Pune Metro Project ( Line 3)

Scope Matrix

S No Description

1 General Drawings & Layout of Prefab Strucutres


Submission of Shop Drawings -Shop Drawings must show- Layout, Electrical
2 Points, AC Points with AC locations, toilet layout, Details of Windows & doors
with location, Types of Lights and location
3 Loading and Unloading of Material
4 Foundation Bolt as per approved Design
Structual Steel Section to be used as approved by TPL, Material Grade E250
5
(Only main producers make strcutral steel)
6 Submission of samples (as per technical specification) for approval
7 Supply of all Pre Fab Materials & Accessories complete in all respect

8 Transporation of all items to the site location including transit insurance

9 Provision of foundation upto plinth level


10 Suitable area for Vendor Site Offices, Stores on free of charge basis
Setting up temporary stores for all material and equipment brought in by
11
vendor
12 Supply of desired number labour, equipment and material
13 Supply of Power & Water at single point at each structure location
Distribution of Power and Water from source to desired location at each
14
structure location
15 Area Lighting
16 Accomodation/ Transportation of Vendor's Labours
17 Statutory Compliances PF / ESI etc of Contractors's Labours
18 Personal Protectives like Safety Shoes, Jackets, Helmets, Gloves etc of Vendor's
Labour
19 Insurance of Contractor's Plant, Equipment, Materials, Consumables, Spares,
Tools & Tackles etc
20 Security of all Vendor’s equipment’s, materials & manpower.
21 Maintaining safety guidelines as per Client standards.
Responsibility
TPL Agency