CHECK LIST FOR FALSEWORK (C60)

Contractor : KAM CHIUN CONSTRUCTION SDN BHD Date : 22/3/2024


Scaffold Inspector : MECCILECT SDN BHD - Steve Time : 9.30 AM
Scaffold Designer : ERA SCAFFOLD SYSTEM SDN BHD
Site Address : DEXCOM Batu Kawan
Location Of Scaffold : Zone 5 & Link Bridge Scaffold Type : C60 Shoring System

No Description C NC N/A REMARK


FOUNDATION
1 a) Scaffold ereted on firm ground /
b) Scaffold not endangered by open excavation /

SOLE PLATES & BASE PLATES


2 a) Proper sole plates used / on concrete slab
b) Base plates are fitted to all standards /

ALLIGNMENT OF SCAFFOLD CONNECTION


3 a) standards or Frames Vertical /
B) Ledgers and transom leveled /

FALSEWORK COMPONENT CONNECTION


4 a) Primary & Secondary joist sizes and spacing as per drawing /
b) Connection joist to Scaffold are tightened and secures /
c) Connection of plywood to secondary joist /

BRACING
5 a) Braces are tightened and secures /

TIE
6 Ties are placed in position as per drawing /

DEBRIS NET
7 a) Debris net to be erected to prevent articles and debris dislodged /
from the scaffold , falling on to the public access

RESHORING / BACK PROP


8 a) Reshoring / Back prop is erected as per drawing /

PROFESSIONAL ENGINEER'S ( P.E ) DRAWING


9 a) Scaffold are erecterd strictly in accordance with P.E drawing /

HOUSE KEEPING
10 a) Working platform, access ways and landing cleared off any /
obstructions, loose objects and tripping hazard
b) Scaffold free from debris unused formwork, scaffold components, /
ets.
CHECK LIST FOR FALSEWORK (C60)

Contractor : KAM CHIUN CONSTRUCTION SDN BHD Date : 22/3/2024


Scaffold Inspector : MECCILECT SDN BHD - Steve Time : 9.30 AM
Scaffold Designer : ERA SCAFFOLD SYSTEM SDN BHD
Site Address : DEXCOM Batu Kawan
Location Of Scaffold : Zone 5 & Link Bridge Scaffold Type : C60 Shoring System

Genaral Remark / 1. Add box tie to RC Column


:
Additional Action needed 2. please check the Steel beam span, make sure follow the PE drawing
3. add tube fitting for scaffold tower

INSPECTED BY: Review by:

Proffesional Engineer
Ir Cheng Ming Kai
Date :22/03/2024
- Add box-tie at every RC column to
external scaffold

- please check the I-beam span


make sure similar with the PE
drawing (±10300mm).
- Add tube fitting at link bridge area