Facility and Sub Facility Name Scale Sheet of Sheets
1st Agri Hub - Industrial Start-Up - General
NA 1 / 23
Document Title Supersedes N.
Superseded by N.
QUALITY CONTROL PLAN FOR PIPING - GENERAL Plant Area Plant Unit
NA NA.
Software: Microsoft Word File Name: 708016021.docx
30A100DBQB23070 30A100DBQB23070 2 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
TABLE OF CONTENTS
1.0 INTRODUCTION................................................................................................................................... 3
2.0 PURPOSE............................................................................................................................................. 3
3.0 SCOPE.................................................................................................................................................. 3
4.0 DEFENITONS AND ABBREVIATIONS................................................................................................ 4
4.1 DEFINITIONS........................................................................................................................................ 4
4.2 ABBREVIATIONS.................................................................................................................................... 4
4.3 INSPECTION POINT TYPOLOGIES........................................................................................................... 5
5.0 REFERNCE DOCUMENTS................................................................................................................... 6
5.1 COMPANY / PROJECT’S REFERENCE DOCUMENTS...................................................................6
5.2 INTERNATIONAL CODE................................................................................................................... 6
6.0 DESCRIPTION OF ACTIVITIES............................................................................................................ 7
6.1 ORGANIZATION AND RESPONSIBILITIES......................................................................................7
6.2 ATTACHEMENTS – QUALITY CONTROL FORMS..........................................................................8
7.0 MATRIX OF INSPECTION ACTIVITIES................................................................................................ 9
8.0 SUMMARY OF QC FORMS ATTACHEMENTS.................................................................................17
8.1 QCF_004 - EQUIPMENT CALIBRATION LIST................................................................................18
8.2 QCF_014 - FIT-UP INSPECTION REPORT....................................................................................19
8.3 QCF_016 - MATERIAL RECEIVING INSPECTION REPORT.........................................................20
8.4 QCF_017 - WELDING CONSUMMABLES CONTROL LOG...........................................................21
8.5 QCF_018 - VISUAL & DIMENSIONAL CONTROL INSPECTION REPORT....................................22
8.6 QCF_019 - NDT REQUEST FORM................................................................................................. 23
LIST OF TABLES
TABLE 1: DEFINITIONS..................................................................................................................................... 4
TABLE 2: ABBREVIATIONS................................................................................................................................ 4
TABLE 3: INSPECTION POINT TYPOLOGIES - INTERVENTION POINTS...................................................................5
TABLE 4: REVIEW OF CERTIFICATION............................................................................................................... 5
TABLE 5: PROJECT'S REFERENCE DOCUMENTS................................................................................................ 6
30A100DBQB23070 30A100DBQB23070 3 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
1.0 INTRODUCTION
In December 2020 Eni agreed to discuss circular economy and sustainable agricultural initiatives to develop
biofuels and bio-feedstock industry in Congo Republic, supporting the Country to reach its decarbonization
targets through 2030.
During 2022, Eni and Congo Republic Government will jointly conduct studies to assess the feasibility and
economic attractiveness of projects in the areas of agricultural development, used cooking oil, bioethanol
and bio-refining with the purpose of leveraging agricultural waste and vegetable oil as a feedstock for bio-
refineries. More specifically Eni and Congo Republic Government has agreed on developing fast track
activities for agricultural development activities, reaching production of bio feedstock by 2023.
The agricultural development project focuses on the development of sustainable oil crops cultivations in
Congo Republic such as cover crops (brassica carinata, camelina sativa), castor seeds, croton trees in agro-
forestry systems and other agro-industrial co-products.
2.0 PURPOSE
The purpose of this document is to prepare Construction Quality Control Plan indicating various checks/
inspection activities to be performed by ZEROCK CONSTRUCTION for the CONGO - BIO-FUEL
INDUSTRIAL STARTUP AGRIHUB Project and the type of records to be generated as evidence of
performance of various activities.
To define the different stages of inspection during Piping Fabrication Welding & NDT activities.
To identify Construction responsibility at each step.
To define Inspection levels by CONTRACTOR, SUBCONTRACTOR, and COMPANY during the piping
work activities.
To define the relevant reports to be used for record and certification.
3.0 SCOPE
The project quality plan describes the requirements of quality management system and the activities
stipulated. It provides the basic document used for the quality management system, and supplies the
information that is identical with the quality management system.
The Plan is applicable for the Project Management, Engineering, Construction, Installation, and
Commissioning of the Bio-Fuel Industrial Startup AgriHub Project.
This document shall be read in conjunction with the applicable project specifications and MS.
30A100DBQB23070 30A100DBQB23070 4 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
4.1 Definitions
Table 1: Definitions
Eni Congo. The Party that owns, initiates and develops the Project, ultimately
OWNER / COMPANY
paying for its Investment and Operating costs.
PROJECT BIOFUEL – INDUSTRIAL START-UP AGRI HUB
The Form of Agreement together with the documents in order of priority,
CONTRACT including the exhibits, drawings, specifications and documents referred to
and in the order of precedence listed in the Form of Agreement
ZEROCK - The organization responsible for the execution of a Project
CONTRACTOR
Development Contract.
The organization, appointed by a Contractor, for the provision of a
SUBCONTRACTOR
part of the goods and/or services included into the Contract’s Scope.
Firm awarded with a Purchase Order by CONTRACTOR to supply
VENDOR
Equipment or Material for the PROJECT
Each Party entitled to witness or certify and inspection or test or to
PARTY
review its results
Independent verification party as an appointed Third-Party Inspection or
THIRD PARTY
Authority or Certification Agency
4.2 Abbreviations
Table 2: Abbreviations
S/C SUBCONTRACTOR
CTR CONTRACTOR – ZEROCK CONSTRUCTION
CPY ENI CONGO
RFI REQUEST FOR INSPECTION
TPI THIRDPARTY
AFC APPROVED FOR CONSTRUCTION
MAR MATERIAL ACCEPTANCE REQUEST
CAR CORRECTIVE ACTION REPORT
NCR NON CONFORMANCE REPORT
DPI DYE PENETRANT INSPECTION
MPI MAGNETICE PARTICLE INSPECTION
PWHT POST WELD HEAT TREATMENT
RFI REQUEST FOR INSPECTION
PMI POSITIVE MATERIAL IDENTIFICATION
WPS WELDING PROCEDURE SPECIFICATION
PQR PROCEDURE QUALIFICATION RECORDS
NDT NON-DESTRUCTIVE TESTING
30A100DBQB23070 30A100DBQB23070 5 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
Full
FI CONTRACTOR/SUBCONTRACTOR is responsible for undertaking the Inspection/Test
Inspection
RFI is required. The PARTY shall witness and sign for acceptance the inspection notice
form. The verifying PARTY must be notified in advance of the execution process. The
H Hold Point CONTRACTOR (or SUBCONTRACTOR) is not allowed to proceed in case of PARTY
absence unless written permission is given. Further following certification shall be
submitted for review (e.g. Laboratory / Third Party Service Company)
RFI is required. The PARTY shall optionally witness. The CONTRACTOR (or
SUBCONTRACTOR) can proceed with inspection even if PARTY is absent.
Witness CONTRACTOR shall sign all the witnessed tests. The PARTY shall sign for acceptance
W
Point of the witnessed inspection and/or test, after review of the CONTRACTOR’s (or
SUBCONTRACTOR’s) relevant Inspection Report. Further following certification shall be
submitted for review (e.g. Laboratory / Third Part Service Company).
RFI is not required. The PARTY shall spot witness during job execution. The
CONTRACTOR (or SUBCONTRACTOR) can proceed whether or not the witnessing
PARTY is present. Certification, if any, shall be spot reviewed.
Surveillance
S COMPANY and/or COMPANY contracted verifying THIRD PARTY representatives will
Point
monitor on a routine basis without specific pre-arrangement with CONTRACTOR and
without stopping the work, in order to verify that agreed procedures and methods are
being followed.
RFI is not required. The PARTY shall not participate to the test. The relevant certification
shall be submitted for review after the execution of the test. In this case, COMPANY will
Review
R specify “Review” for all the documents that the CONTRACTOR is required to submit to
Point
COMPANY for review, before executing the relevant task or part of works or operations
(or to communicate, for review, the results of inspections and/or tests performed).
Review of certification
A - Approval. The Party placing the letter “A” intends to approve the material prior to use, the trial test, the
mock-up, etc…
30A100DBQB23070 30A100DBQB23070 6 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 7 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
Quality Manager: Responsible to prepare and issue this document and responsible for all
QUALITY activities of the project. He v/ She shall also be responsible for
resolving non-conformities in consolation with the Construction Manager
and Eni Congo Rep.
Project Manager: Responsible to ensure that information concerning the work is available on
site.
Construction Manager: Responsible for implementation of this procedure to ensure quality work,
safe use, handling, storage and erection operations. The Construction
Manager shall use specialized, project management techniques to oversee
the planning and construction of the project, from its beginning to its end.
Quality Control Supervisor: Responsible to monitor, review and collect all relevant quality records
verifying its adequacy and make sure those records are correctly archived.
Quality Control Inspectors: They shall be responsible for issuing all necessary reports once finished
and accepted the activity obtaining approvals, as established in this
document and in the quality control plan. Various QC Inspectors shall be
engaged to cover all works scopes which are not limited to welding, piping,
civil, painting, Electrical and Instrumentation.
Site Engineer: He shall be responsible for the complete activity including, but not limited to:
Work planning and risk assessment at work place.
Ensuring that they observe the requirements pertaining to Safety and
Quality for this work. Manage manpower, equipment and materials for
safe and timely completion of work. Ensure that method statement is
followed strictly and implemented at site.
To prepare daily progress report and send to planning, area manager
and other related concerns.
HSE Officer: Shall be responsible for the implementation of the HSE procedures before
and during the execution of piping fabrication and installation. Shall be
responsible for check for any unsafe conditions on the working areas and
liaise with field supervisor ensuring that the work is carried out as per
approved Project Safety plan and procedure. Advise the construction crew
on HSE aspects and ensure their safety. Arrange through Job performer for
tool box talk covering risk Cross checking certified material devices and
equipments are used. Do weekly, monthly HSE audit.
Ensure appropriate safety measures are taken as per the risk assessment
and controlled documents.
Ensure that all staff adhere to the HSE plan and HSE requirements.
30A100DBQB23070 30A100DBQB23070 8 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 9 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
Delivery Note
Project Specification/
Material Receiving Inspection:
Contract Requirements Mill Certificates /
Material identification and Material Receiving
1.2 BS EN 10204 3.1. FI R N/A
surface quality. Inspection Report
Purchase Order
Mill Cert.
ASME B36.10 / 19M
1.3 Handling and Storage of Packing List FI R N.A.
materials: Project Specification / As per Project Project Specification
Verify fabrication Procedure Specification / Procedure / Procedure
This document is property of Eni Congo SA.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Company Document ID Contractor Document ID Sheet of Sheets
30A100DBQB23070 30A100DBQB23070 10 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
Fit-up Inspection:
1.6 AFC Dwgs / WPS AFC Dwgs / WPS H W N/A
Dimensional Check Fit-up Inspection Report
Production Welding:
WPS/PQR Qualification
Test
ASME B31.3
Welder Qualification Test. Project Specification / WPS / PQR
1.7 ASME SEC. V / IX W W N.A.
Check correct Procedure WPS/PQR
WQTR
consumable
Welding (GTAW Process
and SMAW Process)
1.8 Visual Inspection of Visual Inspection FI W N.A.
Weldments: Project Specification / ASME SEC. V – Article 9 Report
Verify that all completed Procedure
This document is property of Eni Congo SA.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Company Document ID Contractor Document ID Sheet of Sheets
30A100DBQB23070 30A100DBQB23070 11 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 12 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 13 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
1.3 Pipe Cleaning: Project Spec. / Method As per Project Material inspection W W N.A.
The pipe end Cap/Seal Statement Specification / MS Report
will not be removed until
the pipe is to be installed.
At openings for branches
in pipe, all material,
which falls into the pipe,
will be removed before
Grooving/Threading in
the branch fittings.
Internal and external
part of pipe and pipe
fittings will be clean and
free from oil, rust, scale,
and other material that
would be detrimental to
This document is property of Eni Congo SA.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Company Document ID Contractor Document ID Sheet of Sheets
30A100DBQB23070 30A100DBQB23070 14 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
Pre-Installation:
Location survey
Covering of spool ends.
Completion of painting Visual inspection
1.7 Project Specification / MS Isometric / P&ID FI/W W N.A.
activities where Report
necessary.
Completion of grooving if
necessary.
Pipe Installation:
Isometric / P&ID
Clearance for installation
NFPA 13, NFPA 14, Visual inspection
1.8 Supporting Project Specification / MS FI/W W N.A.
NFPA 15 and NFPA 16 Report
Valves and Instruments
Flow line elevation and slope.
1.9 Pressure Test for Pipe Isometric / P&ID Pressure Test Report H H N.A.
Installation: Project Specification / Test NFPA 13, NFPA 14, Test pressure as
30A100DBQB23070 30A100DBQB23070 15 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
Documentation:
Review all Quality report and Project Specification / Contract
2.0
Documents
Approved Dwgs Final Documentation FI R N.A.
compile all quality documents
30A100DBQB23070 30A100DBQB23070 16 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 17 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 18 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 19 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 20 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 21 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 22 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 23 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
LOCATION OF INSPECTION: PO. NO.: SUPPLIER NAME: SHIPPING DOC NO.: PAGE:
DIMENSION QUANTITY
HEAT CERTIFICATE
PO MARK QT Y NCR/OBS
S/ ITEM SPEC/GR /LOT /
ITE CODE/ DIA(ø) SCH/T INPSECTION RESULT NO. REMARKS
N DESCRIPTION ADE REC' PACKIN /BATCH DOCUMEN
M TAG / HK P.O. (If Any)
VED G LIST NO T NO.
NO NO LENGT (mm)
H(m)
RFI No.
ISSUED DATE;
30A100DBQB23070 30A100DBQB23070 24 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
Client: Project:
30A100DBQB23070 30A100DBQB23070 25 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 26 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
30A100DBQB23070 30A100DBQB23070 27 / 27
ENI CONGO SA
Validity Revision
QUALITY CONTROL PLAN FOR PIPING - GENERAL Status Number
EX-DE 00
RFI No.