You are on page 1of 9

2.

2 KIRAAN SISTEM PAIP AGIHAN TANPA PAM

PROJECT: BANGUNAN PEJABAT STESEN JANAELEKTRIK SEKAM PADI MAJUNAKA SHEET : 1


COLD WATER ANALYSIS FOR DISTRIBUTION PIPE.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Length of pipe Head Loss
Design Design Head loss Available Residual
Point to drop + head Head Remarks residual required at
Loading Flow Pipe Dia. Velocity per 100 m in pipe
Point rise - actual eqv effective at Valve Total fitting
Units Rates pipe
15 +/- 7 (11x6)/100 (8 -14)
LU l/s mm m/s m m m m m m m m m m m
ARAS ATAS
A1 to A2 94.0 1.19 50 0.70 1.10 0.70 0.70 16.32 3.8 20.1 0.220488 0 0.220488 0.48
A2 to A3 31.0 0.64 40 0.59 1.03 0.00 0.48 0.59 5.4 6.0 0.061774 0 0.061774 0.42
A3 to A4 28.0 0.58 32 0.84 2.55 0.00 0.42 1.35 2.4 3.8 0.095559 0 0.095559 0.32
A4 to A5 26.0 0.53 32 0.77 2.16 0.00 0.32 0.92 2.4 3.3 0.071606 0 0.071606 0.25
A5 to A6 24.0 0.51 32 0.74 2.01 0.00 0.25 0.47 2.4 2.9 0.057648 0 0.057648 0.19 Remark;
A6 to A7 18.0 0.49 32 0.71 1.87 0.00 0.19 0.56 2.4 3.0 0.055215 0 0.055215 0.14 min residual head:
A7 to A8 16.0 0.42 32 0.61 1.40 0.00 0.14 0.90 2.4 3.3 0.046283 0 0.046283 0.09 at sk= 7 m
A8 to A9 8.0 0.39 32 0.56 1.22 0.00 0.09 4.18 5.6 9.8 0.119594 0 0.119594 -0.03 at WC = 10.5 m
A9 to A10 5.0 0.30 32 0.43 0.75 0.00 -0.03 1.20 2.0 3.2 0.024084 0 0.024084 -0.05 max flow velocity = 2.6 m/sec
A10 to A11 3.0 0.30 20 1.11 7.42 0.00 -0.05 1.75 0.5 2.3 0.16704 0 0.16704 -0.22 max pressure = 30 m
A11 to A12 3.0 0.30 20 1.11 7.42 3.00 2.78 3.00 0.5 3.5 0.25984 0 0.25984 2.52

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Length of pipe Head Loss
Design Design Head loss Available Residual
Point to drop + head Head Remarks residual required at
Loading Flow Pipe Dia. Velocity per 100 m in pipe
Point rise - actual eqv effective at Valve Total fitting
Units Rates pipe
15 +/- 7 (11x6)/100 (8 -14)
LU l/s mm m/s m m m m m m m m m m m
ARAS BAWAH
A1 to A2 94.0 1.19 50 0.70 1.10 0.70 0.70 16.32 3.8 20.1 0.220488 0 0.220488 0.48 Remark;
A2 to B1 57.0 0.85 40 0.79 1.74 3.60 4.08 4.47 1.1 5.6 0.097102 0 0.097102 3.98 min residual head:
B1 to B2 57.0 0.85 32 1.23 5.17 0.00 3.98 3.60 0.9 4.5 0.232561 0 0.232561 3.75 at sk= 7 m
B2 to B3 30.0 0.57 20 2.11 24.34 0.00 3.75 7.20 2.4 9.6 2.336702 0 2.336702 1.41 at WC = 10.5 m
B3 to B4 22.0 0.46 20 1.70 16.37 0.00 1.41 1.03 2.4 3.4 0.561513 0 0.561513 0.85 max flow velocity = 2.6 m/sec
B4 to B5 6.0 0.30 20 1.11 7.42 0.00 0.85 0.08 2.4 2.5 0.184115 0 0.184115 0.67 max pressure = 30 m
B5 to B6 3.0 0.30 20 1.11 7.42 0.00 0.67 5.65 3.9 9.6 0.708992 0 0.708992 -0.04
B6 to B7 3.0 0.30 20 1.11 7.42 3.00 2.96 3.00 1.0 4.0 0.29696 0 0.29696 2.66
SHEET : 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Length of pipe Head Loss
Design Design Head loss Available Residual
Point to drop + head Head Remarks residual required at
Loading Flow Pipe Dia. Velocity per 100 m in pipe
Point rise - actual eqv effective at Valve Total fitting
Units Rates pipe
15 +/- 7 (11x6)/100 (8 -14)
LU l/s mm m/s m m m m m m m m m m m
DROPPER (E, 1)
A1 to C1 3.0 0.30 50 0.18 0.09 0.70 0.70 14.12 4.2 18.3 0.015689 0 0.015689 0.68
C1 to C2 3.0 0.30 40 0.28 0.25 3.60 4.28 4.65 4.2 8.9 0.022468 0 0.022468 4.26
C2 to C3 3.0 0.30 32 0.43 0.75 3.00 7.26 3.00 4.2 7.2 0.054188 0 0.054188 7.21
A1- A2
Loading Unit
Fitting Bil Total LU length
(Per fitting)
WC 7 2 14
T 13 3 39
B 10 3 30
SH 1 3 3
AWC 4 2 8
Jumlah 94 16.32

A2- A3
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 3 2 6
T 5 3 15
B 2 3 6
SH 0 3 0
AWC 2 2 4
Jumlah 31 0.59

A3- A4
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 3 2 6
T 4 3 12
B 2 3 6
SH 0 3 0
AWC 2 2 4
Jumlah 28 1.35

A4- A5
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 2 2 4
T 4 3 12
B 2 3 6
SH 0 3 0
AWC 2 2 4
Jumlah 26 0.92

A5- A6
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 2 2 4
T 4 3 12
B 2 3 6
SH 0 3 0
AWC 1 2 2
Jumlah 24 0.47

A6- A7
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 2 2 4
T 2 3 6
B 2 3 6
SH 0 3 0
AWC 1 2 2
Jumlah 18 0.56

A7- A8
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 1 2 2
T 2 3 6
B 2 3 6
SH 0 3 0
AWC 1 2 2
Jumlah 16 0.90

A8- A9
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 1 2 2
T 1 3 3
B 1 3 3
SH 0 3 0
AWC 0 2 0
Jumlah 8 4.18

A9- A10
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 1 2 2
T 1 3 3
B 0 3 0
SH 0 3 0
AWC 0 2 0
Jumlah 5 1.20
A10- A11
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 0 2 0
T 1 3 3
B 0 3 0
SH 0 3 0
AWC 0 2 0
Jumlah 3 1.75

A11- A12 (tap)


Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 0 2 0
T 1 3 3
B 0 3 0
SH 0 3 0
AWC 0 2 0
Jumlah 3 3.00
A1- A2 length
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 7 2 14
T 13 3 39
B 10 3 30
SH 1 3 3
AWC 4 2 8
Jumlah 94 16.32

A2-B1
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 4 2 8
T 8 3 24
B 6 3 18
SH 1 3 3
AWC 2 2 4
Jumlah 57 4.47

B1 -B2
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 4 2 8
T 8 3 24
B 6 3 18
SH 1 3 3
AWC 2 2 4
Jumlah 57 3.60

B2 -B3
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 2 2 4
T 5 3 15
B 3 3 9
SH 0 3 0
AWC 1 2 2
Jumlah 30 7.20

B3 - B4
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 1 2 2
T 4 3 12
B 2 3 6
SH 0 3 0
AWC 1 2 2
Jumlah 22 1.03

B4 -B5
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 0 2 0
T 2 3 6
B 0 3 0
SH 0 3 0
AWC 0 2 0
Jumlah 6 0.08

B5 -B6
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 0 2 0
T 1 3 3
B 0 3 0
SH 0 3 0
AWC 0 2 0
Jumlah 3 5.65

B6 -B7
Loading Unit
Fitting Bil Total LU
(Per fitting)
WC 0 2 0
T 1 3 3
B 0 3 0
SH 0 3 0
AWC 0 2 0
Jumlah 3 3.00
Taylor Swift - New Romantics - Duration: 4:22. Tay
omantics - Duration: 4:22. TaylorSwiftVEVO Recommended for you

You might also like