Professional Documents
Culture Documents
BRACING
5 a) Braces are tightened and secures /
TIE
6 Ties are placed in position as per drawing /
DEBRIS NET
7 a) Debris net to be erected to prevent articles and debris dislodged /
from the scaffold , falling on to the public access
HOUSE KEEPING
10 a) Working platform, access ways and landing cleared off any /
obstructions, loose objects and tripping hazard
b) Scaffold free from debris unused formwork, scaffold components, /
ets.
CHECK LIST FOR FALSEWORK (C60)
Proffesional Engineer
Ir Cheng Ming Kai
Date :22/03/2024
- Add box-tie at every RC column to
external scaffold