1. Introduction:

Hawelti Axum Polytechnic College recognizes the importance of creating sustainable and aesthetically
pleasing outdoor spaces for its students, staff, and visitors. This proposal aims to install precast
reinforced concrete benches across the college's green areas. Construction trainees will be responsible
for producing and erecting these benches during their training period, utilizing reused and different
waste materials such as steel bars.

2. Project Objectives:

- Enhance outdoor seating facilities across the green areas of Hawelti Axum Polytechnic College.

- Provide hands-on experience in precast reinforced concrete fabrication and installation for
construction trainees.

- Promote sustainability by utilizing reused and waste materials in the construction process.

- Contribute to the beautification and functionality of the college campus.

3. Scope of Work:

- Design and production of precast reinforced concrete benches suitable for outdoor use, focusing on
green areas.

- Incorporation of reused and waste materials, such as steel bars, in the bench construction process.

- Installation of benches in strategic locations across the college campus, maximizing the utilization of
green spaces.

- Training construction trainees in precast reinforced concrete fabrication techniques and sustainable
construction practices.

- Collaboration with college authorities to identify optimal bench locations within green areas.

4. Project Description:
- Design and fabrication of precast reinforced concrete benches using reused and waste materials,
such as steel bars, to promote sustainability.

- Supervision of trainees by experienced instructors to ensure quality production and installation.

- Benches designed to withstand outdoor conditions, with reinforced concrete for durability and
longevity.

- Ergonomic design considerations to enhance user comfort and experience.

- Installation carried out in accordance with safety standards and environmental preservation
principles.

5. Project Timeline:

- Preparation Phase: Conduct site assessments, finalize designs, procure materials - 1 month.

- Fabrication Phase: Prepare molds, pour reinforced concrete, cure, finish - 2 months.

- Installation Phase: Transport benches, install across green areas - 1 month.

- Training Phase: Ongoing practical training sessions for trainees throughout the project duration.

6. Budget:

- Budget allocation for materials, transportation, equipment rental, instructor fees, and other
necessary expenses.

- Detailed budget breakdown available upon request.

7. Expected Outcomes:

- Improved outdoor seating infrastructure, particularly in green areas, promoting outdoor relaxation
and social interaction.

- Enhanced skills and knowledge in precast reinforced concrete fabrication and sustainable
construction practices for trainees.

- Positive impact on the aesthetics and functionality of Hawelti Axum Polytechnic College's green
spaces.

- Promotion of sustainability through the utilization of reused and waste materials.


8. Conclusion:

The installation of precast reinforced concrete benches, incorporating reused and waste materials,
offers a valuable opportunity for practical training and sustainable campus enhancement. We anticipate
a successful project that enriches the college environment and benefits its community.

For further inquiries or discussion, please contact [Project Coordinator's Name] at [Contact Information].

Thank you for considering this proposal.

[Your Organization's Name]

[Date]