NO AREA/MACHINE ACTIVITY TARGET DATE ACTUAL DATE RESPONSIBILITY MATERIAL REQUIRED BEFORE CORRECTION AFTER CORRECTION REMARK
1 STORE & WAREHOUSE Cover front side area of warehoose 12/31/2021 Mr. Vivek / Mr. Rohit As per Mr. Rehani Instructions
8 DC 200 T Water inlet hose pipe need to be changed 12/31/2021 Mr. Vivek / Mr. Rohit Inlet hose
SLIT RUBBER CUTTING Procedure for marking on Gasket for cutting need to be
12 12/31/2021 Mr. Vivek / Mr. Rohit
MACHINE change .
SLIT RUBBER CUTTING Gasket holding chuck need to be change from plywood
13 to Metalic Disc . 12/31/2021 Mr. Vivek / Mr. Rohit Metalic Disc
MACHINE
Need to drill the hole for pass the air hose for DM water
21 DM WATER PLANT 12/31/2021 Mr. Vivek / Mr. Rohit Drilling Machine
plant.
22 CHILLER Need to provide roof for chillers . 12/31/2021 Mr. Vivek / Mr. Rohit Keder roof and Fastner
23 COOLING TOWER Need to change the locking plate for rust protection . 12/31/2021 Mr. Vivek / Mr. Rohit MS powder coated
24 PLANT Need to plant trees in boundary wall's of the plant . 12/31/2021 Mr. Vivek / Mr. Rohit Trees
26 PLANT Procedures, Work instructions, SOP, Formats 12/31/2021 Mr. Praveen / Mr. Sumanta
28
29
30
31
32
33
34
35
36