MAAMOURA AND BARAKA DEVELOPMENT PROJECT

SPECIFICATION FOR SOIL INVESTIGATION

EX-CO 1 02/10/09 Final Issue BB CS THR

EX-CO 0 29/07/09 Issue For construction BB CS THR

EX-CO C 08/04/09 IFD BB SC/AHE HBM

EX-CO B 13/03/09 IFA BB SC/AHE HBM

A 12/01/09 IFC BB SC/AHE HBM


Validation Rev. Date Description Prepared by Checked by Approved by Company
Status Approval
Company logo and business name Project name: Company doc. Identification
3314.02.BAST.15013
Maamoura and Baraka
ETAP development project Job N

Contractor logo and business name Contractor doc. Identification

‫ﻣﻘﺎﻭﻻﺕ ﺇﻧﺠﺎﺯ ﺍﻟﻤﻨﺸﺂﺕ ﺍﻟﺼﻨﺎﻋﻴﺔ ﻭ ﺍﻟﺒﺘﺮﻭﻟﻴﺔ‬ Contract N to be assigned


Petroleum & Industrial Realisation Contractors

Vendor logo and business name Contractor doc. Identification .

Engineering Procurement and Project Management Contract N to be assigned

Audubon Engineering

Valerus Compression Services LP


Facility Name Location Scale Sheet of Sheets
Onshore Project Facilities Tazerka - Tunisia n.a. 1/20
Document Title Supersedes N na
SPECIFICATION FOR SOIL INVESTIGATION Superseded by N na
Plant Area Plant Unit
n.a. n.a.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
identification id. Status Sheets
ETAP
3314.02.BAST.15013 EX-CO 1 2/20

INDEX

INDEX ................................................................................................................................ 2
1. iNTRODUCtion: ....................................................................................................... 3
1.1 PROJECT DESCRIPTION ....................................................................... 3
1.2 DOCUMENT OBJECTIVE ...................................................................... 3
2. Consistency of work: .................................................................................................. 5
3. Procedure: .................................................................................................................. 6
3.1 Coring Drillings .......................................................................................... 7
3.2 Pressure measuring drillings ........................................................................ 7
3.3 Static penetration tests ................................................................................ 8
3.4 Laboratory tests .......................................................................................... 8
4. Elements to be given by COMPANY: ........................................................................ 9
5. work Reception: ....................................................................................................... 10
6. Authorizations - Security measures - Access: ............................................................ 11
7. Conditions of subcontracting:................................................................................... 12
8. TAXES: ................................................................................................................... 13
9. Form of the Unit prices: ........................................................................................... 14
10. DETAILED ESTIMATION: .................................................................................. 19

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
identification id. Status Sheets
ETAP
3314.02.BAST.15013 EX-CO 1 3/20

1. INTRODUCTION:
1.1 PROJECT DESCRIPTION

Eni Tunisia BV intends to construct an onshore gas-processing facility plant as part of Maamoura & BARAKA
offshore fields development Project.

Hydrocarbon gas and liquids brought onshore via two subsea pipelines will be treated at an onshore gas-
processing facility at MAAMOURA Point. Liquids (condensate and LPG) will be separated, processed and
stored. The produced sales gas and after treatment (acid gas removal, dehydration, wobbe Index control) will be
transported via pipeline to a tie-in point to an existing 10” pipeline north west of Hammamet, owned by STEG,
the National Electricity and Gas Company.

The onshore gas-processing facility will be designed for a nominal design life of 20 years, with an approximate
processing capacity of 0.85 MMSm3/day gas and associated liquids around 2000 m3/day, obtained through the
installation of one single train. The CPF will serve the following purposes:

- Associated wet gas will be sweated by gas acid removal, dehydrated, and stripped of heavy hydrocarbons to
sales quality specifications and compressed prior to be exported;
- Condensate and LPG will be recovered and stored prior to be sold and transferred by trucking.
- The produced water and the water used for oil washing is collected and treated in a suitable waste water
treatment plant before to be transported by truck for injection in Belli Water disposal well.
- Utilities and buildings will be constructed to support base operations.

1.2 DOCUMENT OBJECTIVE

The object of this specification is to define the schedule of soil investigation related to the project “Gas
Processing center” to realize on behalf of the Company Eni - Tunisia S.p.a; within the area of El Maamoura (Cap
bon - Tunisia). This document defines also the conditions of realization of corresponding works.

The projected Center Process Facilities will be built on a land located at approximately 2km in the south of the
Tazarka village. And fed by gas coming from the offshore production sites known as “Maamoura and Baraka”
via 2 offshore lines.

The project includes mainly the following installations:

- Two pipeline inlets of untreated products (approximately 3 km)


- Access roads,
- Two Oil storage tanks

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
identification id. Status Sheets
ETAP
3314.02.BAST.15013 EX-CO 1 4/20

- Three water storage tanks with various capacities


- Vessels for LPG storage.
- Equipment of gas treatment including separators and columns
- Reciprocating compressor
- one treatment unit of oily water
- one tank for treated water
- Buildings (offices, electric room, workshop, store…)
- Three truck-to truck systems
- piping supporting metallic structures (pipes racks)
- One flare
- Internal roadways and a parking.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
identification id. Status Sheets
ETAP
3314.02.BAST.15013 EX-CO 1 5/20

2. CONSISTENCY OF WORK:

The geotechnical investigations have the aim of determining the soil mechanical characteristics, for the civil
engineering study of the project, they will allow in particular:

- The choice of the foundation mode of the various installations (Tanks, Equipments, Buildings, Pipe
racks…), and the dimensioning of the foundations.
- The choice of the structure of the roadway according to the class of the supporting ground.

They will in addition allow studying the conditions of trenches execution and re-employment of excavation
materials coming from these trenches of inlets pipelines.

The program of geotechnical surveys will consist of the following works:

In situ tests:

- The realization of five (05) pits for soil characteristics investigation of 2 m depth each, at a rate of one pit
each 500 m along the inlet pipelines route; the soil temperature measurement in the wells and the realization
of measurements of the ground resistivity according to method of “WENNER”. The water level shall be
indicated if any.
- The realization of three (03) pits for soil characteristics investigation within the platform area for the access
roads and the internal roadways; this investigation is to be carried out by drilling the ground with auger or
manually for a depth of 1 m. From each pit, one sample shall be taken for laboratory tests (identification and
Proctor tests and CBR),
- The realization of two borehole drillings: one drilling shall be of 15 m depth placed to the compression unit
location, the second one shall be of 10 m depth placed to flare location. Intact ground samples from each
drilling will be taken to be subject of tests at the laboratory (identification and mechanical tests).
- SPT Tests (standard penetration test) will be carried out in the borehole at a rate of one test every 3 to 4 m
depth with at least one at each strata change.
- The realization of two drillings with pressure measuring tests: One drilling of 15 m depth placed to the
compression unit location, the second one shall be of 10 m depth placed to flare location. Pressure
measuring tests will be carried out in these drillings at each meter progress.
- The realization of twelve (12) static penetration tests to determine the mechanical resistance of the ground
for the installations other than compressor unit and flare. The equipment will be thorough until 10 m in
depth, except if a refusal is obtained before this depth.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
identification id. Status Sheets
ETAP
3314.02.BAST.15013 EX-CO 1 6/20

Laboratory tests:

- The realization of the identification tests on the samples taken from investigation drillings and wells realized
on site:
ƒ Granulometric Analyzes by sifting and Sedimentary for the particles of size lower than 80 µ.
ƒ Water content,
ƒ Limits of Atterberg,
ƒ Equivalent sand,
ƒ Density of the fine grained soils,
ƒ dry Density of the solid matter constituents,
- The realization of direct shear tests by “Casagrande box” on the samples taken during the borehole drillings,
to determine the intrinsic characteristics of the ground Cu and φu,
- Chemical analyzes of the ground: contents expressed in % of weight compared to solid materials (insoluble,
carbonates, chloride and out of gypsum), degree of aggressiveness.
- Chemical analyzes of the drillings water: PH, dry residue, contents of chlorides (Cl-) and sulfates (SO4--),
degree of aggressiveness.
- The realization, on the samples taken during the platform soil exploration pits, of bearing pressure tests
CBR (dry and after 4 days absorbing) and of PROCTOR tests;

Drillings layout drawings produced will be communicated to the company before the commencement of works.

These drawings must be annexed to the geotechnical report which will be delivered after the work.

3. PROCEDURE:

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
identification id. Status Sheets
ETAP
3314.02.BAST.15013 EX-CO 1 7/20

The company undertakes to complete the work object of this consultation in accordance with the
recommendations of the standards in force. He assures the perfection of the work conditions in order to ensure
the reliability of the results of the investigations. The company must be equipped with the material and necessary
tools to make a success of the programmed investigation, and before starting the mechanical tests envisaged, he
should provide to company ENI - Tunisia, the calibration certificates of the various measuring devices.

The tests must be realized with the greatest care, in accordance with the recommendations of the standards in
force.

3.1 CORING DRILLINGS

- Maximum lengths of coring passes must be compatible with the materials nature. The use of the diamond
drill is required where hard formations are met.
- Coring in sands must be carried out by means of the adequate tools guaranteeing the maximum of recovery
(XP P 94-202 appendix C: choice of the sampling technique).
- Intact test sample selection must be carried out in accordance with the regulations of the standards in force;
in particular, for the fine cohesive soils very soft with farms, only stationary piston sampler and thin-walled
piston are authorized. The use of simple pistons is formally prohibited for the intact sampling object of the
mechanical tests in laboratory.

3.2 PRESSURE MEASURING DRILLINGS

- Pressure measuring tests must be realized in accordance with the recommendations of standard NF P 94-
110.
- Methods of realization of Pressure measuring drillings depend on the nature of the soil, their state and the
presence of the water table. The drilling company must have the adequate means, to being able to guarantee
the maintaining of the drilling walls with the minimum of reshuffle.
- Maximum lengths of the drillings made before tests must be in conformity with the recommendations of the
standards in force (APPENDIX C of standard NF P 94-110). As an indication, for fairly compact clays, like
for the loose silts and sands under the water table, the maximum lengths of drillings before tests should not
exceed 3m.
- Before the starting of the Pressure measuring tests, the drilling company shall make sure of the state of the
measuring equipment; calibration tests must be realized at the beginning of any work station, with each
change of configuration of the pressure measuring probe and each time a modification of connection
between the controller pressure-volume and the probe intervenes.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
identification id. Status Sheets
ETAP
3314.02.BAST.15013 EX-CO 1 8/20

- Tests will be carried out using probe with weak inertia in the formations having poor mechanical
characteristics and using standard probe when those formations are more resistant.

3.3 STATIC PENETRATION TESTS

These tests will be carried out in accordance with standard NF P 94-113, using a static penetration equipment
“Gouda” of 20 tons heaviness.

3.4 LABORATORY TESTS

The tests at the laboratory must be carried out in accordance with the following standards:

- Water content must be given in accordance with standard NF P 94-049-1 or NF P 94-049-2 or NF P 94-
050.
- Limit of Atterberg must be given in accordance with standard NF P 94-051.
- The granulometric analysis must be realized in accordance with standard NF P 94-056.
- Sedimentary analysis for the particles of size lower than 80 µ, in accordance with standard NF P 94-057.
- Determination of the wet density of the fine grained soils must be realized in accordance with standard NF
P 94-053.
- Determination of the density of the solid matter constituents must be realized in accordance with standard
NF P 94-054.
- The sand equivalent, in accordance with standard NF P 18-598
- Direct shear testing with “Casagrande box” in accordance with the standard NF P 94-071-1 and NF P 94-
071-

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
identification id. Status Sheets
ETAP
3314.02.BAST.15013 EX-CO 1 9/20

4. ELEMENTS TO BE GIVEN BY COMPANY:

The company will give to company ENI - Tunisia a geotechnical report detailing the following elements:

- Description of the conditions of realization of all work and the material/Equipment used for each type of
service.
- Drilling layout drawings
- Lithological section visually describing the nature of the soil horizons met in each drilling and well
exploration with indications of the levels of samplings (intact and reshuffled) and of the ground water if it is
met.
- Results of the static penetration tests
- Results of the pressure measuring tests
- Complete results of laboratory analyzes of the samples of ground taken from pits and drillings made on site.
- Results of measurements of resistivity of the ground.

The samples of the drillings used in laboratory tests, will have to be preserved under suitable climatic conditions
for the studies and a possible control by the company ENI - Tunisia during or after the completion of the work.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Valid. Sheet of
Contractor doc. id. Revision
identification Status Sheets

3314.02.BAST.15003 EX-CO C 10/20

5. WORK RECEPTION:

Work will be completed under the supervision of a representative of the Company ENI - Tunisia.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Valid. Sheet of
Contractor doc. id. Revision
identification Status Sheets

3314.02.BAST.15003 EX-CO C 11/20

6. AUTHORIZATIONS - SECURITY MEASURES - ACCESS:

It is up to the company to obtain all the administrative authorizations necessary for the realization of the services
object of this specification. However, the company ENI - Tunisia will deliver to him, under its request, a
certificate certifying that it is in charge of the realization of this work.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Valid. Sheet of
Contractor doc. id. Revision
identification Status Sheets

3314.02.BAST.15003 EX-CO C 12/20

7. CONDITIONS OF SUBCONTRACTING:

The company is committed not to sub-contract a whole or part of the work object of this specification.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
ETAP identification id.entification Status Sheets

3314.02.BAST.15013 EX-CO 1 13/20

8. TAXES:

The company will conform to the law in force in Tunisia concerning local property tax and duty.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
ETAP identification id.entification Status Sheets

3314.02.BAST.15013 EX-CO 1 14/20

9. FORM OF THE UNIT PRICES:

The unit prices of the estimate details of this consultation are intended to remunerate the company for all the
charges necessary to the realization of work such as: displacements, wages, materials, social contributions, profits,
reproduction, supplies of documents, local property tax and the taxes, etc….

These prices shall apply, each one, with the unit which is envisaged to it and specified in the estimate attached in
appendix. They are not revisable prices.

The quantities to be considered for the payments are the quantities really carried out.

LAMPOOLS AND DEFINITION OF THE ARTICLES


IN-SITU TESTS

1 Mob & Demob


This price remunerates contractually, the following operations:
- Bringing on the site of the drillings to be realized all the hardware necessary for the
realization of work;
- The displacement of the material from a drilling point to another,
- The folding of the material at the end of the work.
Unit: Lump sum (LS)

2 Geotechnical exploration pits – Pipelines route


This price remunerates the following operations:
- the realization of pits carried out manually or using a mechanical means on a 2 m depth for
a visual recognition of the nature of the ground met,
- the sampling altered for complete identification at the laboratory,
- the measurement of the temperature of the ground or water in the well
- supply of the sections describing the lithology of the layers met;

Price also includes/details the filling of the wells and the repairing of the places.
Unit: the Unit (U)

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
ETAP identification id.entification Status Sheets

3314.02.BAST.15013 EX-CO 1 15/20

3 Measurement of soil resistivity


This price remunerates to the unit, the realization of measurements of resistivity of the soil,
along the projected pipeline. The method of measurement to be used for the determination
of the ground resistivity is that of “Wenner” or of the four electrodes.

Unit: the Unit (U)

4 Geotechnical exploration pits - Platform Roads


This price remunerates the following operations:
- the realization of pits carried out manually or using mechanical means on a depth of 1 m for
a visual recognition of the nature of the soil met,
- the sampling altered for complete identification at the laboratory and Proctor tests and CBR,
- supply of the sections describing the lithology of the layers met;

Price also includes/details the filling of the wells and the repairing of the places.
Unit: the Unit (U)

5 Tests of Static Penetration

This price remunerates by the unit, the realization of tests of static penetration. The tests will
be thorough until a 10 m depth (except if a refusal is obtained before this depth). The price
includes/details the following operations:
- The filing on a datasheet of each test of static Penetrometer
- The measurement of the resistance of the point and the skin friction of the penetrometer
progressively with the advance of the testing, whatever the nature of the ground is.
- The repairing of the places such as they were before work.

Unit: the Unit (U)

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
ETAP identification id.entification Status Sheets

3314.02.BAST.15013 EX-CO 1 16/20

6 Cored drillings

This price remunerates by the linear meter, the realization of cored drillings. The coring will
have 10 and 15 m of depths. The price includes the following operations:
- The filing on a datasheet of each test of coring drilling
- The realization of the drillings, whatever the nature of the ground is
- Supply of the cases with carrots
- The intact sampling
- The realization of SPT tests
- The repairing of the places such as they were before work.

Unit: the linear meter (ml)

7 Pressure measurement drillings


This price remunerates by the linear meter, the realization of pressure measurement drillings.
The drillings will have 10 and 15 m of depths. The price includes/details the following
operations:
- The filing on a datasheet of each test of pressure measurement drillings
- The realization of drillings, whatever the nature of the ground
- The realization of the pressure measurement tests at a rate of a test all meters
- Examination of the results of the tests
- The repairing of the places such as they were before work.

Unit: the linear meter (ml)

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
ETAP identification id.entification Status Sheets

3314.02.BAST.15013 EX-CO 1 17/20

TESTS AT THE LABORATORY

Complete Identification
8
This price remunerates the following operations:
- Preparation of the sample
- Realization of the analyzes of identification: granulometric analysis by sifting and
sedimentometry for the fractions lower than 80 microns, natural water content, limits of
Atterberg or sand equivalent, wet and dry density, content of organic matters.

Unit: the Unit (U)

Proctor Tests and CBR


9
This price remunerates the following operations:

PROCTOR test modified with determination of IPI (initial punching index: the dry CBR) and
ICBR after 4 days of imbibition with 3 moulds 10, 25 and 55 blows.

Unit: the Unit (U)

Shear testing to the box


10
This price remunerates, to the unit, the direct shear testing to the box of Casagrande for the
determination of the intrinsic characteristics (Cu and φu) of a sample.
The price includes the intact test sampling to the wells to be carried out on the level of
anchorages blocks at the ends of the pipeline.

Unit: the Unit (U)

Chemical analyzes of the ground


11
This price remunerates, to the unit, the Chemicals tests to be realized on soil samples taken
from the exploration wells:
PH, solid matters expressed in % of weight compared to dry materials (insoluble, carbonates,
chloride and out of gypsum), degree of aggressiveness.
Unit: the Unit (U)

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
ETAP identification id.entification Status Sheets

3314.02.BAST.15013 EX-CO 1 18/20

Chemical analyzes of water


12
This price remunerates, to the unit, the Chemicals tests to carry out on water samples possibly
taken from the exploration wells or the coring drillings if the water table is met with less than
5 m in depth:
PH, solid matters, chlorides contents (Cl-) and sulfates (SO4- -), degree of aggressiveness.

Unit: the Unit (U)

Geotechnical report
13
This price contractually remunerates the supply of a geotechnical report referring to all the
geotechnical survey carried out. It must contain in particular:
- The description of the conditions of realization of work and the material used for each task.
- The layout drawings of the surveys
- Results of in situ tests and the tests carried out at the laboratory.
Report will be provided in five copies.

Unit: Lump sum (LS)

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
ETAP identification id.entification Status Sheets

3314.02.BAST.15013 EX-CO 1 19/20

10. DETAILED ESTIMATION:

P.U Total price


DESIGNATION Unit Quantity
(DT HTVA) (DT HTVA)

IN SITU TESTS
LS 1
1. MOB & DEMOB.

2. Geotechnical exploration pit of 2 m in depth, along


the pipelines route, including sampling and supply of U 5
the sections describing the nature of the grounds
met.

3. Measurements of the resistivity of the soil.


U 5

4. Geotechnical exploration pit of platform roads soil


of 1 m depth, including sampling and supply of the
sections describing the nature of the grounds met. U 3

5. Tests with the static penetrometer U 12

6. Coring drillings ml 25

7. Pressure measurement surveys ml 25

TESTS AT THE LABORATORY


8. Complete identification of the samples taken in the U 13
coring drillings and exploration well.

9. Proctor tests and CBR U 3

10. Direct shear testing to the box of Casagrande on


intact samples. U 4

11. Chemical analyzes of the samples of soil U 2

12. Chemical analyzes of water U 2

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Company document Contractor doc. Valid. Sheet of
Revision
ETAP identification id.entification Status Sheets

3314.02.BAST.15013 EX-CO 1 20/20

GEOTECHNICAL REPORT
LS 1
13. Summary report in 5 copies
GRAND TOTAL HTVA (DT)

Detailed estimation fixed to the sum of:


..........................................................................................................................................

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.