Name of Group (Sub-Unit)

Information Assessee P.No


Assessee Name

What deliverables were expected and


how it has delivered

Assessment
How you focused in improving or what has
been contributed towards the 4 KPIs
namely Discipline & Statutory Compliance,
Quality , Safety and Productivity

How your performance contributed


positively to the project/organisation

Outstanding contribution towards the


delivery of your role ( innovative ways of
problem solving – new “How’s”,
ownership , flexibility and adaptability in
altered scenarios, etc
The areas for professional development
required in detail.(OFI)

Development Plan
Strengths
Construction Electrical -IM
163452
Manas Jadav
E&I Construction Pellet plant
1. Stacker cum reclaimer, PP- Erection and commissioning completed
2. PP DU#4 Ore circuit- Erection and commissioning completed
3. Commissioning of truck tippler completed
4. Erection & commissioning of Auxiliary bag house, Ball mill 1, Pellet plant completed
Project management & Construction, BF#2
1. Preparation of electrical erection TS, technical discussion with vendors and completion of TER for E&I erection
orders BF#2
2. Maintaining procurement tracker for E&I packages, tracking order status, providing manufacturing clearance as
per site requirement date of material, Raising change orders for validity extension.
3. Preparation of liquidation plan at site for all materials to ensure on time availability of material for BF#2.

1. Obtaining statutory CEI drawing approval for Stacker cum Reclaimer, PP .


2. Engaged with individual manpower of vendors to identify their performance in job quality & productivity and
assigned work as per their strengths.
3. Ensured bill certification of jobs after proper quality compliance as per hold check points list in Stacker cum
reclaimer, Pellet plant.

Ensured charging and trial of entire Ore feeding circuit of Pellet plant consisting of approximately 1.5 KM length of
conveyors with approximately 25 KM of cabling within stipulated time to ensure material feed to RMSB on
13/10/2022.
1. Auxiliary bag house, Pellet plant- Worked within a limited time frame of 3 weeks to complete erection, IO
checking and commissioning of 418 nos of instruments. Worked with multiple gangs on parallel fronts and ensured a
clear instruction flow to each gang which resulted in first time right execution of job thus minimizing IO checking
time.

1. Installation, parameterization of MV VFD

1. Installation of HT switchgear
2. Installation of LT switchgear, Extension of LT switchgear and bus bar coupling
3. Internal scheme check of panels
4. Installation & commissioning of field instruments
5. I/O check of RIO panels
6. Parameterization & programming of intelligent motor controller
7. Illumination design
8. Detail schematic drawing preparation