Professional Documents
Culture Documents
ZEROCK CONSTRUCTION
30A100DBQB23150
Contract N.
Facility and Sub Facility Name Scale Sheet of Sheets
1st Agri Hub - Industrial Start-Up - General
NA 1 / 100
Document Title Supersedes N.
Superseded by N.
QUALITY CONTROL PLAN FOR INSTRUMENTATION WORKS Plant Area Plant Unit
NA NA.
Software: Microsoft Word File Name: 708015732.docx
TABLE OF CONTENTS
1.0 INTRODUCTION..................................................................................................................................... 4
2.0 PURPOSE............................................................................................................................................... 4
3.0 SCOPE.................................................................................................................................................... 4
4.0 DEFINITIONS AND ABBREVIATIONS.................................................................................................. 5
4.1 DEFINITIONS............................................................................................................................................. 5
4.2 ABBREVIATIONS........................................................................................................................................ 5
4.3 INSPECTION POINT TYPOLOGIES................................................................................................................ 6
5.0 REFERENCE DOCUMENTS.................................................................................................................. 7
5.1 COMPANY / PROJECT’S REFERENCE DOCUMENTS......................................................................................7
5.2 INTERNATIONAL CODES............................................................................................................................. 7
6.0 DESCRIPTION OF ACTIVITIES............................................................................................................. 8
6.1 ORGANIZATION AND RESPONSIBILITIES....................................................................................................... 8
6.2 ATTACHMENTS – QUALITY CONTROL FORMS.................................................................................9
6.3 INSPECTION AND TEST PLAN CONTENT...................................................................................................... 9
7.0 MATRIX OF INSPECTION ACTIVITIES............................................................................................... 10
7.1 ITP. 001- FIRE DETECTION AND ALARM SYSTEM AND ITS ANCILLARIES....................................11
7.2 ITP. 002- ELECTRONIC ACCESS CONTROL SYSTEMS AND ITS ANCILLARIES............................13
7.3 ITP. 003- IPTV SYSTEM AND ITS ANCILLARIES...............................................................................16
7.4 ITP. 004- PAGA SYSTEM AND DATA SYSTEM AND ITS ANCILLARIES.............................................19
7.5 ITP. 005- PROCESS INSTRUMENTATION (PRIMARY FLOW ELEMENTS, INLINE FLOW
INSTRUMENTS, PRESSURE GAUGES/DRAFT GAUGES)................................................................21
7.6 ITP. 006- MISCELLANEOUS INSTRUMENT WITHOUT PROCESS CONNECTION..........................27
7.7 ITP. 007- PNEUMATIC INSTRUMENT................................................................................................. 28
7.8 ITP. 008 - PRESSURE AND DIFFERENTIAL PRESSURE TRANSMITTERS.....................................29
7.9 ITP. 009 - LEVEL TRANSMITTERS WITHOUT PROCESS CONNECTION........................................30
7.10 ITP. 010 - E/P TRANSDUCERS, CONVERTERS, SOV (WITHOUT PNEUMATIC CONNECTION)....31
7.11 ITP. 011 – ANALYSER (DETECTORS)................................................................................................ 32
7.12 ITP. 012 – CONTROL VALVE, SELF-REGULATING VALVE AND ACTUATORS...............................33
7.13 ITP. 013 – SAFETY AND RELIEF VALVES AND RUPTURE DISK......................................................34
7.14 ITP. 014 – MEASURING INSTRUMENT.............................................................................................. 35
7.15 ITP. 015 – INSTRUMENT CABLES, TRACE HEATING CABLES AND EARTHING NETWORK
(CONTROL ROOM).............................................................................................................................. 36
8.0 SUMMARY OF QC FORMS ATTACHMENT........................................................................................ 38
8.1 QCF_021 FIELD INSPECTION AND TESTING OF IT/TELECOMS CABLE (UNDER GROUND
INSTALLATION)................................................................................................................................... 40
8.2 QCF_022 AUTHORIZATION TO BACKFILL.......................................................................................42
8.3 QCF_023 FIELD INSPECTION CHECKLIST IT/TELECOMS PANEL.................................................43
8.4 QCF_024 IT/TELECOMS SPECIAL PURPOSE INSPECTION REPORT...........................................44
8.5 QCF_016 MATERIAL INSPECTION REPORT....................................................................................45
8.6 QCF_025 CONSTRUCTION QUALITY CONTROL PROCEDURE – ACCEPTANCE FOR FINISHING
OF WORKS.......................................................................................................................................... 46
8.7 QCF_026 IT/TELECOMS CIRCUIT FOLDER......................................................................................47
8.8 QCF_027 FIELD INSPECTION OF IT/TELECOMS CABLE (ABOVE GROUND INSTALLATION).....48
8.9 QCF_028 FIELD INSPECTION FOR CONDUIT & CABLE TRAY.......................................................50
8.10 QCF_030 FIELD INSPECTION OF FIRE AND GAS DETECTION SYSTEM TEST REPORT............52
8.11 QCF_031 FIELD INSPECTION OF FIBER OPTIC FINAL ACCEPTANCE TEST...............................53
LIST OF TABLES
Table 1: Definitions...........................................................................................................5
Table 2: Abbreviations.......................................................................................................5
Table 3: Inspection Point Typologies....................................................................................6
Table 4: Review of Certification..........................................................................................6
1.0 INTRODUCTION
In December 2020 Eni agreed to discuss circular economy and sustainable agricultural initiatives to develop
biofuels and bio-feedstock industry in Congo Republic, supporting the Country to reach its decarbonization
targets through 2030.
During 2022, Eni and Congo Republic Government will jointly conduct studies to assess the feasibility and
economic attractiveness of projects in the areas of agricultural development, used cooking oil, bioethanol and
bio-refining with the purpose of leveraging agricultural waste and vegetable oil as a feedstock for bio-refineries.
More specifically Eni and Congo Republic Government has agreed on developing fast track activities for
agricultural development activities, reaching production of bio feedstock by 2023.
The agricultural development project focuses on the development of sustainable oil crops cultivations in Congo
Republic such as cover crops (brassica carinata, camelina sativa), castor seeds, croton trees in agro-forestry
systems and other agro-industrial co-products.
2.0 PURPOSE
The purpose of this document is to prepare Construction Quality Control Plan indicating various checks/
inspection activities to be performed by ZEROCK CONSTRUCTION for the CONGO - BIO-FUEL INDUSTRIAL
STARTUP AGRIHUB Project and the type of records to be generated as evidence of performance of various
activities.
The main purposes are:
▪ To define the different stages of inspection during Instrumentation and Control Systems
▪ To identify Construction responsibility at each step.
▪ To define Inspection levels by SUBCONTRACTOR, CONTRACTOR, and COMPANY during the civil
work activities
▪ To define the relevant reports to be used for record and certification.
3.0 SCOPE
The project quality plan describes the requirements of quality management system and the activities stipulated.
It provides the basic document used for the quality management system, and supplies the information that is
identical with the quality management system.
The Plan is applicable for the Project Management, Engineering, Construction, Installation, and Commissioning
of the Bio-Fuel Industrial Startup AgriHub Project.
4.1 Definitions
Table 1: Definitions
OWNER / COMPANY Eni Spa, its divisions, branches and affiliates worldwide. The Party that owns,
initiates and develops the Project, ultimately paying for its Investment and Operating
costs (CAPEX & OPEX).
PROJECT BIOFUEL – INDUSTRIAL START-UP AGRI HUB
CONTRACT The Form of Agreement together with the documents in order of priority, including
the exhibits, drawings, specifications and documents referred to and in the order of
precedence listed in the Form of Agreement
CONTRACTOR ZEROCK - The organization responsible for the execution of a Project Development
Contract.
SUBCONTRACTOR The organization, appointed by a Contractor, for the provision of a part of
the goods and/or services included into the Contract’s Scope.
VENDOR Firm awarded with a Purchase Order by CONTRACTOR to supply Equipment
or Material for the PROJECT
PARTY Each Party entitled to witness or certify and inspection or test or to review its
results
THIRDPARTY Independent verification party as an appointed Third-Party Inspection or Authority
or Certification Agency
4.2 Abbreviations
Table 2: Abbreviations
CTR CONTRACTOR – ZEROCK CONSTRUCTION
CPY ENI CONGO
RFI REQUEST FOR INSPECTION
TPI THIRD PARTY
AFC APPROVED FOR CONSTRUCTION
CONST CONTRACTOR CONSTRUCTION GROUP
PREC CONTRACTOR PRE-COMMISSIONING-COMMISSIONING GROUP
MAR MATERIAL ACCEPTANCE REQUEST
QCF QUALITY CONTROL FORM
QCP QUALITY CONTROL PLAN
LAN LOCAL AREA NETWORK
MDR MANUFACTURERS DATA RECORDS
Full
FI CONTRACTOR is responsible for undertaking the Inspection/Test
Inspection
RFI is required. The PARTY shall witness and sign for acceptance the inspection notice
form. The verifying PARTY must be notified in advance of the execution process. The
H Hold Point SUBCONTRACTOR (or CONTRACTOR) is not allowed to proceed in case of PARTY
absence unless written permission is given. Further following certification shall be
submitted for review (e.g., Laboratory / Third Party Service Company)
RFI is required. The PARTY shall optionally witness. The SUBCONTRACTOR (or
CONTRACTOR) can proceed with inspection even if PARTY is absent.
Witness CONTRACTOR shall sign all the witnessed tests. The PARTY shall sign for acceptance
W
Point of the witnessed inspection and/or test, after review of the SUBCONTRACTOR’s (or
CONTRACTOR’s) relevant Inspection Report. Further following certification shall be
submitted for review (e.g. Laboratory / Third Part Service Company).
RFI is not required. The PARTY shall spot witness during job execution. The
SUBCONTRACTOR (or CONTRACTOR) can proceed whether or not the witnessing
PARTY is present. Certification, if any, shall be spot reviewed.
Surveillance
S OWNER and/or OWNER contracted verifying THIRD PARTY representatives will monitor
Point
on a routine basis without specific pre-arrangement with CONTRACTOR and without
stopping the work, in order to verify that agreed procedures and methods are being
followed.
RFI is not required. The PARTY shall not participate to the test. The relevant certification
shall be submitted for review after the execution of the test. In this case, OWNER will
Review
R specify “Review” for all the documents that the CONTRACTOR is required to submit to
Point
OWNER for review, before executing the relevant task or part of works or operations (or to
communicate, for review, the results of inspections and/or tests performed).
Review of Certification
A - Approval. The Party placing the letter “A” intends to approve the material prior to use, the trial test, the mock-
up, etc
QCF_016
QCF_021 to 032, QUALITY CONTROL FORMS ATTACHMENT
QCF_063 to 085, QCF_090 & (REFER TO SECTION 6.0)
QCF_112
Quality Manager: Responsible to prepare and issue this document and responsible for all
QUALITY activities of the project. He/ She shall also be responsible for
resolving non-conformities in consolation with the Construction Manager and
Eni Congo Rep.
Project Manager: Responsible to ensure that information concerning the work is available on site.
Construction Manager: Responsible for implementation of this procedure to ensure quality work, safe
use, handling, storage and erection operations. The Construction Manager
shall use specialized, project management techniques to oversee the planning
and construction of the project, from its beginning to its end.
Main responsibilities are:
• He oversees operations on a day-to-day basis
• He ensures the project is done to the right quality standards.
• He ensures the project is completed safely.
• He ensures the project runs on time and within the allocated budget allowance.
E & I Supervisor: Shall ensure the use of only approved construction methods and procedures.
Manage the work force on Installation of Electrical and instrumentation Control
Systems and its Ancillaries works.
Ensure quality standards are maintained.
Maintain appropriate construction tools and equipment including correct PPE
for the workers. Plan detailed work activities on day-to-day basis within overall
schedule.
Co-ordinate material, labour, and equipment for the execution of works
Conduct daily Toolbox Meetings prior to the Installation of any equipment.
Quality Inspectors: They shall be responsible for issuing all necessary reports once finished and
accepted the activity.
Obtaining approvals, as established in this document and in the quality control
plan.
Various QC Inspectors shall be engaged to in different disciple of the job.
Main responsibilities are:
• Implementing ITP‟s of fabrication, installation and testing activities.
• Verifying the material traceability as from the reception at Yard
• Inspecting, monitoring, verification of welding consumables, welder qualifications and performing in-
process inspection and testing.
• Documenting and maintaining records of all inspection and test activities throughout fabrication, and
installation.
• Performing welding inspection / dimensional inspection / painting inspection as applicable.
• Preparing Inspection & Test reports, quality records and compile all the report and quality records in
MRB.
• Notifying COMPANY about witness and hold points of inspections in advance.
E&I Supervisor/Foreman: Shall ensure the use of only approved construction methods and procedures
Manage the work force on Installation of all E&I and Controls Systems.
Ensure quality standards are maintained.
Maintain appropriate construction tools and equipment including correct PPE
for the workers.
Plan detailed work activities on day-to-day basis within overall schedule.
Co-ordinate material, labour, and equipment for the execution of works
Conduct daily Toolbox Meetings prior to the Installation of all Instrumentation &
Control Systems and its Ancillaries works.
7.1 ITP. 001- FIRE DETECTION AND ALARM SYSTEM AND ITS ANCILLARIES
ITP PHASE NO. DESCRIPTION OF ACTIVITY REFERENCE PROCEDURE QC FORM TO ACCEPTANCE CRITERIA INSPECTION LEVEL REMARK
VERIFY (CODES/STANDARDS AND
COMPLIANCE SPECIFICATION) CTR CPY TPI
01- 1 PRELIMINARY
01- 1.1 Inspection & Approval of Material Submittal QCF_016 MAR FI R N/A
material
01- 1.2 Check drawings is approved AFC DRAWINGS MDR AFC status H R N/A Drawing
and latest revision Register
01- 1.3 Check method statement is AFC DRAWINGS Method AFC status H R N/A
approved and latest revision Statement
01- 2 FIRE DETECTION AND ALARM SYSTEM INSTALLATION
01- 2.1 Authorization to Backfill QCP- Cable trench QCF_022 Back filling permit H H N/A
excavation, backfilling, and
compaction electrical
specification.
01- 2.2 Verification of Earthing and Method Statement For QCF_023 BS 5839 Specification for Fire, H W N/A
Bonding of Fire Detection Instrumentation& Control QCF_030 and & Smoke Detection System
and Alarm system Systems
01- 2.3 Verification Of Method Statement For QCF_023 H W N/A
IT/Telecommunication Instrumentation& Control As per Project specification /
Equipment Systems Manufacturer’s instructions
01- 2.4 Verification of Method Statement For QCF_023 As per Project specification / H W N/A
IT/Telecommunication Panel Instrumentation& Control Manufacturer’s instructions
Systems
01- 2.5 Verification of Conduit & Method Statement For QCF_028 H W N/A
Cable tray Instrumentation& Control As per Project specification /
Systems Manufacturer’s instructions
ITP PHASE NO. DESCRIPTION OF ACTIVITY REFERENCE PROCEDURE QC FORM TO ACCEPTANCE CRITERIA INSPECTION LEVEL REMARK
VERIFY (CODES/STANDARDS AND
01- 2.6 Verify Aboveground Method Statement For QCF_027
COMPLIANCE BS 7671 SPECIFICATION) H W N/A
Installation Works Instrumentation& Control Project specification
Systems
01- 2.7 Verify Underground Method Statement For QCF_021 BS 7671 H W N/A
Installation Works Instrumentation& Control Project specification
Systems
01- 2.8 Check Continuity Method Statement For QCF_027 BS 7671 H W N/A
Instrumentation& Control Project specification
Systems
01- 3 FINAL INSPECTION/HANDOVER
01- 3.1 Final Inspection and punch Method Statement QCF_025 Punch List Procedure H H N/A
List
01- 3.2 Review, Close out punch List, As per Project Quality Plan QCF_025, BS 7671 H H N/A
Compile QC Records and 27951.COS.QUA.STD QCF_026 Project specification
Submit Circuit Folder
7.2 ITP. 002- ELECTRONIC ACCESS CONTROL SYSTEMS AND ITS ANCILLARIES
INSPECTION
QC FORM TO LEVEL
ITP PHASE ACCEPTANCE CRITERIA (CODES/STANDARDS AND
DESCRIPTION OF ACTIVITY REFERENCE PROCEDURE VERIFY REMARK
NO. SPECIFICATION)
COMPLIANCE CTR CPY TPI
02- 1 PRELIMINARY
02-1.1 Inspection & Approval of material Material Submittal QCF_016 MAR FI R
02-1.2 Check drawings is approved and latest AFC DRAWINGS MDR AFC status H R N/A Drawing
revision Register
02-1.3 Check method statement is approved AFC DRAWINGS Method AFC status H R N/A
and latest revision Statement
02-2 ACCESS CONTROL INSTALLATION
02-2.1 Verification of Fiber optic cable test on QCF_032/ Complies with installation details and layout H W N/A
reels before proceeding on installation Method Statement QCF_064 drawings and project specifications
02-2.3 Verification of Earthing and Bonding of For Instrumentation & H W N/A
Access Control Equipment Control Systems As per IEC 61000 (EMC) Electromagnetic
Cable schedule, Compatibility
02-2.4 Verification Of IT/Telecommunication Manufacturer’s
H W N/A
Equipment QCF_023 Complies with Project specification/
Instructions Manufacturer’s instructions
02-2.5 Verification of IT/Telecommunication H W N/A
Panel
02-2.6 Verify Aboveground Installation Works Method Statement For QCF_027 BS 7671 H W N/A
Instrumentation& Project specification
Control Systems
02-2.7 Testing of CAT 6A Cable Method Statement For QCF_027 As per BS 6701 H W N/A
Instrumentation& Complies with Project specification / cable
Control Systems schedule manufacturer’s published data
02-2.8 Check Continuity Method Statement For QCF_027 BS 7671 H W N/A
Instrumentation& Project specification
Control Systems
INSPECTION
QC FORM TO LEVEL
ITP PHASE ACCEPTANCE CRITERIA (CODES/STANDARDS AND
DESCRIPTION OF ACTIVITY REFERENCE PROCEDURE VERIFY REMARK
NO. SPECIFICATION)
COMPLIANCE CTR CPY TPI
02- 1 PRELIMINARY
02-3 CCTV SYSTEM INSTALLATION
02-3.1 Material Verification & Approval PO/ Material QCF_016 MAR H W N/A
Receiving Inspection Spec.,General As per Specified in Applicable Specification and
- Raw Material Ass’y Drawing Installation Drawing
- No Damage, type, specification, etc.
02-3.2 CCTV Installation Approved Vendor H W N/A
Drawing
- Check name plate, tag No,
Approved drawing Complies with installation details and layout
- Check the cameras are mounted on QCF_090 drawings and project specifications
correct location as per drawing. Project Specification
INSPECTION
QC FORM TO LEVEL
ITP PHASE ACCEPTANCE CRITERIA (CODES/STANDARDS AND
DESCRIPTION OF ACTIVITY REFERENCE PROCEDURE VERIFY REMARK
NO. SPECIFICATION)
COMPLIANCE CTR CPY TPI
02- 1 PRELIMINARY
02-4 FINAL INSPECTION/HANDOVER
02-4.1 Final Inspection and punch List Method Statement For QCF_025 Punch List Procdure H H N/A
Instrumentation&
Control Systems
02-4.2 Review, Close out punch List, Compile QC Method Statement For QCF_025 &026 BS 7671 H H N/A
Records and Submit Circuit Folder Instrumentation& Project specification
Control Systems
02-4.3 Sign Off IT/Telecommunication Circuit Method Statement For QCF_026 Project Quality Plan H H N/A
Folder Review/Approval Page by Instrumentation&
Contractor and Company. Control Systems
Inspection points legend: FI=Full Inspection H= Hold Point W=Witness Point S=Surveillance Point R= Review Point NA= Not Applicable
03-3.3 Sign Off Project Quality Plan QCF_026 Project Quality Plan H H N/A
IT/Telecommunication
Circuit Folder
Review/Approval Page by
Contractor and Company.
Inspection points legend: FI=Full Inspection H= Hold Point W=Witness Point S=Surveillance Point R= Review Point NA= Not Applicable
7.4 ITP. 004- PAGA System AND DATA SYSTEM AND ITS ANCILLARIES
QC FORM TO ACCEPTANCE CRITERIA INSPECTION LEVEL
REFERENCE
ITP PHASE NO.. DESCRIPTION OF ACTIVITY VERIFY (CODES/STANDARDS AND REMARK
PROCEDURE CTR CPY TPI
COMPLIANCE SPECIFICATION)
04-1 PRELIMINARY
04-1.1 Inspection & Approval of Material Submittal MTCC-WP-IT-05 MAR FI W/R N/A
material
04-1.2 Check drawings is approved and AFC DRAWINGS MDR AFC status H R N/A Drawing
latest revision Register
04-1.3 Check method statement is AFC Drawings Method AFC status H R N/A
approved and latest revision Statement
04-2 PAGA SYSTEM AND DATA INSTALLATION
04-2.1 Verify the installation of PAGA & Method Statement For QCF_023 H W N/A
Data Equipment Instrumentation& DEP 33.64.10.33 (EMC)
Control Systems
Installation
04-2.2 Verification of PAGA System and AFC DRAWING QCF_023 Project Specification H W N/A
data Equipment positioning
04-2.3 Verification of Method Statement For QCF_023 Project Specification H W N/A
IT/Telecommunication Panel Instrumentation&
Control Systems
04-2.4 Verification of Conduit & Cable AFC DRAWING QCF_028 PROJECT SPECIFICATION H W N/A
tray
04-2.5 Verify the connection of PAGA Method Statement For QCF_027 BS 7671 H W N/A
and data equipment Instrumentation& Project Specification
Control Systems
04-2.6 Testing of Cable Method Statement For QCF_027 BS 6701 H W N/A
Instrumentation& Project Specification
04-3.4 Review, Close out punch List, Project Quality Plan QCF_025 & 026 BS 7671 H H N/A
Compile QC Records and Submit Project Specification
Circuit Folder
04-3.5 Sign Off IT/Telecommunication Project Quality Plan QCF_028 Project Quality Plan H S N/A
Circuit Folder Review/Approval
Page by Contractor and
Company.
Inspection points legend: F I=Full Inspection H= Hold Point W=Witness Point S=Surveillance Point R= Review Point NA= Not Applicable
7.5 ITP. 005- PROCESS INSTRUMENTATION (PRIMARY FLOW ELEMENTS, INLINE FLOW INSTRUMENTS, PRESSURE GAUGES/DRAFT GAUGES)
Orifice plate,
nozzle, flow orific
not yet installed
05-1.3 Method Statement For QCF_074 Vendor Doc. Orifice plate,
Final Inspection Instrumentation& Control Project Specifications, Method H H N/A nozzle, flow orifice
Systems Statement For Instrumentation& to be insereted in
Control Systems flanges holder
05-2 IN LINE FLOW INSTRUMENT
05-2.1 Magnetic, vortex, coriolis, Method Statement For Vendor Doc.
rotameter, ultrasonic etc - Instrumentation& Control QCF_070 Project Specifications, Method H W N/A
Systems, Vendor data Statement For Instrumentation&
Installation inspection Control Systems
7.10 ITP. 010 - E/P TRANSDUCERS, CONVERTERS, SOV (WITHOUT PNEUMATIC CONNECTION)
Check of
calibration
Project Specification certificate for
Calibration Check Vendor Doc./Data
010-1.1 Vendor Doc. H H N/A calibration
Project Specifications, QCF_084 laboratory
facilities/
instruments
Vendor Doc.
Project Specifications, Vendor Doc.
Method Statement For Project Specifications, Method
010-1.2 Tightness test H H N/A
Instrumentation& Control QCF_067 Statement For Instrumentation&
Systems Control Systems
Project Specification
Installation inspection Vendor Doc./Data
010-1.3 Vendor Doc. Manufacturers H H N/A
Project Specifications, QCF_070
Prescription
Vendor Doc.
Project Specifications, Vendor Doc.
Method Statement For Project Specifications, Method
010-1.4 I/O check H H N/A
Instrumentation& Control QCF_078 Statement For Instrumentation&
Systems Control Systems
Inspection points legend: FI=Full Inspection H= Hold Point W=Witness Point S=Surveillance Point R= Review Point NA= Not Applicable
Check on
Visual inspection and Project Specification
Vendor Doc./Data documents and test
012-1.1 dimensional check QCF_068 Vendor Doc. H H N/A
Project Specifications, equipment
7.13 ITP. 013 – SAFETY AND RELIEF VALVES AND RUPTURE DISK
ITP QC FORM TO ACCEPTANCE CRITERIA INSPECTION LEVEL
DESCRIPTION OF REFERENCE PROCEDURE/
PHASE VERIFY (CODES/STANDARDS AND REMARK
ACTIVITY CONTROLLING DOCUMENTS CTR CPY TPI
NO. COMPLIANCE SPECIFICATION)
013 -1 SAFETY AND RELIEF VALVES AND RUPTURE DISK
To be
performed
before
Project Specification installation in
Vendor Doc./Data
013-1.1 Calibration check Vendor Doc. H H N/A calibration
Project Specifications, QCF_073
laboratory
facilities/
instrument
Vendor Doc.
Vendor Doc.
Installation Project Specifications, Method
Project Specifications, Method Statement
013-1.2 inspection QCF_070 Statement For Instrumentation& Control H H N/A
For Instrumentation& Control Systems
Systems
Vendor Doc.
Field calibration Method Statement For Instrumentation& Project Specifications, Method
013-1.3 Control Systems QCF_073 Statement For Instrumentation& Control H W N/A
Systems
Vendor Doc.
013-1.4 Method Statement For Instrumentation& QCF_073 Project Specifications, Method
Final inspection H H N/A
Control Systems Statement For Instrumentation& Control
Systems
Inspection points legend: FI=Full Inspection H= Hold Point W=Witness Point S=Surveillance Point R= Review Point NA= Not Applicable
Project Specification
Vendor Doc./Data
014-1.1 Installation inspection QCF_070 Vendor Doc. H H N/A
Project Specifications,
Vendor Doc.
Project Specifications,
Method Statement For Vendor Doc.
014-1.2 I/O check Instrumentation& Control QCF_078 Project Specifications, Method Statement H W N/A
Systems For Instrumentation& Control Systems
Inspection points legend: FI=Full Inspection H= Hold Point W=Witness Point S=Surveillance Point R= Review Point NA= Not Applicable
7.15 ITP. 015 – INSTRUMENT CABLES, TRACE HEATING CABLES AND EARTHING NETWORK (CONTROL ROOM)
INSPECTION
QC FORM TO ACCEPTANCE CRITERIA
ITP PHASE REFERENCE LEVEL
DESCRIPTION OF ACTIVITY VERIFY (CODES/STANDARDS AND REMARK
NO. PROCEDURE/DOCUMENT
COMPLIANCE SPECIFICATION) CTR CPY TPI
015 -1 INSTRUMENT CABLES, TRACE HEATING CABLES AND EARTHING NETWORK (CONTROL ROOM)
INSTRUMENT CABLES:
For each cable drum
Electrical
before pulling.
insulation/continuity tests: Project Specification
Vendor Doc./Data For each cable from
015-1.1 Vendor Doc. H H N/A
- Visual inspection. Project Specifications, QCF_065 control room to
- Insulation. field.
- Continuity.
INSPECTION
QC FORM TO ACCEPTANCE CRITERIA
ITP PHASE REFERENCE LEVEL
DESCRIPTION OF ACTIVITY VERIFY (CODES/STANDARDS AND REMARK
NO. PROCEDURE/DOCUMENT
COMPLIANCE SPECIFICATION) CTR CPY TPI
10 QCF_030 FIELD INSPECTION OF FIRE AND GAS DETECTION SYSTEM TEST REPORT
30 QCF_080 I-O CHECK REPORT OF DETECTORS (GAS, SMOKE, HEAT, FLAME, FIRE)
3. PULLED LENGTH
QCF_021
This document is ZEROCK’s property, and cannot be used by others for any purpose, without prior written consent
NOTE: Test voltage shall be applied across functional insulation between core to be tested and screen, remaining cores, armouring, etc.
All bonded together for multi‐core control cables record lowest reading only.
5. REMARK/REMEDIAL ACTIONS REQUIRED
Sign
Date
APPROVALS:
ThisdocumentisZEROCK’sproperty,andcannotbeusedbyothersforanypurpose,withoutpriorwrittenconsent
This document is property of Eni Congo SA.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Company Document ID Contractor Document ID Sheet of Sheets
4 INSPECTIONCOMPLETED/ACCEPTED
Sign
QCF_023
Date
LOCATION OF INSPECTION: PO. NO.: SUPPLIER NAME: SHIPPING DOC NO.: PAGE:
DIMENSION QUANTITY
HEAT CERTIFICATE/
POIT MARKC QTY NCR/
S/ ITEM SPEC/ /LOT DOCUMENTN
EMN ODE/ DIA(ø) SCH/ INPSECTION RESULT OBSNO. REMARKS
N DESCRIPTION GRADE REC' PACKING / O.
O TAG / THK P.O. (If Any)
VED LIST BATC
NO LENGT (mm)
H(m) HNO
NOTES: INSPECTIONNOTIFICATIONREFERENCE
RFI No.
ISSUED DATE;
8.10 QCF_030 FIELD INSPECTION OF FIRE AND GAS DETECTION SYSTEM TEST REPORT
8.13 QCF_063 FINAL INSPECTION AND TESTING OF FIBER OPTIC CABLES - CHECKLIST
8.15 QCF_065 ELECTRICAL DRUM CHECK & CONNECTION TESTS OF ALL CABLES
8.30 QCF_080 I-O CHECK REPORT OF DETECTORS (GAS, SMOKE, HEAT, FLAME, FIRE)
8.31 QCF_081 I-O CHECK REPORT OF CONTROL VALVES AND ON-OFF ACTUATORS
TEST SCOPE To verify the installation, integrity, the correct termination and connection of earthing cables to
instruments, junction boxes, main cable trays and equipment.
APPLICABLE DOCUMENTS Functional and Protection Earthing System in Control Room, Secondary Sketches Related to
Local Grounding Connection. Manufacturer Instruction Manual for Instrumentation Systems in
Control Room Relative to Earthing Networks.
TEST METHOD Visual inspection to check conductor, identification and fixing for both protection and
functional networks.
Check the segregation and insulation between the protection earthing network and the
functional earthing network by means of a tester before connection of the two networks toa
common point.
Check the resistance of both protection and functional earthing networks in control room
by means of an ohmmeter. Test shall be performed with the main electrical network
connected to the instrument earthing networks. This test shall be executed by the Electrical
Subcontractor.
Check continuity by means of a tester.
Report any damage, continuity failure and non-conformity with the Project Documentation.
ACCEPTANCE CRITERIA Resistance value toward ground shall be less than 1 for both earthing networks, unless
otherwise indicated in the Project Documentation.
Conformity with Technical Documentation.
Sign
Date
8.36 QCF_090 CCTV SYSTEM TESTING & INSTALLATION CHECKLIST IP CCTV SYSTEMS
APPROVAL
Sign
Date
ACCEPTANCE
DESCRIPTION OF CHECKS REMARK
YES NO N/A
Notes: