Professional Documents
Culture Documents
21 – Turbocharging/supercharging
1 Turbocharger
Note
cardiagn.com
♦ Fill turbocharger with engine oil at oil supply line connection.
♦ After installing the turbocharger, run engine for about 1 minute
at idling speed and do not rev up immediately to ensure that
the turbocharger is fully primed with oil.
Fitting hose connections with plug-in connectors ⇒ page 242 AG. Volkswagen AG d
agen oes
olksw not
yV gu
Assembly overview - turbocharger ⇒ page 243 . ised b ara
nte
or eo
h
Removing and installing turbocharger ⇒ page 247 . aut ra
c
ss
Checking turbocharger vacuum unit ⇒ page 255 .
ce
le
un
pt
an
d
itte
y li
rm
ab
pe
ility
Removing and installing vacuum unit for turbocharger
ot
⇒ page 256 .
wit
, is n
h re
hole
spec
1.1 Fitting hose connections with plug-in
es, in part or in w
t to the co
connectors
Caution rrectness of i
l purpos
a
com
tion in
Removing:
r
te o
thi
s
iva
en
ng
t.
Installing
yi Co
Cop py
ht. rig
– If renewed, place seal in groove of charge air hose. Make sure rig ht
py by
that the seal is correctly seated in the groove all round the co Vo
by lksw
cted
complete circumference and that it is not twisted.
agen
Prote AG.
ce
e
air hose again.
nl
pt
du
an
itte
y li
– Check if plug-in connector seats correctly and is properly en‐
erm
ab
gaged by pulling hose.
ility
ot p
wit
, is n
h re
hole
spec
es, in part or in w
t to the co
rrectness of i
l purpos
nf
ercia
orm
m
atio
om
n in
1.2 Rules for cleanliness
or c
cardiagn.com
thi
te
sd
a
o
r
rp
cu
following “5 rules” for cleanliness:
o
m
f
en
ng
t.
yi
♦ Thoroughly clean all unions and surrounding areas before dis‐
Co
op py
connecting.
. C rig
ht ht
rig by
py Vo
♦ Place removed parts on a clean surface and cover. Use only
co lksw
by
cted agen
lint-free cloths. Prote AG.
1.3.1 Part I
1. Turbocharger 243
Eos 2006 ➤ , Golf 2004 ➤ , Passat 2006 ➤
4-cylinder injection engine (2.0 l engine, turbocharger) - Edition 08.2014
1 - Gasket
❑ Renew
2 - 20 Nm
❑ Renew
❑ Coat studs of exhaust
manifold with high-tem‐
perature paste.
❑ High-temperature paste
⇒ Electronic Parts
Catalogue (ETKA) .
3 - 35 Nm
4 - Seal
❑ Renew
5 - 9 Nm
6 - 23 Nm
❑ On coolant return line
only fitted with two re‐
tainers
cardiagn.com
7 - Coolant return line
❑ Gradual introduction of
coolant return lines with
one retainer
Volkswagen AG
8 - Turbocharger agen
AG. does
olksw not
❑ Removing and installing
ed
by
V gu
ara
⇒ page 247 . ho
ris nte
eo
t
au ra
9 - Bracket ss c
ce
e
nl
10 - 30 Nm
pt
du
an
itte
y li
ab
perature paste
ility
ot p
wit
❑ High-temperature paste
, is n
h re
⇒ Electronic Parts
hole
Catalogue (ETKA) .
spec
es, in part or in w
t to the co
11 - 30 Nm
❑ Coat bolt with high-temperature paste
❑ High-temperature paste ⇒ Electronic Parts Catalogue (ETKA) .
rrectness of i
12 - Bracket
l purpos
13 - 23 Nm
nform
ercia
14 - 30 Nm
m
ion
❑ Renew
c
in t
or
his
e
do
priv
en
ng
t.
15 - Clamping rail
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.
1.3.2 Part II
1 - Seal
❑ Renew
2 - 30 Nm
3 - Oil supply line
4 - Turbocharger
❑ Removing and installing
⇒ page 247 .
5 - 9 Nm
6 - 30 Nm
7 - Seal
❑ Renew
8 - 35 Nm
9 - Seal
cardiagn.com
❑ Renew
10 - Coolant supply line
11 - 23 Nm
12 - 35 Nm
13 - 9 Nm wage
n AG. Volkswagen AG do
es n
olks ot g
14 - Seal byV ua
d ran
ir se tee
❑ Renew utho
or
a ac
ss
15 - Gasket
ce
le
un
pt
❑ Renew
an
d
itte
y li
erm
ab
ility
ot p
17 - 9 Nm
wit
is n
h re
ole,
18 - Gasket
spec
urposes, in part or in wh
❑ Renew t to the co
rrectness o
cial p
f inform
mer
atio
om
n
c
i
or
n thi
te
sd
iva
o
pr
cum
r
fo
en
ng
t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.
1. Turbocharger 245
Eos 2006 ➤ , Golf 2004 ➤ , Passat 2006 ➤
4-cylinder injection engine (2.0 l engine, turbocharger) - Edition 08.2014
1 - Turbocharger
❑ Removing and installing
⇒ page 247 .
2 - Gasket
❑ Renew
3 - 9 Nm
4 - Crankcase breather line
5 - Heat shield
6 - Connecting hose
7 - Vacuum unit
❑ Removing and installing
⇒ page 256 .
❑ Adjusting ⇒ page 256 .
8 - Nozzle
cardiagn.com
AG. Volkswagen AG d
agen oes
9 - Seal Volksw not
gu
by ara
❑ Renew rise
d
nte
tho eo
u
10 - Hose ss a ra
c
ce
e
11 - Hose
nl
pt
du
an
itte
y li
12 - 3 Nm
erm
ab
ility
ot p
wit
, is n
h re
hole
14 - 8 Nm
spec
es, in part or in w
t to the co
15 - Seal
16 - Connection rrectness of i
17 - Securing clip
l purpos
18 - 7 Nm
19 - Hose
nform
ercia
20 - 7 Nm
m
at
om
io
21 - Bracket
n
c
in t
or
his
e
22 - 7 Nm
at
do
priv
en
g
t.
yi Co
Cop py
t.
24 - Seal
rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.
ce
e
nl
pt
du
an
itte
y li
erm
ab
ility
ot p
wit
, is n
h re
1.4 Removing and installing turbocharger
hole
spec
es, in part or in w
t to the co
♦ Hose clip pliers - VAS 6499-
rrectness of i
l purpos
cardiagn.com
nform
mercia
at
om
ion
c
in t
or
his
ate
do
priv
cum
for
en
ng
t.
yi Co
Cop py
♦ Tensioning strap - T10038- ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.
Caution
1. Turbocharger 247
Eos 2006 ➤ , Golf 2004 ➤ , Passat 2006 ➤
4-cylinder injection engine (2.0 l engine, turbocharger) - Edition 08.2014
Removing:
– Remove engine cover/air filter ⇒ page 271 and remove intake
hose ⇒ Item 11 (page 271) from turbocharger.
– Drain coolant ⇒ page 125 .
– Remove right front part of wheel housing liner.
cardiagn.com
– Unscrew bolts -arrows- and remove charge air pipe.
n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss
ce
e
nl
pt
du
an
itte
y li
erm
ab
ility
ot p
wit
, is n
h re
hole
spec
es, in part or in w
t to the co
nf
ercia
orm
m
atio
om
n in
or c
thi
te
sd
iva
o
r
rp
cu
o
m
f
en
ng
t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.
– Pull connectors off ignition coils and lay wiring harness to side.
AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c
ce
e
cardiagn.com
nl
pt
du
an
itte
y li
erm
ab
ility
ot p
wit
, is n
h re
hole
spec
– Disconnect coolant line to coolant expansion tank -arrow-.
es, in part or in w
t to the co
rrectness of i
l purpos
nform
mercia
at
om
ion
c
in t
or
his
ate
do
priv
en
ng
t.
– Disconnect coolant line -3-.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.
1. Turbocharger 249
Eos 2006 ➤ , Golf 2004 ➤ , Passat 2006 ➤
4-cylinder injection engine (2.0 l engine, turbocharger) - Edition 08.2014
cardiagn.com
n AG. Volkswagen AG do
lkswage es n
o ot g
– Unbolt crankcase breather line with heat shield
by V from turbo‐ ua
ed ran
charger -1-. horis tee
ut or
a ac
– Disconnect crankcase breather line
ss from cylinder head cover
-2- and remove. ce
le
un
pt
an
d
itte
h re
ole,
spec
urposes, in part or in wh
t to the co
rrectne
– Remove the two upper securing nuts for front exhaust pipe/
turbocharger.
ss o
cial p
f inform
mer
atio
om
n
c
i
or
n thi
te
sd
iva
o
pr
cum
r
fo
en
ng
t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.
ce
e
Rep. gr. 40 ; Removing and installing drive shafts .
nl
pt
du
an
itte
y li
erm
ab
ility
ot p
wit
, is n
h re
hole
spec
es, in part or in w
t to the co
rrectness of i
– Remove the two lower securing nuts for front exhaust pipe/
l purpos
turbocharger.
nform
mercia
at
om
ion
c
in t
or
his
ate
do
riv
cardiagn.com
p
cum
for
en
ng
t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
– Unbolt bracket for exhaust system -arrows-. Prote AG.
Note
1. Turbocharger 251
Eos 2006 ➤ , Golf 2004 ➤ , Passat 2006 ➤
4-cylinder injection engine (2.0 l engine, turbocharger) - Edition 08.2014
– Unbolt oil supply line and coolant supply line from turbocharg‐
er -arrows-.
AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c
ce
e
nl
pt
– Remove oil return line -arrows- at turbocharger.
du
an
itte
y li
erm
ab
ility
ot p
wit
, is n
h re
hole
spec
es, in part or in w
t to the co
cardiagn.com
rrectness of i
l purpos
nform
ercia
– Remove bolts -1- and -2- and remove support for turbocharg‐
er.
m
at
om
ion
c
in t
or
Note
his
ate
do
priv
cum
en
g
t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.
ce
le
un
pt
♦ Bolt -1- is only fitted on coolant pipes with two retainers.
an
d
itte
y li
erm
ab
cardiagn.com
ility
ot p
wit
is n
h re
ole,
spec
urposes, in part or in wh
t to the co
rrectness o
cial p
f inform
mer
atio
om
n
c
i
or
n thi
te
sd
iva
o
pr
cum
r
fo
en
ng
t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.
1. Turbocharger 253
Eos 2006 ➤ , Golf 2004 ➤ , Passat 2006 ➤
4-cylinder injection engine (2.0 l engine, turbocharger) - Edition 08.2014
ce
e
nl
pt
du
an
Caution
itte
y li
erm
ab
ility
ot p
wit
destroyed compressor impeller, it is not only sufficient to renew
, is n
h re
the turbocharger. To prevent this from causing further damage,
hole
spec
perform the following repairs:
es, in part or in w
t to the co
♦ Check air filter housing, air filter element and intake hoses
for soiling.
♦ Check complete charged air routing and charge air cooler
rrectness of i
for foreign objects.
l purpos
If foreign objects are found in the charge air system, the charg‐
ed air routing must be cleaned and the charge air cooler must
nf
ercia
be renewed, if necessary.
orm
m
atio
m
cardiagn.com
o
n in
c
thi
e
sd
iva
o
r
rp
cu
♦ Fitting hose connections with plug-in connectors ⇒ page 242
o
m
f
en
ng
t.
♦ Renew seals, gaskets and self-locking nuts.
yi Co
Cop py
ht. rig
♦ Fill turbocharger with engine oil at oil supply line connection. rig ht
py by
co Vo
by lksw
♦ The coolant return line ⇒ Item 7 (page 244) must be installed cted agen
Prote AG.
together with the turbocharger.
♦ Hose connections and hoses for charge air system must be
free of oil and grease before assembly. The oil seals and seal‐
ing surfaces must be oiled lightly only for plug-in connector
⇒ page 242 .
♦ Secure all hose connections with the correct type of hose clips
(same as original equipment) ⇒ EKTA (Electronic Parts Cata‐
logue) .
♦ After installing turbocharger, run engine for about 1 minute at
idling speed to ensure that oil is supplied to turbocharger.
Specified torques ⇒ page 243 .
Component Nm
Pendulum support to gearbox ⇒ page 13
Exhaust manifold/turbocharger to cylinder 201)
head
Oil supply line to turbocharger 30
Oil return line to turbocharger 9
Coolant supply line to turbocharger 35
Turbocharger bracket to cylinder block 302)
Turbocharger bracket to turbocharger 302)
Air intake pipe (right side) to sump 10
1) Renew nuts.
2)Use high-temperature paste ⇒ ETKA (Electronic Parts Cata‐
logue) .
Test prerequisite:
n AG. Volkswagen AG do
wage es n
♦ Hose from turbocharger via charge pressure control solenoid yV
olks ot g
ua
valve - N75- to vacuum unit must have through-flow (not ir se
d b ran
tee
blocked). o
cardiagn.com
th or
au ac
s
♦ Charge pressure control solenoid valve - N75- OK.
s
ce
e
nl
pt
du
Procedure:
an
itte
y li
erm
ab
– Remove engine cover/air filter ⇒ page 271 .
ility
ot p
wit
– Connect hand-operated vacuum pump - VAS 6213- to vacuum
, is n
h re
unit -arrow-.
hole
spec
es, in part or in w
t to the co
rrectness of i
l purpos
nform
mercia
at
om
ion
c
in t
r
– Move slide ring -1- on hand vacuum pump - VAS 6213- to po‐
o
his
te
do
priv
cum
for
en
ng
Caution
t.
yi Co
Cop py
t. rig
gh ht
The pressure must not exceed 750 mbar! If the pressure is yri
p by
o Vo
exceeded, the vacuum unit can be damaged.
c by lksw
cted agen
Prote AG.
1. Turbocharger 255
Eos 2006 ➤ , Golf 2004 ➤ , Passat 2006 ➤
4-cylinder injection engine (2.0 l engine, turbocharger) - Edition 08.2014
Note
cardiagn.com
h eo
– Slacken lock nut -2-. aut ra
c
ss
– Separate rod from turbocharger -3-.
ce
e
nl
pt
du
an
itte
y li
erm
ab
Installing:
ility
ot p
wit
, is n
h re
hole
spec
es, in part or in w
Component Nm
Vacuum unit to turbocharger 10
nform
mercia
ion
c
in t
or
his
ate
do
priv
cum
for
en
ng
t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.
ce
le
V.A.G 1397A-
un
pt
an
d
itte
y li
rm
ab
pe
ility
♦ Extension, 30 mm - VAS
ot
wit
6341/3-
, is n
h re
hole
spec
es, in part or in w
t to the co
rrectness of i
cardiagn.com
l purpos
nform
mercia
a
com
tion in
r
te o
thi
s
iva
do
r
rp
cum
fo
en
ng
t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.
Note
1. Turbocharger 257
Eos 2006 ➤ , Golf 2004 ➤ , Passat 2006 ➤
4-cylinder injection engine (2.0 l engine, turbocharger) - Edition 08.2014
AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c
ce
le
un
pt
an
d
itte
y li
erm
ab
ility
ot p
wit
is n
h re
ole,
spec
urposes, in part or in wh
– Pre-adjust bypass flap -1- above rod of vacuum unit -arrow-,
so that the bypass flap can just be turned by hand.
t to the co
– Tighten lock nut hand-tight.
rrectness o
cial p
f in
cardiagn.com
form
mer
atio
om
n
c
i
or
n thi
te
sd
iva
o
pr
cum
– Connect up hand-operated vacuum pump - VAS 6213- , tur‐
r
fo
en
ng
– Move slide ring -1- on hand vacuum pump - VAS 6213- to po‐
sition -B- for “pressure”.
– Switch on turbocharger tester - V.A.G 1397A- and set sliding
switch to position II.
ce
le
-arrows-.
un
pt
an
d
itte
– Secure dial gauge - VAS 6341/1- with dial gauge extension,
y li
erm
ab
30 mm - VAS 6341/3- and flat pickup - VAS 6341/4- to uni‐
ility
ot p
versal dial gauge bracket - VW 387- .
wit
is n
h re
– With pressure at 0 bar, set dial gauge - VAS 6341/1- to 1 mm
ole,
spec
preload.
urposes, in part or in wh
t to the co
– Turn dial of dial gauge - VAS 6341/1- to 0.
– Make sure that dial gauge can move freely.
rrectne
– Operate vacuum pump - VAS 6213- until turbocharger tester
- V.A.G 1397A- indicates 350 +/- 5 mbar.
ss
– The dial gauge must indicate between 4.1 mm and 4.3 mm;
o
cial p
f
otherwise, turn rod of vacuum unit until the value is indicated.
inform
mer
atio
om
n
– Repeat adjustment.
c
i
or
n thi
te
sd
iva
o
pr
c
Note
um
r
fo
cardiagn.com
en
ng
t.
yi Co
op
The values in mm refer to the read value (includes 1 mm preten‐ C py
ht. rig
sion). rig ht
py by
co Vo
by lksw
cted agen
Prote
– Vent system via pressure control valve - VAS 6342- so that
AG.
Note
1. Turbocharger 259
Eos 2006 ➤ , Golf 2004 ➤ , Passat 2006 ➤
4-cylinder injection engine (2.0 l engine, turbocharger) - Edition 08.2014
ce
le
un
pt
an
d
itte
cardiagn.com
y li
Note
erm
ab
ility
ot p
wit
is n
h re
ole,
spec
urposes, in part or in wh
1 - 5 Nm
t to the co
2 - Mounting
❑ For charge air cooler.
3 - Charge air cooler rrectness
❑ Removing and installing
o
cial p
⇒ page 262 .
inform
mer
5 - 8 Nm
n
c
i
or
n thi
e
sd
iva
o
pr
t.
yi
nectors ⇒ page 242
Co
Cop py
ht. rig
7 - Charge air pipe
rig ht
py by
co Vo
by lksw
❑ To sound amplifier Prote
cted AG.
agen
ce
le
un
pt
an
d
itte
y li
rm
ab
❑ Fitting hose connections with plug-in connectors ⇒ page 242
pe
ility
ot
wit
, is n
h re
hole
spec
19 - 5 Nm
es, in part or in w
t to the co
2.2 Assembly overview - sound amplifier, Golf
rrectness of i
l purpos
1 - Cover
cardiagn.com
2 - 8 Nm
nform
ercia
a
com
tio
4 - Screen
n in
r
te o
thi
❑ For feed-through in ple‐
s
iva
do
num chamber bulkhead
r
rp
cum
fo
t.
yi Co
op py
6 - Clip t. C rig
gh ht
pyri by
7 - Charge air hose
co Vo
by lksw
cted agen
Prote AG.
8 - 8 Nm
9 - Spacer sleeve
10 - Rubber bush
11 - Sound amplifier
❑ Before removing, re‐
move cover
⇒ Item 1 (page 261) .
12 - Bracket
❑ For sound amplifier
13 - 8 Nm
1 - 5 Nm
2 - Mounting
❑ For charge air cooler.
3 - Charge air cooler
❑ Removing and installing
charge air cooler (Pas‐
sat) ⇒ page 264 .
❑ Removing and installing
charge air cooler, Eos
⇒ page 262 .
4 - Charge air pipe
5 - 8 Nm agen
AG. Volkswagen AG d
oes
olksw not
6 - From turbocharger byV gu
ara
ed
ris nte
o eo
7 - Charge air hose aut
h
ra
ss c
❑ Note installation instruc‐
cardiagn.com
ce
le
un
pt
an
d
itte
y li
8 - To throttle valve module -
erm
ab
J338- .
ility
ot p
wit
is n
h re
ole,
spec
10 - 10 Nm
urposes, in part or in wh
t to the co
11 - 5 Nm
12 - Charge air pressure send‐
er - G31-
rrectne
f in
n
c
i
or
n thi
te
sd
iva
o
pr
cum
r
fo
t.
yi Co
er (Golf, Eos) Cop py
ht. rig
rig ht
py by
Removing: co Vo
by lksw
cted agen
Prote AG.
– Remove noise insulation ⇒ General body repairs, exterior;
Rep. gr. 50 ; Noise insulation .
– Remove bumper cover ⇒ Bumpers; Rep. gr. 63 ; Removing
and installing front bumper cover .
– Drain coolant ⇒ page 125 .
ce
le
– Remove right air hose -arrows-.
un
pt
an
d
itte
y li
– Remove radiator cowl ⇒ page 133 .
rm
ab
pe
ility
– Removing radiator ⇒ page 133 .
ot
wit
, is n
h re
Pipes of condenser are bolted to right-hand side of charge air
hole
spec
cooler. To unscrew securing bolts, proceed as follows:
es, in part or in w
t to the co
rrectness of i
l purpos
nform
mercia
a
com
tion in
r
te o
thi
s
iva
do
r
rp
cum
fo
en
ng
t.
yi Co
cardiagn.com
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.
– Fit the template on the plastic bracket at the front right so that
it rests against the edges at the top and left.
– Mark the intersection on the template -arrow- with a centre
punch.
– Drill a hole into the plastic bracket with a 5-mm drill bit.
– Drill or cut the hole to 16 mm.
Note
G. Volkswagen AG d
The securing bolts of the condenser are difficult to access! wWith
agen
A
oes
olks not
the aid of a second mechanic, lift the charge air cooler by out
V of the gu
ara
radiator mountings. The charge air cooler can now oris be moved
ed nte
»back and forth« to allow access to the securing
au bolts.
th eo
ra
ss c
ce
le
un
pt
an
d
itte
y li
erm
ab
ility
ot p
wit
– Unbolt condenser from charge air cooler -arrows-.
is n
h re
ole,
spec
urposes, in part or in wh
t to the co
Installing:
rrectne
Installation is carried out in the reverse order. When installing,
note the following:
cardiagn.com
ss
♦ Hose connections and hoses for charge air system must be
o
cial p
f
free of oil and grease before assembly. The oil seal and seal‐
inform
ing surface must be oiled lightly only for plug-in connectors
mer
⇒ page 242 .
atio
om
n
c
i
or
n
2.5 Removing and installing charge air cool‐
thi
te
sd
va
er (Passat)
i
o
pr
cum
r
fo
en
ng
t.
Removing: Cop
yi Co
py
t. rig
– Remove noise insulation ⇒ General body repairs, exterior; gh ht
yri by
Rep. gr. 50 ; Noise insulation .
op Vo
by c lksw
cted agen
Prote AG.
– Remove bumper cover ⇒ Bumpers; Rep. gr. 63 ; Removing
and installing front bumper cover .
– Drain coolant ⇒ page 125 .
– Remove right air hose -arrows-.
– Remove radiator cowl ⇒ page 133 .
– Removing radiator ⇒ page 135 .
– Remove air deflector elements on lock carrier ⇒ Body - front;
Rep. gr. 50 ; Assembly overview - air deflector elements on
lock carrier .
Note
AG. Volkswagen AG d
agen oes
cardiagn.com
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c
ce
e
nl
pt
du
an
itte
y li
erm
ab
ility
– Attach condenser to lock carrier using cable ties.
ot p
wit
, is n
h re
hole
spec
Installing:
es, in part or in w
t to the co
Installation is carried out in the reverse order. When installing,
note the following:
♦ Hose connections and hoses for charge air system must be rrectness of i
free of oil and grease before assembly. The oil seal and seal‐
l purpos
at
om
ion
c
in t
or
his
ate
do
priv
cum
for
en
ng
t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.
1 - Vacuum unit
❑ Removing and installing
⇒ page 256 . . Volkswagen AG
gen AG does
❑ Adjusting ⇒ page 256V.olkswa not
gu
y
❑ Check ⇒ page 255 ed b. ara
ris nte
tho eo
2 - Charge pressure
ss
au control ra
c
solenoid valve - N75-
ce
e
nl
pt
du
an
3 - Turbocharger air recircula‐
itte
y li
tion valve - N249-
erm
ab
ility
ot p
4 - Turbocharger
wit
, is n
h re
5 - Brake servo
hole
spec
6 - Non-return valve
es, in part or in w
t to the co
7 - Coolant connection
8 - Vacuum pump
rrectness of i
9 - Non-return valve
l purpos
cardiagn.com
nf
ercia
or
solenoid valve 1 - N80-
m
m
atio
om
n in
or c
sd
iva
o
r
rp
cu
m
f
en
ng
t.
14 - Throttle valve module -
yi Co
op
J338-
C py
t. rig
gh ht
yri by
15 - Pressure regulating valve
op Vo
by c lksw
cted agen
Prote AG.
16 - To activated charcoal filter
17 - Air mass meter - G70-
– Release clip -A- and detach hose -B- from charge air pipe.
– Fit adapter - V.A.G 1687/5- onto charge air hose -A- and turn
adapter through approx. 90° -B-.
Prepare charge air system tester - V.A.G 1687- as follows:
cardiagn.com
– Turn pressure control valve -2- anti-clockwise onto stop.
– Close valves -3- and -4-.
Note
AG. Volkswagen AG d
agen oes
ksw
To turn the pressure control valve by
V -2- the knob must be pulledot gu
ol n
ara
upwards. ris
ed
nte
ho eo
aut ra
ss c
ce
e
nl
pt
du
an
itte
y li
erm
ab
ility
ot p
h re
hole
spec
es, in part or in w
t to the co
rrectness of i
l purpos
nform
mercia
at
om
ion
c
in t
or
his
ate
do
priv
cum
for
en
ng
t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.
ce
le
un
pt
an
d
itte
y li
rm
ab
Note
pe
ility
ot
wit
, is n
If there is water in the sight glass, drain at water drain screw -6-.
h re
hole
spec
es, in part or in w
– Open valve -3-.
t to the co
– Adjust pressure to 0.5 bar with pressure control valve -2-.
rrectness of i
Caution
l purpos
The pressure must not exceed 0.5 bar! If the pressure is too
high this can cause damage to the engine.
nform
mercia
a
com
tio
– Open valve -4- and wait until the test circuit is filled. If neces‐
n in
r
thi
s
iva
do
– Check the charge air system for leaks by listening and touch‐
r
rp
cum
ing, with commercially available leak detector spray or using
fo
cardiagn.com
en
ng