PROJECT CONTROL PLAN
ISSUED BY : Project Control Superintendent Rev. 0
DOCUMENT CONTROL &
DOC NO. : NK-WUR-PEP-PCP-002
Area / Dept : PHR All Area - OU NUMBERING PROCEDURE Page 3 of 15
LEMBAR REVISON
DOKUMEN REF. : NK-WUR-PEP-PCP-002
0
PROJECT CONTROL PLAN
ISSUED BY : Project Control Superintendent Rev. 0
DOCUMENT CONTROL &
DOC NO. : NK-WUR-PEP-PCP-002
Area / Dept : PHR All Area - OU NUMBERING PROCEDURE Page 4 of 15
TITLE
Document control & numbering procedure
PURPOSE
This procedure is established to control documents utilization and movement in order that:
a) The pertinent issues of appropriate documents are available at all locations where operations
essential to the effective functioning of the quality system are performed.
b) Invalid and / or obsolete documents are promptly removed from all points of issue or use.
c) Any obsolete documents retained for history shall suitably be identified by Stamp i.e.
“SUPERSEDED-FOR INFORMATION ONLY“.
DEFINITION
Static Document
Static documents are documents that officially published for one time based and can be used
many times without requirement to be logged. Any change or revision to its content will be
indicated by revision status.
Dynamic Document
Dynamic documents are documents that officially published for one time but will be used many
times where the uses of them need to be logged.
Correspondence Documents
Correspondence documents are documents that related to any internal and external
correspondence surround PT. Nindya Karya Member Of Danareksa
PROJECT CONTROL PLAN
ISSUED BY : Project Control Superintendent Rev. 0
DOCUMENT CONTROL &
DOC NO. : NK-WUR-PEP-PCP-002
Area / Dept : PHR All Area - OU NUMBERING PROCEDURE Page 5 of 15
SCOPE
This procedure covers the control of following documents:
DOCUMENTATION RESPONSIBILITIES
Corporate Documentation
At corporate level, each department will be fully responsible for its document controlling and
monitoring
Project Documentation
At project level, all document filing and archiving shall be maintained by the document control
team. Respective team will only kept document with process that still on progress. Once the
document is completed and ready to be filed, it shall be submitted to document control team.
For classified document type can be documented at respective team after approval from
project Manager
Below is the minimum document that shall be kept from respective department at one project
Construction document
Minimum list to be documented:
QA/QC document
Minimum list to be documented:
HES document
Minimum list to be documented:
Finance document
Minimum document to be documented
CEM document
Minimum document to be documented
Such as,
CI = Civil work
EW = Earth work
EL = Electrical work
IN = Instrument work
PG = Piping work
PC = Project Control
FN = Finance
00 = No sub topic
Example:
Note : 003 means that clearing grubbing is on the third sequence from earth work
procedure
Note : 002 means that weekly reporting procedure is on the second sequence from project
reporting procedure
PROJECT CONTROL PLAN
ISSUED BY : Project Control Superintendent Rev. 0
DOCUMENT CONTROL &
DOC NO. : NK-WUR-PEP-PCP-002
Area / Dept : PHR All Area - OU NUMBERING PROCEDURE Page 10 of 15
Pattern:
F = F added with two numeric digit (Form number in case in one procedure there are more than
one form developed
Example:
1. Construction Report for Earth Work Procedure, sub procedure of clearing grubbing:
WUR-CS-SOP-EW-003-F02-0133
The second forms in the third earthwork procedures (clearing & grubbing) and has been used
for 133 times
Official Letter
Log & Documentation
• All official letter from WUR B Project shall only be signed by Project Manager or the authorize
DOA.
PROJECT CONTROL PLAN
ISSUED BY : Project Control Superintendent Rev. 0
DOCUMENT CONTROL &
DOC NO. : NK-WUR-PEP-PCP-002
Area / Dept : PHR All Area - OU NUMBERING PROCEDURE Page 11 of 15
• HRD team shall responsible to maintain the log and documentation of each letter issued from
the project include the letter to the project management team
• PIMS will also be utilized to maintain the letter documentation
Numbering Patter
For official letter, the numbering will use below pattern
ID Num Year
A = Project ID; i.e WUR, MFU, etc. For corporate just put RDP
F= Month Year
Example:
Other Documents
Certificate
WUR - Subject - Mo.Yr - Log.Num
Acceptance Letter
WUR - Vendor - Mo.Yr - Log.Num
Code
Employment Agreement
WUR - KKWT Mo.Yr - Log.Num
Invoice Letter
WUR - INV - Mo.Yr - Log.Num
Retention Letter
WUR - RTN - Mo.Yr - Log.Num
Document Status
Revision Status
Revision status is status that show the sequence of document revision started from 0, 1, 2, and
so.
MASTER LIST
The document control team shall prepare and obtain master list of applicable documents &
revision status, and shall be issued for information to all concern.
CONTROLLED COPY:
Documents issued to internal, customers or third party for reference which do not require up
dating
APPROVAL
All procedures document shall be approved by Project manager or the respective PMT.
DISTRIBUTION
The document control shall responsible for maintaining transmittal sheet and Master List of project
document. All transmittal shall be traceable.
OBSOLETE DOCUMENTS
It is the responsibility of the recipient to destroy the obsolete documents or return it to the document
control team
If documents are to be kept for history / information they must be identified by “SUPERSEDED – FOR
INFORMATION ONLY “stamp by the holder or document control team. This shall be clearly studied in
the document master list whether the document is superseded completely or superseded-for
information only.
DATA CONTROL
a) When any controlled documents are stored in hard disk/diskette, they must be identified.
b) Password shall be used by the holder and access for read only or read & edit shall be
determined.
c) For design software used in Codes Construction if applicable, these must be verified upon
purchase and upon revision /addenda to Code by manual method.
d) If there is difference between hard copy / manual method and software / store data, the hard
copy shall take precedence.
PROJECT CONTROL PLAN
ISSUED BY : Project Control Superintendent Rev. 0
DOCUMENT CONTROL &
DOC NO. : NK-WUR-PEP-PCP-002
Area / Dept : PHR All Area - OU NUMBERING PROCEDURE Page 15 of 15
ATTACHMENT
Transmittal Form WUR-PC-PEP-001-F01
halaman 1 dari 1
PEKERJAAN : Proyek SMO Construction Service Work Unit Rate Earthwork (WUR 3)
LOKASI : Duri dan Minas Provinsi Riau
NO. KONTRAK : SPHR00362A
KONTRAKTOR : PT. NINDYA KARYA
10
11