Professional Documents
Culture Documents
• What more?
• Large interconnected systems
• Multiple loads, multiple generators
• Why do we need large interconnected systems?
• Reliability, economics
• Analysis of the large systems
• Flow of power and currents, control and stability of the systems
• Proper handling of fault conditions, economic operation
Single fed radial network Dual fed radial network Dual fed radial network
Dual supply, double busbar radial network Open ring network Closed ring network
GEE‐PSAOpt Intr. Power Systems 17
GEE‐PSAOpt Intr. Power Systems 18
MV Distribution System
Restoration
4
Outage area
2 3 5
1 T1
6 7 8 9
T2
10 11 12 13
1
Fault T1 T1 is closed
6 7 8 9
Line
Tie line T2
10 11 12 13
MV/LV Transformer
HV/MV 14
HV/MV Substation
NC
HV/MV
NO
NO
HV/MV
NC