Professional Documents
Culture Documents
R/o: R-16 & 17 , Mahalaxmi Residency, Baran Road, Kota – 324001 (Rajasthan)
To,
The Project Director
National Highway Authority of India
Project Implementation Unit, SWM.
(Rajasthan)
Dear Sir,
As per the above cited subject that, Quarterly Maintenance payment
Statement No. – 12, the withheld amount of Rs 1,000,000 /- (Rupee Ten Lac only) has
been asked to be released. Out of which the maintenance work was not done on time by
the contractor under Schedule-E so deduction of Rs 31707 /- (Rupees Thirty one
thousand seven hundred seven only) is made under Schedule – M of EPC Agreement.
Therefore, you are requested to recommending the release of Rs 968293 /- (Rupee
Nine lac sixty eight thousand two hundred ninety three) from the withheld amount.
Head Office: T-10, 3rd Floor, City Centre, Press Complex, Plot No.1, M. P. Nagar, Zone-I, Bhopal (M.P.) 462 011, Tel./Fax: 0755-4295421,
Mob.: +91 9977004686, 9926050707. e-mail: lnmalviya@rediffmail.com, website: www.lnminfra.com
Corporate Office:T-17 to 20, 3rd Floor, Malhan Falcon Plaza, Plot No.4, Pocket-7, Sector-12, Dwarka,New Delhi-110 075,
Ph.: 011-45090245, e-mail: delhilnm@gmail.com, website: www.lnminfra.com
L.N. MALVIYA INFRA PROJECTS PVT. LTD.
R/o: R-16 & 17 , Mahalaxmi Residency, Baran Road, Kota – 324001 (Rajasthan)
Head Office: T-10, 3rd Floor, City Centre, Press Complex, Plot No.1, M. P. Nagar, Zone-I, Bhopal (M.P.) 462 011, Tel./Fax: 0755-4295421,
Mob.: +91 9977004686, 9926050707. e-mail: lnmalviya@rediffmail.com, website: www.lnminfra.com
Corporate Office:T-17 to 20, 3rd Floor, Malhan Falcon Plaza, Plot No.4, Pocket-7, Sector-12, Dwarka,New Delhi-110 075,
Ph.: 011-45090245, e-mail: delhilnm@gmail.com, website: www.lnminfra.com
L.N. MALVIYA INFRA PROJECTS PVT. LTD.
R/o: R-16 & 17 , Mahalaxmi Residency, Baran Road, Kota – 324001 (Rajasthan)
7. At places debris disposal by We do not do any negligence in At places debris E (i) Per Km. 2439 *
local is observed, which is the removal of debris; whatever disposal dumped 1 = 2439
neglected from contractor debris is on the road is removed by local. Debris
side immediately. What you have and disposal timely
observed is that the construction had not removed at
of a petrol pump is going on and 1 places of entire
the soil has been dumped outside section by
the earthen shoulder. contractor.
8. There is four lane road in The four lane section is a pander There is a four lane C (iii) Per Km. 2439
village Pander. The median in which there is no guardrail road in village x 1 = 2439
railing is seen damaged, kerb where there is an opening and Pander. The
raising is necessary, Painting whatever damage is there has median railing
to kerb is also not attended, been repaired. The Curve has timely had not
also in this length water been made according to the rectified by
stagnation is observed on design and drawing, the contractor in 1 Km
shoulder at places. visibility of its painting is still of entire section.
good. If the visibility is low
during the monsoon, then after
the rains, the work will be done
under the observation of the
authority engineer.
9. At Dhabha locations water is Unauthorized access to the entire At Dhaba locations D (i) Per Km. 2439 *
flowing toward the road section has been done by the water is flowing 2 = 4878
causing muddy road surface, hotel and dhaba, whose has been stopped
which may cause accident information has been given by towards the road
particularly to 2 – wheelers the cross foot contract to the causing. The water
due to slippage of vehicle. authority engineer and all new flowing and muddy
Head Office: T-10, 3rd Floor, City Centre, Press Complex, Plot No.1, M. P. Nagar, Zone-I, Bhopal (M.P.) 462 011, Tel./Fax: 0755-4295421,
Mob.: +91 9977004686, 9926050707. e-mail: lnmalviya@rediffmail.com, website: www.lnminfra.com
Corporate Office:T-17 to 20, 3rd Floor, Malhan Falcon Plaza, Plot No.4, Pocket-7, Sector-12, Dwarka,New Delhi-110 075,
Ph.: 011-45090245, e-mail: delhilnm@gmail.com, website: www.lnminfra.com
L.N. MALVIYA INFRA PROJECTS PVT. LTD.
R/o: R-16 & 17 , Mahalaxmi Residency, Baran Road, Kota – 324001 (Rajasthan)
For which no care from encroachments are also informed towards the road
contractor side taken at all. about them. surface timely had
not cleaned 2 Km
of entire section by
contractor.
10. No control over new At present new encroachment The raising new
encroachments is observed, have been made, whatever encroachment on
to resist it. encroachments have been made site has been
are old, the authority engineer stopped by O&M
has been informed about them. contractor’s,
patrolling team
11. Housekeeping works like Running of overloaded sand Major bridge
cleaning of surface, removal vehicles is causing falling sand, 153.450
of vegetation on structures which is being done due to unauthorized
are attended (Bridge at maintenance. You have observed vegetation and
153/450). that cleaning and unwanted debris on surface
vegetation removal work has has been cleaned.
been done on the structure
ch153+400.
12. At ch. 133.000 the traffic i There is no unauthorized At chainage
land is seen encroached, encroachment at km 133+000; 133.000 the traffic
steps toward removal of such the total ROW here is 15 meter, i land encroached
encroachment needs to be where Taswariya village is has been removed.
taken. located.
13. The kilometer stones, 200 There is no missing km stone The missing and E (i) Per Km. 2439 *
meter stones, Boundary and boundary stone, 200 meter damaged km stone, 3 = 7317
stones are seen missing, stone whatever damage and hectometer stone
damaged. missing has been installed. and boundary stone
timely had not
Head Office: T-10, 3rd Floor, City Centre, Press Complex, Plot No.1, M. P. Nagar, Zone-I, Bhopal (M.P.) 462 011, Tel./Fax: 0755-4295421,
Mob.: +91 9977004686, 9926050707. e-mail: lnmalviya@rediffmail.com, website: www.lnminfra.com
Corporate Office:T-17 to 20, 3rd Floor, Malhan Falcon Plaza, Plot No.4, Pocket-7, Sector-12, Dwarka,New Delhi-110 075,
Ph.: 011-45090245, e-mail: delhilnm@gmail.com, website: www.lnminfra.com
L.N. MALVIYA INFRA PROJECTS PVT. LTD.
R/o: R-16 & 17 , Mahalaxmi Residency, Baran Road, Kota – 324001 (Rajasthan)
maintained in 3
Km of entire
section by
contractor.
14. The speed breakers are not to Speed breaker is banned on the The missing and
the standard guidelines and National Highway, whatever damaged km stone,
are without painting and breaker is made of it. Due to hectometer stone
informatory boards. more accidents, they and boundary stone
were made by the local has been rectified
administration. The signal and new installed
boards of speed breakers are on site.
fixed on both sides of all
breakers. The breakers were
painted. It has been informed for
the help of the administration to
remove it.
15. The road seen sinks at places. The road was constructed as per The riding quality
Action as per the contact the approved design and is checked NSV
clause needs to be taken to drawing. In the maintenance every six month, in
avoid further damages to period, under the guidance of the which the ride
road surface. authority engineer, this is being quality and rutting
maintained. The riding quality is are under the limit
checked every 6 months by NSV as per NSV Report.
which is within the permissible
limits
Total Reduction Amount 31707 Rs.
Head Office: T-10, 3rd Floor, City Centre, Press Complex, Plot No.1, M. P. Nagar, Zone-I, Bhopal (M.P.) 462 011, Tel./Fax: 0755-4295421,
Mob.: +91 9977004686, 9926050707. e-mail: lnmalviya@rediffmail.com, website: www.lnminfra.com
Corporate Office:T-17 to 20, 3rd Floor, Malhan Falcon Plaza, Plot No.4, Pocket-7, Sector-12, Dwarka,New Delhi-110 075,
Ph.: 011-45090245, e-mail: delhilnm@gmail.com, website: www.lnminfra.com
L.N. MALVIYA INFRA PROJECTS PVT. LTD.
R/o: R-16 & 17 , Mahalaxmi Residency, Baran Road, Kota – 324001 (Rajasthan)
Sushil Bhange
Highway Maintenance cum Resident Engineer.
Encl: - As above.
CC to: - 1. Authorised Signatory, L.N. Malviya Infra Project Pvt. Ltd, Bhopal (M.P.) 462011
2. M/S Dilip Buildcon Ltd. - Ranjit Buildcon Ltd. (JV
Head Office: T-10, 3rd Floor, City Centre, Press Complex, Plot No.1, M. P. Nagar, Zone-I, Bhopal (M.P.) 462 011, Tel./Fax: 0755-4295421,
Mob.: +91 9977004686, 9926050707. e-mail: lnmalviya@rediffmail.com, website: www.lnminfra.com
Corporate Office:T-17 to 20, 3rd Floor, Malhan Falcon Plaza, Plot No.4, Pocket-7, Sector-12, Dwarka,New Delhi-110 075,
Ph.: 011-45090245, e-mail: delhilnm@gmail.com, website: www.lnminfra.com