Professional Documents
Culture Documents
Qa QC cv2 - 1
Qa QC cv2 - 1
MOHD FAHIM
CARRER OBJECTIVE
TALENTED YOUNG ENGG WITH DEVELOPMENT ORIENTED ATTITUDE GAINED FROM
SURRONDING ENVORMENT WIH HAND ON OPPORTUNITIES AND HAS A STRONG ETHIC
WITH A DESIRE AND COMMITED TO SUCCEED .I AM TO WORK AS A KEY PLAYER IN
CHALANGING PROJECT AND CREATIVE ENVIROMENT WHERE ONES POTENTIAL AND
QUALITIES COUNT.
ADDITIONAL
COURSESASNT NDT
(Level II)
• ET (ELECTROMAGNETIC TESTING)
• IRIS(INTERNAL ROTARY INSPECTION SYSTEM)
• RFET(REMOTE FIELD ELECTRO MAGNETIC TESTING)
• DPT (Dye Penetration Test)
• MPT (Magnetic Particle Test)
• RT (Radiography Test)
• UT (Ultrasonic Test).
• RTFI(RADIOGRAPHIC TESTING FILM INTERPRETATION)
• Review of all applicable documents such as Scope of work, Drawing, Quality plan,
Procedures,Codes and Standard, ITP etc.
• PT, MT, RT, UT, PMI, Hardness & PWHT testing activities monitoring and reports review.
• Punch List Preparation prior to Hydro test, Rectification & verification of various category
punch items after reinstatement, Test Pack Review & Final Approval
• Checked and reviewed Isometric drawings and ISO Index
• Vendor Inspection of Seamless tubes, & Anchor bolts,
• Checked and reviewed Line Schedule NDT summary
• Reviewed check list for Mechanical Clearance report
• Preparing and monitoring of fabrication sequencing as per codes and standards during
fabrication work, is performed in accordance with the approved construction procedure, latest
IFC drawings, specifications and correct materials.
• P & ID Index Loop Marked up & ID
• Inspection of vessel, Heat Exchanger, Column, Fin fan.
• According to the clients Hydro Test will be preferred. .
• Checked & reviewed support erection report
• Clearing the punch list items, construction activities and site modifications advices from Client&
Quality Control department as well Performing Hydro Testing & Pneumatic Testing for process
and utility piping.
• Checked & reviewed hydro and pneumatic test release and acceptance reports
• Checked modification after hydro test
Checked and reviewed orifice flange internal grinding records
• Checked Calibration Certificate /reports of pressure gauges.
• Reviewed line history sheet and flange joint history sheet
• Check WPS, PQR according to section XI
• Check welding fillers, electrodes & material selection from approved drawing
. Knowledge of non destructive testing technique
knowledge of welding technique procedure and inspection
QUALIFICATIONS
• Diploma in Mechanical Engineering passed with First Class D with 75 %from ISC
TAMILNADU
• Intermediate Exam passed from BSEB board & score 60%
• Matriculation Exam passed from BSEB board & score 61%
PERSONAL DETAILS
Father’s Name : Mohd Sagir Ahmad
Nationality : Indian
Sex : Male
Marital Status : Single
Passport Number : W3294078
Language Known : Hindi, English, Urdu
DECLARATION
I hereby declare that the above stated details are true to the best of my Knowledge.
Date: 04/10/2023
Place: BIHAR (MOHD FAHIM)