SITE CLEARANCE/PREPARATION
Preliminary site work
Page 1
To Summary CI$ 0.00
Page 2
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C SUBSTRUCTURE
SUBSTRUCTURE
Excavation and Earthwork - All Quantities in this
Section are Provisional
Page 3
To Collection CI$ 0.00
Page 4
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C SUBSTRUCTURE
Page 5
To Collection CI$ 0.00
Page 6
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C SUBSTRUCTURE
Page 7
To Collection CI$ 0.00
Page 8
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C SUBSTRUCTURE
Collection
Page 9
To Summary CI$ 0.00
Page 10
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C FRAME
FRAME
Concrete Works
Page 11
To Collection CI$ 0.00
Page 12
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C FRAME
Page 13
To Collection CI$ 0.00
Page 14
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C FRAME
Collection
Page 15
To Summary CI$ 0.00
Page 16
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C UPPER FLOORS
UPPER FLOORS
Concrete Works
Page 17
To Summary CI$ 0.00
Page 18
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C STAIRS AND LANDINGS
Page 19
To Summary CI$ 0.00
Page 20
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ROOFING
ROOFING
Pitched Roof
Page 21
To Collection CI$ 0.00
Page 22
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ROOFING
Page 23
To Collection CI$ 0.00
Page 24
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ROOFING
Collection
Page 25
To Summary CI$ 0.00
Page 26
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C EXTERNAL WALLS
EXTERNAL WALLS
Blockwork
Page 27
To Summary CI$ 0.00
Page 28
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C WINDOWS AND EXTERNAL DOORS
Page 29
To Summary CI$ 0.00
Page 30
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C INTERNAL WALLS AND PARTITIONS
Page 31
To Collection CI$ 0.00
Page 32
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C INTERNAL WALLS AND PARTITIONS
Page 33
To Collection CI$ 0.00
Page 34
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C INTERNAL WALLS AND PARTITIONS
Collection
Page 35
To Summary CI$ 0.00
Page 36
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C INTERNAL DOORS
INTERNAL DOORS
Doors, frames and hardware
Page 37
To Summary CI$ 0.00
Page 38
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C WALL FINISHES
WALL FINISHES
Internal Wall Finishes
Prepare surfaces with bonding agent where required
and apply 1/2" thick cement sand render in 1:3 mix
a Masonry walls and concrete surfaces 3189 SF 0.00 0.00
Masonry walls and concrete surfaces width not
b exceeding 12" 407 LF 0.00 0.00
Waterproofing
Allow for all waterproofing required to reveals of
c external window and door openings 407 LF 0.00 0.00
Painting and Decorating
Page 39
To Collection CI$ 0.00
Page 40
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C WALL FINISHES
Page 41
To Collection CI$ 0.00
Page 42
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C WALL FINISHES
Collection
Page 43
To Summary CI$ 0.00
Page 44
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C FLOOR FINISHES
FLOOR FINISHES
Screeds
Screeds, beds and toppings, not exceeding 3" thick
laid to falls and crossfalls as required
a Below tiled floors 1889 SF 0.00 0.00
Tiled finishes
Ceramic floor tiles laid and jointed in approved thinset
mortar, all joints filled with matching grout
Page 45
To Summary CI$ 0.00
Page 46
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C CEILING FINISHES
CEILING FINISHES
In-situ finishes
Solid suspended ceilings
Metal stud ceiling framing complete with 1/2" taped,
sealed and finished regular plasterboard
Suspended from concrete soffit of stairs, average
a framing depth not exceeding 3'-0" 57 SF 0.00 0.00
Suspended from concrete upper floors, average
b framing depth not exceeding 3'-0" 718 SF 0.00 0.00
Suspended from timber roof trusses, average
c framing depth not exceeding 3'-0" 263 SF 0.00 0.00
Page 47
To Summary CI$ 0.00
Page 48
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C FITTINGS FURNISHINGS AND EQUIPMENT
Page 49
To Summary CI$ 0.00
Page 50
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C SANITARY INSTALLATIONS
SANITARY INSTALLATIONS
Sanitary appliances
Page 51
To Summary CI$ 0.00
Page 52
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C PLUMBING INSTALLATION
PLUMBING INSTALLATION
Page 53
To Collection CI$ 0.00
Page 54
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C PLUMBING INSTALLATION
Page 55
To Collection CI$ 0.00
Page 56
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C PLUMBING INSTALLATION
Collection
Page 57
To Summary CI$ 0.00
Page 58
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ELECTRICAL INSTALLATION
ELECTRICAL INSTALLATION
Page 59
To Collection CI$ 0.00
Page 60
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ELECTRICAL INSTALLATION
Page 61
To Collection CI$ 0.00
Page 62
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C ELECTRICAL INSTALLATION
Collection
Page 63
To Summary CI$ 0.00
Page 64
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C AIR CONDITIONING INSTALLATION
Page 65
To Summary CI$ 0.00
Page 66
DREAM BIG HOLDINGS DIVE RESORT - BUILDING C
Summary
Page 67
Total for Bill CI$ 0.00
Page 68