This document is a picture report from a project to install a UV lamp system in the Wastewater Treatment (WWT) area of SEI Electronic Components (Vietnam), Ltd. The report details the installation of steel pipes, replacing a Residual Current Breaker with Overcurrent protection (RCBO), tightening fittings, and applying thermal markings on 25/11/2023.
This document is a picture report from a project to install a UV lamp system in the Wastewater Treatment (WWT) area of SEI Electronic Components (Vietnam), Ltd. The report details the installation of steel pipes, replacing a Residual Current Breaker with Overcurrent protection (RCBO), tightening fittings, and applying thermal markings on 25/11/2023.
This document is a picture report from a project to install a UV lamp system in the Wastewater Treatment (WWT) area of SEI Electronic Components (Vietnam), Ltd. The report details the installation of steel pipes, replacing a Residual Current Breaker with Overcurrent protection (RCBO), tightening fittings, and applying thermal markings on 25/11/2023.
Project Name SEI Electronic Components (Vietnam), Ltd.
Area/Block WWT AREA Item: INSTALLATION UV LAMP SYSTEM IN WWT AREA Date: 25/11/2023
Confirmed by SEEV: MEDA:
TOOL BOX MEETING INSTALL STEEL PIPE
INSTALL PIPE REPLACE RCBO
PICTURE REPORT Project Name SEI Electronic Components (Vietnam), Ltd. Area/Block WWT AREA Item: INSTALLATION UV LAMP SYSTEM IN WWT AREA Date: 25/11/2023