This document outlines a hydrostatic test procedure for water injection pumps, booster pumps, and filter feed pumps at oil blocks 3 and 4 in Oman. It was prepared by SRK on March 21, 2024 as the first issue of the procedure with job number COM-PW-MR03-0011-001-01-JS1227-ITT. The procedure applies to the design and supply of the pumps by CC Energy Development S.A.L for their Oman branch project.
This document outlines a hydrostatic test procedure for water injection pumps, booster pumps, and filter feed pumps at oil blocks 3 and 4 in Oman. It was prepared by SRK on March 21, 2024 as the first issue of the procedure with job number COM-PW-MR03-0011-001-01-JS1227-ITT. The procedure applies to the design and supply of the pumps by CC Energy Development S.A.L for their Oman branch project.
This document outlines a hydrostatic test procedure for water injection pumps, booster pumps, and filter feed pumps at oil blocks 3 and 4 in Oman. It was prepared by SRK on March 21, 2024 as the first issue of the procedure with job number COM-PW-MR03-0011-001-01-JS1227-ITT. The procedure applies to the design and supply of the pumps by CC Energy Development S.A.L for their Oman branch project.