INDEX
1. INTRODUCTION...................................................................................................... 4
1.1. PROJECT OVERVIEW ............................................................................................ 4
1.2. SCOPE OF THE DOCUMENT ................................................................................... 6
1.3. OBJECTIVES......................................................................................................... 6
2. METHODOLOGY..................................................................................................... 9
2.1. OVERVIEW ........................................................................................................... 9
2.2. QUANTITATIVE EVALUATION OF THE CONSEQUENCES............................................. 9
2.2.1. Physical model for evaporation and dispersion ...................................... 10
2.2.2. Vulnerability for humans ......................................................................... 11
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
1. INTRODUCTION
Distance to LNG
GPS coordinates
Plant (km)
Site Latitude Longitude
LNG plant Refer to CWO01-ING-PR01 latest revision
TE-5 32.994403° -2.365228° 1.9
TE-6 33.008253° -2.346122° 0.2
TE-7 32.996822° -2.356828° 1.3
Main Camp (TE-6) 33.004101° -2.352339° 1
Water well (Hassi
33.03577741° -2.40188858° 5.8
Lahcen)
Main road 33.055179° -2.373534° 7
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
1.3. Objectives
The objectives of this study are:
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
1.4.3. Others
[11] Methanol MSDS (https://www.sigmaaldrich.com/IT/en/sds/sial/322415)
[12] CDC NIOSH Pocket Guide to Chemical Hazards - Methanol
(https://www.cdc.gov/niosh/npg/npgd0397.html)
1.4.4. Abbreviations
ALARP
API American Petroleum Institute
BPD Barrel Per Day
BOPD Barrel of Oil Per Day
CCPS Center of Chemical Process Safety
CMPT Center for Marine and Petroleum Technology
DNV Det Norske Veritas
H&MB Heat and Material Balance
HSE Health, Safety, and Environment
IDLH
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
2. METHODOLOGY
2.1. Overview
This Technical Note follows a semi-quantitative approach to evaluate risks for
Plant personnel and environment due to evaporation pond activity during Plant
operation. In particular, this approach foresees:
The following sections detail the steps of the methodology listed in above
bullets.
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
Note that the commercial code DNV Phast 8.6 is the best engineering
recommended tool by well-recognized technical literature (ref. [2]) for the
analysis of the consequences of oil and gas industrial plants. It includes
mathematical models to evaluate the physical effects of evaporation from pool
and gas dispersion.
The simulation of evaporation from pool has been carried out by the relevant
“stand-alone” model of DNV Phast 8.6 adopting as input data the pool
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
evaporation rate,
weather classes.
flammable iso-contour curves and values for thresholds: UFL, LFL and
LFL/2, for flammable compounds of the mixture (in our case are methane
and methanol)
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
other approaches, such as Probit one, provide concentration values for greater
fatality levels.
Health
The adverse effects for Plant personnel due to continuous exposure to vapours
produced by evaporation pond are evaluated adopting the threshold value
recommended by NIOSH:
TLV-TWA
TLV-STEL
The TVL (Threshold Value Limit) is the limit level of exposure for a worker per
shift in its worktime without adverse effects. In detail, the TVL-TWA (Time
Weighted Average) is referred to average exposure on the basis of a 8h/day,
40h/week work schedule, while the TVL-STEL (Short-Term Exposure Limit) is
referred to a 15-minute TWA exposure that should not be exceeded at any time
during a workday.
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
0.35 bar overpressure: 15% lethality for people outdoors, in the open
0.5 bar overpressure: 50% lethality for people outdoors, in the open
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
Rainfall mm/day 0 80
Ground Temperature (@ °C 5 30
0.9m depth)
Humidity % 18 70
2F: Moderate stable condition; wind at 2 m/s and Pasquil class equal to
“F”.
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
Note that the above selection of weather conditions represent the worst cases
in terms of effects of dispersion based on atmospheric condition of Plant
location reported in Table 1.
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
The Centre of Disease Control and Prevention has published the following
toxicological data from NIOSH about methanol (ref. [12]):
IDLH: 6000 ppm
TVL-TWA: 200 ppm
TVL-TWA: 250 ppm
LC50 for rat: 64000 ppm
Molecular weight: 32.1 kg/kmol
Flash point: 9.7°C
LFL: 5.5 %(V)
UFL: 44 % (V)
Vapor pressure 96 mmHg
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
Risk levels are evaluated adopting the Italfluid risk matrix. The risk acceptability
criteria are reported in the risk matrix and they are:
Low risk: acceptable risk, no mitigation measures shall be take into
account.
Medium risk: risk at ALARP, i.e. mitigation measures shall be evaluated
and implemented if their cost is not disproportionate to the achievable
benefit.
High risk: risk not acceptable, mitigation measures shall be put in place.
Reputation
Has Happen
Severity
People
Assets
Slight
1 health Slight Slight Slight Low Risk
effect / effect damage impact
injury
Minor
2 health Minor Minor Minor
Medium Risk
effect / effect damage impact
injury
Major
3 health Local Local Local
effect / effect damage impact
injury
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
5. CONSEQUENCES MODELLING
From Figure 4 the maximum value of mean vaporization rate versus time is
approx. 1.2 kg/s. It occurs for weather condition 10C/D. Conservatively, it has
been applied to all cases of atmospheric dispersion.
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
The following picture shows a side view of the maximum iso-contour curves for
200 ppm at human height:
Figure 7 – Side view of iso-contour curves for 200 ppm at human height
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
6. RISK EVALUATION
6.1. Safety
The risk evaluation has been carried out considering that the evaporation
scenario can occur frequently, i.e. more times during Plant operation life.
Therefore, the frequency of occurrence has been qualitatively estimated equal
to “E” of the risk matrix (Figure 3 of chapter 4. ). Based on the assessment of
the consequence reported in previous chapter 5. , the severity can be
estimated as follows:
“1” (slight effects/injury) in case of occasionally exposure to vapour from
evaporation pond, e.g. during inspection, maintenance within 75 meters
of radius from evaporation pond.
Not Applicable outside 75 meters of radius from evaporation pond.
“3” (major effects/injury) in case of permanent exposure of workers within
a radius of 75 meters from evaporation pond for the whole working time.
Based on the above considerations the risk level for human health result:
Always ACCEPTABLE outside 75 meters of radius from evaporation
pond.
ACCEPTABLE inside 75 meters of radius from evaporation pond in case
of occasionally exposure to vapour, e.g. during inspection and
maintenance, applying the Company HSE procedures.
NOT ACCEPTABLE in case of permanent exposure of workers within a
radius of 75 meters from evaporation pond for the whole working time.
6.2. Environment
Risk for environment result always acceptable based on the MSDS of methanol
substance considering that all local environmental regulation as well as
Company HSE procedures and Company emergency spill plans shall be
applied.
Contractor
Date Rev.
ITALFLUID/I.M.S.P. MOROCCO
Document Title
Engineering Evaportation Pond Risk
ITALFLUID Geoenergy S.r.l. Assessment – Technical Note
03/10/2022 1
7. CONCLUSION
The present study reports the assessment of risks for human health, safety and
environment related to the evaporation pond during Tendrara Plant operation.
The risk assessment has been carried out adopting a quantitative approach for
evaluation of the consequences for safety and health due to vapours produced
by evaporation pond during operation. In particular, the release rate versus time
of evaporation pond has been evaluated by pool vaporization model as well as
the atmospheric dispersions have been simulated adopting the unified
dispersion model of the commercial code DNV Phast 8.6.
The results of this assessment can be summarized as follows:
No hazard of gas cloud within flammable limits is identified therefore the
area can be classified as “not-hazardous” area without specific
requirement for electrical apparatus.
No hazard for safety of personnel has identified since the toxic threshold
of IDLH (which is the most conservative one) is never reached.
A potential hazard for human health is identified within 75 meters of
radius from evaporation pond sine the threshold of TVL-TWA is reached
at a distance of 75 m from evaporation pond and the threshold of TVL-
STEL is reached within 40 meters. It means that permanent presence of
personnel (8 hours per day for the whole worktime) within 75 meters from
evaporation pond should be avoid otherwise potential adverse effects
could occur. Inspection and maintenance activity can be carried out in
accordance with Company HSE procedures.
No hazard for environment is identified based on the Material Safety
Data Sheet of compounds of oily water inside evaporation pond.
The risk levels have been evaluated adopting Company Risk Matrix. The risk
level for human health results:
Always ACCEPTABLE outside 75 meters of radius from evaporation
pond.