You are on page 1of 4

A-306, Petunia Building,

Jai Mata Di Complex, Near Kasheli Toll Swapnil Anil Khopkar.


Naka, Kalher, Thane - 421302
E-mail: swapnilmgm@gmail.com
Cell: +91-9833972540

OBJECTIVES

To utilize achieved knowledge and experience and work with the best efforts, skill for
achieving the goals of the organization. Also I want to become a keen strategist with
an expertise in managing an entire operation with focus on profitability and
optimisation of resources.

PROFESSIONAL QUALIFICATION
Year Examination Percentage Institution Board/
University
May-2008 B.E. - Civil 57.58% M.G.M. College of Mumbai
Engineering Engineering &
Technology

PROJECT

Designing Of Post Tensioning Slab In Commercial Buildings

Completed B.E. final year project on ‘Designing Of Post Tensioning Slab In Commercial
Buildings’ under the guidance of ‘BBR (India) Pvt. Ltd.’ It’s a very Advanced & upcoming
technology used in Construction of Long Span Flat Slab of commercial buildings like IT Parks,
Malls where the slabs are Spanning over 8 meters. Post Tensioning Technology provides the
Overall Economy to the Structure with reduction of Heavy Reinforcement & use of high tension
Tendons.

SPECIAL TRAINING: CONCRETE MIX DESIGN

I have completed the special training program by Late Er.A.P.Remedios on ‘Concrete Mix Design’.
About the mix designing of high grade concrete, Rectification of mix on site & shuttering work.
EXPERIENCE: 10 YEARS & 3 MONTH

Worked with ‘BBR (India) Pvt. Ltd.’ as Trainee Engineer For 6 months at their prestigious projects
‘EVEREST AANGAN’, Mahape & at ‘Ravechi IT Park’, Palm Beach road, Navi Mumbai. I learned the
use of the Post Tensioning technology implementing in commercial building successfully.

Total Experience:- 3 YEARS & 2 MONTH


MAN INFRACONSTRUCTION LTD.
1) At Gigaplex IT Park site, Airoli as Jr. Engineer w.e.f. 1st July 2008 to 20th August 2009.
Job Profile & Responsibilities :
1st July 2008 -31st August 2008:
i. Handled site execution work as a Junior Engineer.
1 September 2008 – 20th August 2009: working as ‘Quantity Surveyor’:
st

i. Handled Bar Bending Schedule (BBS) of Two Eight Story buildings individually.
ii. Steel Reconciliation for approx 2700 MT.
iii. Co-ordination with Client for BBS approval & Billing of Contractors on Item Rate.
iv. Shuttering work with the STEN MATERIAL.

2) Now working at DBS School site, Chandivali as a Billing & Planning Engineer
W.e.f. 21st August 2009 to 10th Sept 2011.
Job Profile & Responsibilities :
i. Individually preparing & coordinating with Client for approval of Running Account Bill
(RA) on item rate.
ii. Checking and Certification of BBS & Shuttering Quantity of entire project individually.
iii. Checking and Certification of Contractor Bills.
iv. Preparation of Rate Analysis & Coordination with client for approval of same.
v. Reconciliation of Steel & other site materials consumption on monthly basis.
vi. Prepared Zero Cost Budgeting for entire project & monitoring the same through Rolling
Plan on monthly basis.
vii. Prepared Project planning for City of Joy, Mulund Project with Microsoft Project Planning
(MSP).
viii. Prepared Project Execution Plan (PEP) for Rohan Lifescapes Glory, Lower Parel Project.
Current Employer
Larsen & Toubro Ltd. (Building & Factories Independent Company, ECC division.)
Total Experience:- 7 YEARS & 1 MONTH
At Omkar Alta Montae Project, Malad as a Sr. Engineer Client Billing & Planning
W.e.f. 12th September 2011 to 3rd July 2014.
Job Profile & Responsibilities :
i. Individually preparing & coordinating with Client for approval of Running Account Bill
(RA) on item rate.
ii. Checking and Certification of BBS & Shuttering Quantity of entire project individually.
iii. Preparation of Rate Analysis & Coordination with client for approval of same.
iv. Preparation of ACE (Accepted Cost Estimation) for Entire project & Monitoring through
the JCR (Job Cost Report) on monthly basis.

At OBEROI ESQUIRE PROJECT, Goregaon as ASST. CONSTRUCTION MANAGER Planning &


Billing. W.e.f. 3rd July 2014 to Till date.
Job Profile & Responsibilities :
i. Individually preparing & coordinating with Client for approval of Running Account Bill
(RA) on item rate.
ii. Checking and Certification of BBS & Shuttering Quantity of entire project individually.
iii. Preparation of Rate Analysis & Coordination with client for approval of same.
iv. Preparation of ACE (Accepted Cost Estimation) for Entire project & Monitoring through
the JCR (Job Cost Report) on monthly basis.

Achievements :-
1. Level 1 programme – Advanced Certificate in Project Management programme, from L&T
IPM, Vadodara.
2. Eligible for PMI certification.

COMPUTER KNOWLEDGE
MS office
AutoCAD 2006
Certificate in CAD with ‘A’ Grade issued by MBTB.
Microsoft Project Planning (MSP)
PERSONAL INFORMATION

Name : Swapnil Anil Khopkar


Date of Birth : April 30, 1986
E-mail : swapnilcivil@yahoo.com
Permanent Address : Ashtavinayak Co.Hsg.Soc., Block No.13, 3rd Floor,
Plot No. 40, Shivai Nagar, Thane (W), 400606,
Maharashtra.

Mobile : 9833972540
Passport No. : G2872461
Nationality : Indian
Languages Known : English, Hindi, Marathi, Gujarati
Marital Status : Single
Hobbies : Marshal Arts, Driving

The above mentioned information is true & correct according to my knowledge.

Sd/-
SAKhopkar..
Swapnil Khopkar

You might also like