Professional Documents
Culture Documents
CRIC Bolts and Swage Nut Inpsection-1
CRIC Bolts and Swage Nut Inpsection-1
SWAGE NUTS
2. Feed the borescope 360 degrees down and around the inspection cavity see Fig. 1-3 below,
until the borescope entry is visible. Make sure all 36 of the CRIC Bolts/Swage Nuts will be
visible when withdrawing the borescope.
Fig. 5. Example Shows Swage Nut Present but no CRIC Bolt Visible
No Threads Visible 2 Threads Visible
4. Record the results in the appendix, then provide a copy of the results and copies of all
photos and videos to …
5. Follow the instructions in NMSB72-AK269 for close-up and to return the engine to a
serviceable condition
Date of Inspection
ESN
Engine TSN
Engine CSN
Swage Nut CRIC Bolt
CRIC Bolt Present Present Threads
Location (Y/N) (Y/N) Visible
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36