BILL 8.0 STRUCTURES:CULVERTS and Retaining Wall


Pay Item 81.02(a)(i) 81.02(a)(ii) 81.02(a)(iii) 81.05(b) 81.09(c) 82.01(a) 83.01(a) 83.01(b) 84.01(a)(ii) 84.01(a)(iii) 89.01(b)(i) 34.01(b)(ii)
Class B cement
Excavating
Excavating material mortared stone
material within the Backfill to Foundation fill Class 15/19
within the following Formworks to High yield stress Class 25/19 in masonry walls (1:3 Grouted stone pitching
following Extra in increment excavations Compacted granular Mild steel bars concrete in
Chainage successive depth provide all class of steel bars (Grade abutment & walls mortar ratio) for at culverts 200mm
Structure Type successive depth of 1 meter utilising Imported fill ( Selected (Grade 300) blinding/lean
(Km) ranges0m up to finishes 420) footing pads Construction of nominal thickness
ranges 2.0m up to material granular backfill) concrete
2.0m Retaining Walls,
4.0m
Check Dams
m3 m3 m3 m3 m3 m2 ton ton m3 m3 m3 m2
CULVERT STRUCTURES
Km6+600 Slab Culvert 127.01 16.83 - 32.74 - 37.20 0.70 - 22.50 - 23.11 -
Km9+292 Slab Culvert 288.43 87.43 - 128.47 - 26.57 0.35 - 11.24 - 108.73 51.63
Km10+593 Slab Culvert 216.03 85.62 - 189.00 - 53.77 0.69 - 30.53 - 105.89 40.90
Km10+692 Slab Culvert 448.76 384.23 - 745.28 - 132.48 1.47 - 75.02 - 371.85 201.25
Km12+717 Slab Culvert 386.94 351.62 - 376.52 - 101.36 0.80 2.07 73.91 - 267.71 14.24
Km12+980 Slab Culvert 320.93 297.06 - 189.28 - 57.94 0.90 - 33.77 - 108.19 33.37
Km26+245 Slab Culvert 174.11 4.15 - 77.16 - 104.08 0.67 1.22 35.04 - 50.25 7.49
Km26+672 Slab Culvert 321.34 22.96 - 122.37 - 99.73 2.13 - 63.50 - 68.09 -

Total Design Quantity 2,283.55 1,249.90 - 1,860.82 - 613.13 7.71 3.30 345.51 - 1,103.81 348.88
Total Paid Quantity 2,044.95 581.80 139.59 648.65 - 496.37 5.15 3.54 240.70 2.43 774.74 195.68
Difference Quantity 238.60 668.10 -139.59 1,212.17 - 116.76 2.56 -0.24 104.81 -2.43 329.07 153.20

Financial Progress
Unit rate 90 100 50 110.00 110.00 120.00 29,000.00 33,000.00 3,150.00 2,700.00 1,400.00 350.00
Amount 21,473.60 66,809.98 -6,979.50 133,338.68 - 14,011.18 74,318.08 -8,033.92 330,166.16 -6,561.00 460,704.86 53,619.09
Total Difference Amount 1,132,867.21

Prepared By (QS)
Signature:-
Date:- 31-Jul-23
EST.

Remark

-
-
ARBEREKETI - GELEMSO - MECHARA ROAD UPGRADING PROJECT
CONTRACT 1 :- ARBEREKETI - GELEMSO (57.5Km)
EMPLOYER
CONSULTANT CONTRACTOR
ERA Khatib&Alami Consulting Engineers(Offshore)S.A.L In JV with CORE Consulting Engineers Plc AL-ASAB GENERAL TRANSPORT & CONTRACTING EST.
Measurement Sheet

BILL 8.0 STRUCTURES:CULVERTS and Retaining Wall


Pay Item 81.02(a)(i) 81.02(a)(ii) 81.02(a)(iii) 81.05(b) 81.09(c) 82.01(a) 83.01(a) 83.01(b) 84.01(a)(ii) 84.01(a)(iii) 89.01(b)(i) 34.01(b)(ii)
Class B cement
Excavating Excavating
Foundation fill mortared stone
material within the material within the Backfill to Class 15/19 Grouted stone
Compacted Formworks to High yield stress Class 25/19 in masonry walls (1:3
following following Extra in increment excavations Mild steel bars concrete in pitching at culverts Remark
Chainage granular fill provide all class of steel bars (Grade abutment & walls mortar ratio) for
(Km) Structure Type successive depth successive depth of 1 meter utilising Imported (Grade 300) blinding/lean 200mm nominal
( Selected finishes 420) footing pads Construction of
ranges0m up to ranges 2.0m up to material concrete thickness
granular backfill) Retaining Walls,
2.0m 4.0m
Check Dams
m3 m3 m3 m3 m3 m2 ton ton m3 m3 m3 m2
CULVERT STRUCTURES
Km6+600 Slab Culvert 21.84 - - 21.84 - 38.23 0.70 - 18.79 - 18.91 -
Km9+292 Slab Culvert 212.59 75.99 - 36.12 - 9.51 0.18 - 9.48 2.43 88.60 66.05
Km10+593 Slab Culvert 195.98 72.78 - 180.00 - 58.78 - - 16.39 - 99.93 14.00
Km10+692 Slab Culvert 414.71 230.48 139.59 356.00 - 131.69 1.47 3.37 75.02 - 340.99 82.26
Km12+717 Slab Culvert 762.05 - - - - - - - 7.94 - -
Km12+980 Slab Culvert 281.43 199.54 - 54.69 - 50.42 - - 16.19 - 108.56 33.37
Km26+245 Slab Culvert 156.35 3.01 - - - 39.85 0.67 0.17 35.63 - 49.66 -
Km26+672 Slab Culvert - - - - 167.89 2.13 - 61.26 - 68.09 -

Total Paid Quantity 2,044.95 581.80 139.59 648.65 - 496.37 5.15 3.54 240.70 2.43 774.74 195.68

Prepared By (QS)
Signature:-
Date:- 31-Jul-23
ARBEREKETI - GELEMSO - MECHARA ROAD UPGRADING PROJECT
CONTRACT 1 :- ARBEREKETI - GELEMSO (57.5Km)
EMPLOYER
CONSULTANT CONTRACTOR
ERA Khatib&Alami Consulting Engineers(Offshore)S.A.L In JV with CORE Consulting Engineers Plc AL-ASAB GENERAL TRANSPORT & CONTRACTING EST.
Measurement Sheet

BILL 8.0 STRUCTURES:CULVERTS and Retaining Wall


Pay Item 81.02(a)(i) 81.02(a)(ii) 81.02(a)(iii) 81.05(b) 81.09(c) 82.01(a) 83.01(a) 83.01(b) 84.01(a)(ii) 84.01(a)(iii) 89.01(b)(i) 34.01(b)(ii)
Class B cement
Excavating Excavating
Foundation fill mortared stone
material within the material within the Backfill to Class 15/19 Grouted stone
Compacted Formworks to High yield stress Class 25/19 in masonry walls (1:3
following following Extra in increment excavations Mild steel bars concrete in pitching at culverts Remark
Chainage granular fill provide all class of steel bars (Grade abutment & walls mortar ratio) for
(Km) Structure Type successive depth successive depth of 1 meter utilising Imported (Grade 300) blinding/lean 200mm nominal
( Selected finishes 420) footing pads Construction of
ranges0m up to ranges 2.0m up to material concrete thickness
granular backfill) Retaining Walls,
2.0m 4.0m
Check Dams
m3 m3 m3 m3 m3 m2 ton ton m3 m3 m3 m2
CULVERT STRUCTURES
Km6+600 Slab Culvert 105.17 16.83 - 10.90 - -1.03 -0.00 - 3.71 - 4.20 -
Km9+292 Slab Culvert 75.84 11.44 - 92.35 - 17.06 0.17 - 1.76 -2.43 20.13 -14.42
Km10+593 Slab Culvert 20.05 12.84 - 9.00 - -5.01 0.69 - 14.14 - 5.96 26.90
Km10+692 Slab Culvert 34.05 153.75 -139.59 389.28 - 0.79 0.00 -3.37 -0.00 - 30.86 118.99
Km12+717 Slab Culvert -375.11 351.62 - 376.52 - 101.36 0.80 2.07 65.97 - 267.71 14.24
Km12+980 Slab Culvert 39.50 97.52 - 134.59 - 7.52 0.90 - 17.58 - -0.37 -
Km26+245 Slab Culvert 17.76 1.14 - 77.16 - 64.23 -0.00 1.05 -0.59 - 0.59 7.49
Km26+672 Slab Culvert 321.34 22.96 - 122.37 - -68.16 -0.00 - 2.24 - 0.00 -

Total Difference Quantity 238.60 668.10 -139.59 1,212.17 - 116.76 2.56 -0.24 104.81 -2.43 329.07 153.20

Prepared By (QS)
Signature:-
Date:- 31-Jul-23
ARBEREKETI - GELEMSO - MECHARA ROAD UPGRADING PROJECT
CONTRACT 1 :- ARBEREKETI - GELEMSO (57.5Km)
EMPLOYER
CONSULTANT CONTRACTOR
ERA Khatib&Alami Consulting Engineers(Offshore)S.A.L In JV with CORE Consulting Engineers Plc AL-ASAB GENERAL TRANSPORT & CONTRACTING EST.
Measurement Sheet

BILL 8.0 STRUCTURES:CULVERTS and Retaining Wall


Pay Item 81.02(a)(i) 81.02(a)(ii) 81.02(a)(iii) 81.05(b) 81.09(c) 82.01(a) 83.01(a) 83.01(b) 84.01(a)(ii) 84.01(a)(iii) 89.01(b)(i) 34.01(b)(ii)
Class B cement
Excavating Excavating
Foundation fill mortared stone
material within the material within the Backfill to Class 15/19 Grouted stone
Compacted Formworks to High yield stress Class 25/19 in masonry walls (1:3
following following Extra in increment excavations Mild steel bars concrete in pitching at culverts Remark
Chainage granular fill provide all class of steel bars (Grade abutment & walls mortar ratio) for Difference
(Km) Structure Type successive depth successive depth of 1 meter utilising Imported (Grade 300) blinding/lean 200mm nominal
( Selected finishes 420) footing pads Construction of
ranges0m up to ranges 2.0m up to material concrete thickness
granular backfill) Retaining Walls,
2.0m 4.0m
Check Dams
m3 m3 m3 m3 m3 m2 ton ton m3 m3 m3 m2
CULVERT STRUCTURES
Km6+600 Slab Culvert 9,465.12 1,682.76 - 1,198.56 - -123.60 -96.95 - 11,697.84 - 5,877.20 - 29,700.93
Km9+292 Slab Culvert 6,825.37 1,144.28 - 10,158.02 - 2,047.68 4,831.95 - 5,547.78 -6,561.00 28,176.82 -5,047.00 47,123.89
Km10+593 Slab Culvert 1,804.20 1,283.54 - 990.51 - -601.68 20,154.42 - 44,544.15 - 8,349.01 9,415.00 85,939.14
Km10+962 Slab Culvert 3,064.85 15,375.29 -6,979.50 42,820.69 - 94.32 84.59 -111,210.00 -1.45 - 43,200.38 41,645.59 28,094.77
Km12+717 Slab Culvert -33,759.93 35,162.36 - 41,417.56 - 12,163.44 23,313.13 68,429.39 207,818.10 - 374,791.35 4,984.00 734,319.41
Km12+980 Slab Culvert 3,554.60 9,751.63 - 14,804.96 - 902.64 26,232.21 - 55,361.25 - -518.29 0.00 110,089.01
Km26+245 Slab Culvert 1,598.42 113.96 - 8,487.20 - 7,707.84 -107.10 34,746.69 -1,852.20 - 822.36 2,621.50 54,138.67
Km26+672 Slab Culvert 28,920.97 2,296.15 - 13,461.19 - -8,179.46 -94.17 - 7,050.69 - 6.03 - 43,461.40

Total Difference Amount (ETB) 21,473.60 66,809.98 -6,979.50 133,338.68 - 14,011.18 74,318.08 -8,033.92 330,166.16 -6,561.00 460,704.86 53,619.09 1,132,867.21

Prepared By (QS)
Signature:-
Date:- 31-Jul-23