Maintainance Activitys For Production Deptt. Machinery - Xls - 0
Maintainance Activitys For Production Deptt. Machinery - Xls - 0
Not Done
Not Done
Done
Done
Not Done
Not Done
Done
Done
Done
Not Done
Done
DML
1 Drum 1 Mixing head 2 under maintenance from 12 sept 2021 - Pending Not done.
2 Drum 1 DOP circulation not working and DOP leakages. Not done.
3 Drum 1 Electric panel AC not working switches trip issue when excess heating from Jan 2022. - Pending Done.
4 Drum 1 Polyol temperature out of spec when iso 18.9 deg. polyol observed 27 deg. cause puff leakages. Not done.
5 Drum 1 Dry part electric panel AC not working from Dec. 2021. - Pending Not done.
6 Drum 1 Assy Conveyor & post foaming conveyor sensor need to fix properly. - Pending. Done.
7 Drum 1 HMI display hang issue. Pending Not done.
8 Drum 1 Dry Part control panel main switch need to fix on outside panel. Not done.
9 Drum 2 Polyol temperature control issue. temperature rise above 24 deg. C ( 2 April 2022) When FF production running, Done.
10 Drum 2 We are facing flange puff leakage issue. need to chiller water line & solenoid valve cleaning. - Pending. Done.
11 Drum 2 DOP circulation not working. Incomplete Work
12 Drum 2 Dry Part control panel main switch need to fix on outside panel. Not done.
13 Drum 2 Dry part main control panel lock not properly due to cable connection. Not done.
14 Drum 2 Iso leakage on wet part mixing head line. - Pending. Not done.
15 Drum 2 MTC red alarm continues on.- Pending. Not done.
16 Drum 2 Assy Conveyor & post foaming conveyor sensor need to fix properly. Done.
17 Drum 2 Required C clamp support for conveyor cable tray. Incomplete Work
18 Drum 3 Polyol Mixing head line leakage - Pending. Done
19 Drum 3 Hydraulic oil leakage from Mixing head. Not done.
20 Drum 3 DOP circulation not working. Not done.
21 Drum 3 HMI display hang issue. -Pending Not done.
22 Drum 3 Required Iso polyol line paint & insulation. - Pending Not done.
23 Drum 3 Safety door sensor Required - Pending. Not done.
24 Drum 3 Hydraulic unit fault alarm frequently from last 2 month - Pending.( Pls check hydraulic internal line maybe leakage ) Not done.
25 Drum 3 Pre heating booth required for panel heating. Not done.
26 Drum 3 Dry prat panel not lock due to cable connection inbetween door lock. Not done.
27 Drum 3 Required cable tray for conveyor cable. Incomplete Work
28 Drum 1 ISO motorized filter seal lekage. Not done.
29 Drum 1 Polyol wet part safety sensor by pass Not done.
30 Drum 2 Conveyor light hanging condition need to fix Done.
31 Door Foaming all pneumatic connection need to check and encounter leakage Not done.
32 Door Foaming all pneumatic solenoid valve need to cleaning and proper fix Not done.
33 Door Foaming All electrical panel cleaning and proper wire routing and covering Not done.
34 Door Foaming all Drum fixture MTC hot water line need to flushing and claening Done.
35 Drum 1 Drum-1 Mixing Head calibration Done.
36 Drum 1 Polyol tank Pressure regulator not working from 2 jan. 2023 Not done.
37 All 3 drum mould cleaning & tape pasting on top plate Done.
38 All trollley rework, cleaning & rubber pasting. Done.
39 All drum gear & head track greasing Done.
40 Iso Polyol filter Cleaning Done.
41 Drum 1 & Drum 3 Adapter rubber need to replace Not done.
42 Wet part mezzanine & staircase cleaning & Iso Poly tray cleaning Done.
43 MTC cleaning Done.
44 All mould & drum Allen bolt tightned Done.
45 DOP fillup in mixing head line DOP bowl. Done.
PU Cabinet PM Activity
Sr.No Area Issues Description Photos Responsible Department
CD Side DOP Pack Sytem Stop Not Working. And DOP Filter
3 Wetpart Maintenance
Cleaning(PM)
7 Pre Assembly Buffer Pre Assembly Buffer Sometime Only One Side Cabinet Dilivery. Maintenance
All Diverter Up Dowe And Chain Issue Chake All Diverter and
27 Post Foaming Buffer Maintenance
pm Tham.
31 A Side Fixturs A5 & C5 Fix Draiv Error And Penal Emergency alarm Not Reser Maintenance
42 D side Mixing head Iso line leakage -Pending from last 8 month.
AB Side Drag chain iso line leakages many more place
43 - Corrected.
CD side head lubrication not working from last 4 month
44 - Corrected .
Iso Motorized filter seal break iso leakages from last 9 month
45 - Corrected
46 HMI display hang issue. Pending
47 All ABCD side moving shuttle aluminum bar broken. - Pending.
48 C side voltage display not working. Pending
Mould temperature display & actual temperature variation
49 display not working. - Pending
50 D side emergency gate push button not working. Pending.
51 D2 Mould water pipe broken. pending.
52 Safety air duct valve broken. Pending.
53 A side hydraulic pipe leakage. Pending.
54 C4 & D2 hot air blower not working. Pending.
Both tilter hydraulic cooling system notworking & radiator fan
55 off. Pending.
56 AB side divertor run with 2 chains out of 3 nos - pending.
Remark
Not Done
Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Done
Not Done
Done
Done
Done
Done
Done
Not Done
Done
Not Done
Done
Not Done
Done
Done
Not Done
Not Done
Done
Done
Done
Not Done
Done
Done
Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Not Done
Done