately
Type 2 - 3-5/8" metal stud at 16 o.c. framing
a system as partition walls 176 SF 0.00 0.00
Type 3 - 3-5/8" metal stud at 16 o.c. framing
b system as partition walls 1013 SF 0.00 0.00
Type 4 - 6" metal stud at 16 o.c. framing system
c as partition walls 105 SF 0.00 0.00
Type 7 - 3-5/8" metal stud at 16 o.c. framing
d system as partition walls 195 SF 0.00 0.00
Insulation
e Batt insulation between studs 1313 SF 0.00 0.00

Linings to walls in 5/8" plasterboard all joints taped


and plastered and fixed to metal stud framing.
Note: Allow here for wall boarding only, framing
measured separately
f Vertically to faces of partition walls 2064 SF 0.00 0.00
g Water resistant board to shower stalls 352 SF 0.00 0.00

Linings to walls in 1/2" plasterboard all joints taped


and plastered and fixed to metal stud framing.
Note: Allow here for wall boarding only, framing
measured separately
h Vertically to faces of partition walls 562 SF 0.00 0.00
Extra over framing and plasterboard lining for
forming openings in stud partition walls
i Opening size: 20 - 30 sq.ft. 8 NR 0.00 0.00
j Opening size: 30 - 35 sq.ft. 2 NR 0.00 0.00
Extra over for plywood backing boards as required
k Behind wall mounted joinery, fixtures and fittings ITEM 0.00 0.00
Blockwork

Concrete masonry units, laid and jointed in mortar all


pockets filled with 3000 PSI concrete, built around
vertical and horizontal reinforcement (measured
separately)
l 8" thick blockwalls 450 SF 0.00 0.00

Page 31
To Collection CI$ 0.00

Page 32
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C INTERNAL WALLS AND PARTITIONS

Qty Unit Rate CI$ c

INTERNAL WALLS AND PARTITIONS continued ...


Blockwork continued ...
Mild steel bars ASTM A-615 Grade 60 reinforcement
in accordance with Engineer's details
a #4 bars vertically in block walls, bent 374 LBS 0.00 0.00
b #4 bars horizontally in block walls 128 LBS 0.00 0.00
Railings fixed to concrete surfaces including final
paint finishes type as specified
c 36" high guardrail, sloping stairs 17 LF 0.00 0.00
d 36" high guardrail, landings 5 LF 0.00 0.00
Wall mounted handrail; grab bar end to return to wall
including final finishes and all fixing materials
e Handrails fixed to blockwalls 22 LF 0.00 0.00

Page 33
To Collection CI$ 0.00

Page 34
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C INTERNAL WALLS AND PARTITIONS

Qty Unit Rate CI$ c

Collection

Total from Page 16 CI$ 0.00

Total from Page 17 CI$ 0.00

Page 35
To Summary CI$ 0.00

Page 36
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C INTERNAL DOORS

Qty Unit Rate CI$ c

INTERNAL DOORS
Doors, frames and hardware

Door sets in wood. Note: Price to including for jambs,


stops, all hardware, locking devices and final surface
finishes. Please refer to Door Schedule for additional
information
Swing
a Ref D1: 2'-8" x 8' 1 NR 0.00 0.00
b Ref D2: 2'-8" x 8' 1 NR 0.00 0.00
c Ref D3: 2'-10" x 8', slider 1 NR 0.00 0.00
d Ref D4: 4' x 8', pair slider 1 NR 0.00 0.00
e Ref D5: 2'-8" x 8' 1 NR 0.00 0.00
f Ref D6: 2'-8" x 8' 1 NR 0.00 0.00
g Ref D7: 2'-10" x 8', pair 1 NR 0.00 0.00
h Ref D8: 2'-8" x 8' 1 NR 0.00 0.00
i Ref D9: 2'-10" x 8', slider 1 NR 0.00 0.00
j Ref D10: 4' x 8', pair slider 1 NR 0.00 0.00
Edge treatments
Allow for all timber blocking and edge treatments
k as required for complete installation of doors ITEM 0.00 0.00

Page 37
To Summary CI$ 0.00

Page 38
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C WALL FINISHES

Qty Unit Rate CI$ c

WALL FINISHES
Internal Wall Finishes
Prepare surfaces with bonding agent where required
and apply 1/2" thick cement sand render in 1:3 mix
a Masonry walls and concrete surfaces 3189 SF 0.00 0.00
Masonry walls and concrete surfaces width not
b exceeding 12" 407 LF 0.00 0.00
Waterproofing
Allow for all waterproofing required to reveals of
c external window and door openings 407 LF 0.00 0.00
Painting and Decorating

Prepare surfaces and apply prime coat and (3)


coats emulsion paint as per manufacturer's
recommendations. Colour and type as per Client's
recommendations
d Plasterboard surfaces 2111 SF 0.00 0.00
e Rendered surfaces 2708 SF 0.00 0.00
f Rendered surfaces, width not exceeding 12" 407 LF 0.00 0.00
Wall Tiling

Ceramic tiles, fixed to rendered or cement board


surfaces with approved adhesive, all joints filled with
matching grout. Note: Tiling measured to walls
surrounding shower stalls and kitchen backsplash
only

Shower stalls an bathtubs. Allow the PC Sum of


CI$6.00 per square foot for supply of tiles.
Contractor to allow for labour, adhesive and grout
g including all labours, cutting, edge trims etc. 323 SF 0.00 0.00

Kitchen backsplash. Allow the PC Sum of


CI$5.00 per square foot for supply of tiles.
Contractor to allow for labour, adhesive and grout
h including all labours, cutting, edge trims etc. 29 SF 0.00 0.00
External Wall Finishes
In situ finishes
Prepare surfaces with bonding agent where required
and apply 1/2" thick cement sand render in 1:3 mix
i External masonry walls and concrete surfaces 4534 SF 0.00 0.00
EIFS finish coat on 1/2" base coat, on fibre mesh,
on 2 1/2" rigid foam insulation
j External masonry walls and concrete surfaces 1716 SF 0.00 0.00

Page 39
To Collection CI$ 0.00

Page 40
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C WALL FINISHES

Qty Unit Rate CI$ c

WALL FINISHES continued ...


External Wall Finishes continued ...
In situ finishes continued ...
EIFS finish coat on 1/2" base coat, on fibre mesh,
on 2 1/2" rigid foam insulation continued ...
a Column base thickenings 153 SF 0.00 0.00
b 12" wide bands 157 LF 0.00 0.00
c 16" wide bands 159 LF 0.00 0.00
Styrofoam behind shiplap siding
d External masonry walls and concrete surfaces 725 SF 0.00 0.00
Shiplap siding including waterproofing and
supporting timber
e External masonry walls and concrete surfaces 725 SF 0.00 0.00
Painting and Decorating

Prepare rendered surfaces and apply base coat and


PAREX or equal approved external coating all as
per manufacturers recommendations. Type and
colour as specified
f External masonry walls and concrete surfaces 1572 SF 0.00 0.00
g Shiplap siding 725 SF 0.00 0.00
Stone facing
h External masonry walls and concrete surfaces 591 SF 0.00 0.00
Stone capping
i Cayman stone capping 103 LF 0.00 0.00

Page 41
To Collection CI$ 0.00

Page 42
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C WALL FINISHES

Qty Unit Rate CI$ c

Collection

Total from Page 20 CI$ 0.00

Total from Page 21 CI$ 0.00

Page 43
To Summary CI$ 0.00

Page 44
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C FLOOR FINISHES

Qty Unit Rate CI$ c

FLOOR FINISHES
Screeds
Screeds, beds and toppings, not exceeding 3" thick
laid to falls and crossfalls as required
a Below tiled floors 1889 SF 0.00 0.00
Tiled finishes
Ceramic floor tiles laid and jointed in approved thinset
mortar, all joints filled with matching grout

Interior grade. Allow the PC Sum of CI$7.00 per


square foot for supply of tiles. Contractor to allow
for labour, adhesive and grout including all labours,
b cutting, edge trims etc. 1445 SF 0.00 0.00

Interior grade non-skid tiles to stairs treads and


risers. Allow the PC Sum of CI$5.00 per square foot
for supply of tiles. Contractor to allow for labour,
adhesive and grout including all labours, cutting,
c edge trims etc. 130 LF 0.00 0.00

Exterior grade non-skid tiles. Allow the PC Sum of


CI$5.00 per square foot for supply of tiles.
Contractor to allow for labour, adhesive and grout
d including all labours, cutting, edge trims etc. 444 SF 0.00 0.00

Courtyard pavers. Allow the PC Sum of CI$5.00 per


square foot for supply of tiles. Contractor to allow
for labour, adhesive and grout including all labours,
e cutting, edge trims etc. 530 SF 0.00 0.00
Skirtings fixed to wall surfaces

Softwood 4" x 5/8" nominal size. Allow the PC Sum


of CI$5.00 per linear foot for supply of timber
skirtings. Contractor to allow for all fixing materials
f and jointing as required. 524 LF 0.00 0.00
Painting and Decorating

Prepare surfaces and apply paint finish as per


manufacturer's recommendations. Colour and type as
per Client's recommendations
g 4" softwood skirtings 524 LF 0.00 0.00

Page 45
To Summary CI$ 0.00

Page 46
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C CEILING FINISHES

Qty Unit Rate CI$ c

CEILING FINISHES
In-situ finishes
Solid suspended ceilings
Metal stud ceiling framing complete with 1/2" taped,
sealed and finished regular plasterboard
Suspended from concrete soffit of stairs, average
a framing depth not exceeding 3'-0" 57 SF 0.00 0.00
Suspended from concrete upper floors, average
b framing depth not exceeding 3'-0" 718 SF 0.00 0.00
Suspended from timber roof trusses, average
c framing depth not exceeding 3'-0" 263 SF 0.00 0.00

Suspended from timber roof trusses, average


framing depth not exceeding 3'-0", including special
d architectural finish 360 SF 0.00 0.00
Metal stud ceiling framing complete with 1/2" taped,
sealed and finished moisture resistant board
Suspended from concrete upper floors, average
e framing depth not exceeding 3'-0" 177 SF 0.00 0.00
Metal stud ceiling framing complete with 1/2" taped,
sealed and finished fibre cement board
Suspended from timber roof trusses, average
f framing depth not exceeding 3'-0" 438 SF 0.00 0.00
Painting and Decorating

Prepare surfaces and apply prime coat and (3) coats


emulsion paint as per manufacturer's
recommendations. Colour and type as per Client's
recommendations
g Plasterboard surfaces 1444 SF 0.00 0.00
h Moisture resistant board surfaces 177 SF 0.00 0.00
i Fibre cement board surfaces 438 SF 0.00 0.00

Page 47
To Summary CI$ 0.00

Page 48
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C FITTINGS FURNISHINGS AND EQUIPMENT

Qty Unit Rate CI$ c

FITTINGS FURNISHINGS AND EQUIPMENT

Supply and install the following in accordance


with manufacturer's recommendations and
Architects drawings. Type as per Client's
recommendations
Furnishings
Allow Provisional Sums for kitchen cabinets, island
and countertops complete
a Apartment Provisional sum of CI$10,000.00 (1NR) SUM 0.00 0.00
Allow a Provisional Sums for and bathroom vanity
units complete
b Apartment Provisional sum of CI$900.00 (1NR) SUM 0.00 0.00
Fittings

Allow Provisional Sums for the supply and


installation of mirrors, toilet roll holders, towel rails,
closet shelving
c Apartment Provisional sum of CI$400.00 (1NR) SUM 0.00 0.00
Other
d Wall bench in treated IPE or sim. approved 1 NR 0.00 0.00
Appliances including supply, delivery and
installation
e Fridge/freezers - Prime Cost sum of CI$1,500.00 1 NR 0.00 0.00
f Ranges - Prime Cost CI$600.00 1 NR 0.00 0.00
g Washing machines - Prime Cost CI$800.00 1 NR 0.00 0.00
h Tumble dryers - Prime Cost CI$850.00 1 NR 0.00 0.00
i Dishwashers - Prime Cost CI$400.00 1 NR 0.00 0.00
j Microwave ovens - Prime Cost CI$350.00 1 NR 0.00 0.00

Page 49
To Summary CI$ 0.00

Page 50
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C SANITARY INSTALLATIONS

Qty Unit Rate CI$ c

SANITARY INSTALLATIONS
Sanitary appliances

Allow for the supply and installation of the following


sanitary appliances including all connections to
supply and waste outlets. Contractor to allow for all
accessories related to fixture installation including but
not exclusive to, waxes flex tubes, valves etc.for a
complete installation
Toilets complete with seats and cisterns. Allow the
a PC Sum of CI$250.00 for supply of fitting 3 NR 0.00 0.00
Bathroom vanity basin. Allow the PC Sum of
b CI$150.00 for supply of fitting 3 NR 0.00 0.00
Bathroom vanity basin faucet. Allow the PC Sum of
c CI$85.00 for supply of fitting 3 NR 0.00 0.00
Kitchen sink. Allow the PC Sum of CI$350.00 for
d supply of fitting 1 NR 0.00 0.00
Kitchen sink faucet. Allow the PC Sum of
e CI$175.00 for supply of fitting 1 NR 0.00 0.00
Standing showers. Allow the PC Sum of CI$700.00
f for supply of fitting 2 NR 0.00 0.00
Shower enclosures. Allow the PC Sum of
g CI$500.00 for supply of fitting 2 NR 0.00 0.00
Shower faucets. Allow the PC Sum of CI$180.00 for
h supply of fitting 2 NR 0.00 0.00
Bath tubs. Allow the PC Sum of CI$300.00 for
i supply of fitting 1 NR 0.00 0.00
Bath and shower faucets. Allow the PC Sum of
j CI$180.00 for supply of fitting 1 NR 0.00 0.00
Outdoor showers. Allow the PC Sum of CI$700.00
k for supply of fitting 1 NR 0.00 0.00
Outdoor shower faucets. Allow the PC Sum of
l CI$180.00 for supply of fitting 1 NR 0.00 0.00

Page 51
To Summary CI$ 0.00

Page 52
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C PLUMBING INSTALLATION

Qty Unit Rate CI$ c

PLUMBING INSTALLATION

Not withstanding the principles of the 'New Rules


of Measurement NRM 2' the contractor is required
to price the entire service installation. A detailed
breakdown of the entire bid will be be required
should the contractor be successful
Mains water

Mains water supply to new buildings including


connections, valves, meters, etc.; allow for all
trenching and builders work in connection with this
item
a Generally ITEM 0.00 0.00
Cold water service installation including meters,
sub-meters and connections to water main complete
b Generally ITEM 0.00 0.00
Hot water service installation including all piping and
valves
c Generally ITEM 0.00 0.00
d Instant wall mounted hot water heaters ITEM 0.00 0.00
Waste water

Sanitary, ventilation and rainwater drainage


installation systems complete including all wastes,
overflows, drain wells, fittings, etc. and connections
to existing drainage systems as necessary including
deep wells and associated ground work
e Generally ITEM 0.00 0.00
AC drains

A/C condensate drainage system installation;


complete including connection to the air conditioning
and drainage systems
f Generally ITEM 0.00 0.00
Connections to all plumbing and sanitary fittings and
equipment (fittings measured elsewhere)
g Generally ITEM 0.00 0.00

Page 53
To Collection CI$ 0.00

Page 54
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C PLUMBING INSTALLATION

Qty Unit Rate CI$ c

PLUMBING INSTALLATION continued ...


Sundries

Sundries including support brackets, fixing anchors,


insulating blocks and anti vibration devices;
identification including disks, labels, plates, charts
and colour coding; tools and spares; documents
including drawings, operating instructions and manual
a Generally ITEM 0.00 0.00
Testing and Commissioning
Allow for testing and commissioning of the whole of
b the works in this section ITEM 0.00 0.00
Builders work

Allow for forming all holes, chases, mortices, etc. for


the whole of the Plumbing, Drainage and any other
installations through or in concrete floors/roofs and
concrete/stud walls etc. and for making good the
c structure and finishes ITEM 0.00 0.00

Allow for necessary trenching, excavation, sand


beds, backfilling, disposal of surplus material, etc.
including soil poisoning to excavations under the
d building and work outside the boundary of the site ITEM 0.00 0.00
Allow for any other builder's work not specifically
e mentioned above ITEM 0.00 0.00

Page 55
To Collection CI$ 0.00

Page 56
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C PLUMBING INSTALLATION

Qty Unit Rate CI$ c

Collection

Total from Page 27 CI$ 0.00

Total from Page 28 CI$ 0.00

Page 57
To Summary CI$ 0.00

Page 58
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ELECTRICAL INSTALLATION

Qty Unit Rate CI$ c

ELECTRICAL INSTALLATION

Not withstanding the principles of the 'New Rules


of Measurement NRM 2' the contractor is required
to price the entire service installation. A detailed
breakdown of the entire bid will be be required
should the contractor be successful
Solar Power
Provision for solar power including batteries and
a photvoltaic panels ITEM 0.00 0.00
Mains supply
b Including all necessary trenching and backfilling ITEM 0.00 0.00
Sub-mains
c Generally ITEM 0.00 0.00
Final sub-circuits and auxiliary installations
d Lighting ITEM 0.00 0.00
e Power Installations ITEM 0.00 0.00
f Telephone and data installation ITEM 0.00 0.00
Control gear
Including switchgear, distribution gear, contactors,
g starters, switchboards etc. ITEM 0.00 0.00
Accessories
Ceiling fans. Allow the PC Sum of CI$220.00 for
h supply of fixture 4 NR 0.00 0.00
Type A - recessed pot LED. Allow the PC Sum of
i CI$25.00 for supply of fixture 49 NR 0.00 0.00
Type A1 - recessed pot LED damp wet area. Allow
j the PC Sum of CI$30.00 for supply of fixture 7 NR 0.00 0.00
Type B - wall mounted light fixture (indoor). Allow the
k PC Sum of CI$50.00 for supply of fixture 8 NR 0.00 0.00
Type B1 - wall mounted light fixture (outdoor). Allow
l the PC Sum of CI$60.00 for supply of fixture 4 NR 0.00 0.00
Type E - Owner specified hanging light fixture. Allow
m the PC Sum of CI$300.00 for supply of fixture 2 NR 0.00 0.00
Directional wall lights Allow the PC Sum of CI$70.00
n for supply of fixture 1 NR 0.00 0.00
Fire and smoke protection
o Generally ITEM 0.00 0.00

Page 59
To Collection CI$ 0.00

Page 60
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ELECTRICAL INSTALLATION

Qty Unit Rate CI$ c

ELECTRICAL INSTALLATION continued ...


Lightning conductor installations
a Generally ITEM 0.00 0.00
Testing and Commissioning
Allow for testing the whole of the works in this section
Sundries

Including supports, brackets, fixings, anchors,


insulation blocks, identification disks, label plates,
charts and colour coding, tools and spares,
documents including drawings, operating instructions
b and maintenance manuals ITEM 0.00 0.00
Builders work

Allow for forming openings, holes, chases, mortices,


etc. for pipes, ductwork and the like for the whole of
the installation through or in concrete floors/roofs and
block/stud wall/ceilings; including provision of all
necessary timber blocking pieces and making good
c the structure and all finishes ITEM 0.00 0.00

Page 61
To Collection CI$ 0.00

Page 62
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ELECTRICAL INSTALLATION

Qty Unit Rate CI$ c

Collection

Total from Page 30 CI$ 0.00

Total from Page 31 CI$ 0.00

Page 63
To Summary CI$ 0.00

Page 64
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C AIR CONDITIONING INSTALLATION

Qty Unit Rate CI$ c

AIR CONDITIONING INSTALLATION

Not withstanding the principles of the 'New Rules


of Measurement NRM 2' the contractor is required
to price the entire service installation. A detailed
breakdown of the entire bid will be be required
should the contractor be successful
Ducting
a Generally, where not measured elsewhere. ITEM 0.00 0.00
Mini split A/C
b Generally ITEM 0.00 0.00
Condensers
c Generally ITEM 0.00 0.00
Exhaust fans
d Exhaust fan-light combo - 100 va. ITEM 0.00 0.00
Testing and Commissioning

Allow for commissioning, balancing and testing as


required; including the provision of a 'Test and
e Balancing' report ITEM 0.00 0.00
Sundries
f Co-ordination with other engineering installations ITEM 0.00 0.00
Cutting forming holes, mortices, chases etc; making
g good structure and finishes disturbed ITEM 0.00 0.00
Building in and pinning brackets or the like; making
good structure and finishes disturbed

Protective and decorative painting the installation


where applicable including masking and cleaning
h upon completion ITEM 0.00 0.00
Builders work

Allow for forming openings, holes, chases, mortices,


etc. for pipes, ductwork and the like for the whole of
the Air Conditioning and Ventilation Installation
through or in concrete floors/roofs and block/stud
wall/ceilings; including provision of all necessary
timber blocking pieces and making good the structure
i and all finishes ITEM 0.00 0.00
Testing and commissioning

Allow for commissioning, balancing and testing as


required; including the provision of a 'Test and
j Balancing' report ITEM 0.00 0.00

Page 65
To Summary CI$ 0.00

Page 66
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C

Qty Unit Rate CI$ c

Summary

SITE CLEARANCE/PREPARATION Page 1 CI$ 0.00

SUBSTRUCTURE Page 5 CI$ 0.00

FRAME Page 8 CI$ 0.00

UPPER FLOORS Page 9 CI$ 0.00

STAIRS AND LANDINGS Page 10 CI$ 0.00

ROOFING Page 13 CI$ 0.00

EXTERNAL WALLS Page 14 CI$ 0.00

WINDOWS AND EXTERNAL DOORS Page 15 CI$ 0.00

INTERNAL WALLS AND PARTITIONS Page 18 CI$ 0.00

INTERNAL DOORS Page 19 CI$ 0.00

WALL FINISHES Page 22 CI$ 0.00

FLOOR FINISHES Page 23 CI$ 0.00

CEILING FINISHES Page 24 CI$ 0.00

FITTINGS FURNISHINGS AND EQUIPMENT Page 25 CI$ 0.00

SANITARY INSTALLATIONS Page 26 CI$ 0.00

PLUMBING INSTALLATION Page 29 CI$ 0.00

ELECTRICAL INSTALLATION Page 32 CI$ 0.00

AIR CONDITIONING INSTALLATION Page 33 CI$ 0.00

Page 67
Total for Bill CI$ 0.00