You are on page 1of 3

Page 1 of 3

(UTC+00:00) Coordinated
Time Zone
Universal Time
Report Date 3/30/23 8:46 AM

Work Definitions Report

Organization TATA INV ORG


Work Method Process Manufacturing
Process Name TEST
Work Definition Name Main
From Item RENAULT
To Item RENAULT
Work Definition As-of Date
From Version 1
To Version 1
Version Start Date
Version End Date
Production Priority 1
Additional Header Details Yes
Count Point Operations Only No
Additional Operation Details Yes
Additional Component Details Yes
Resources Yes
Alternate Resources Yes
Page 2 of 3

Process Name TEST Work Method Process Manufacturing


Batch Quantity 1 UOM Eaa
Work Definition Status Active Inactive On
Work Definition Name Main Work Definition Type Standard
Version 1
Start Date 3/30/23 8:18 AM End Date
Organization TATA INV ORG
Primary Output RENAULT Description RENAULT
Production Priority 1
Costing Priority
Costing Batch Output Size 1

Operation
Operation Sequence 10 Start Date 3/30/23 8:18 AM End Date
Operation Name TATA IN_HOUSE Operation Code TATA_IN_HOUSE Referenced Yes
Operation Description TATA IN_HOUSE Operation Type In-house Work Center ASSEMBLY WORKSHOP
Count Point Yes Automatically Transact No
Additional Manual Material Allow Completions with Under Issues Allow Completions with Open Allow
Issue Exceptions
Lead Time Percent
Outputs
Cost
Output Output Primary Completion Completion Completion Costing
Output Description Quantity UOM Allocation
Sequence Type Output Type Subinventory Locator Priority
Percent
10 RENAULT RENAULT Product Yes 1 Eaa Manual TATA STEEL 100

Operation Resources

Work Units Inverse Available Costing Charge Inactive


Sequence Name Code Basis Usage UOM Principal Scheduled Activity
Center Assigned Usage Units Enabled Type On

ASSEM Depot
BLY RESOURCE
10 RESOURCE_1 Variable 1 1 1 1 Eaa No No No Manual Repair –
WORK 1
SHOP Labor

ASSEM
BLY RESOURCE 1 3 No Manual
20 RESOURCE2 Variable 3 1 Eaa No No
WORK 2
SHOP
Page 3 of 3

You might also like