Supply, Delivery, Installation, Upgradation and Testing of Aeronautical Ground LightingSystem at

Biratnagar Airport.
Site: Biratnagar Airport
DELIVERY AND
S.N. DESCRIPTION OF ITEM REQ. QTY. UNIT COMPLETION
SCHEDULE
SCHEDULE OF REQUIREMENTS OF
GOODS
Simple Approach Lighting System
A
(SALS)
Supply and Delivery of High Intensity, Uni-
Within 180 Days after
Directional Elevated Approach LED
1 Nos. having signed the
(white) Lights as per Technical 46.00 Contract
specification.
Supply and Delivery of Elevated type light Within 180 Days after
2 fitting base, pole, mast, etc. as per Barrette having signed the
10.00 Contract
Technical specification.
Supply and Delivery of High Intensity, Uni- Within 180 Days after
3 Directional Inset Approach LED (white) Nos. having signed the
Lights as per Technical specification. 5.00 Contract
Supply and Delivery of Inset type light
Within 180 Days after
fitting base, including concrete base,
4 Nos. having signed the
piping, excavation, etc.as per Technical 5.00 Contract
Specification.
Supply and Delivery of AGL Isolating
Within 180 Days after
Transformer 100 Watts, 6.6/6.6 Amps,
5 Nos. having signed the
Rated Primary Voltage 5 kV as per 51.00 Contract
Technical Specification
Supply and Delivery of Aeronautical
Ground Lighting (AGL) Primary Cable for
Aeronautical Lighting with rated voltage 5 Within 180 Days after
6 kV, 1x 6mm² Copper conductor, insulation meter having signed the
1,000.00 Contract
XLPE, copper screen, outer sheath XLPE as
per Technical Specification.
Supply and Delivery of Primary connector Within 180 Days after
7 kit as per Technical specification. Nos. having signed the
15.00 Contract
Within 180 Days after
Supply and Delivery of AGL Secondary
8 Rmts having signed the
Cable as per Technical Specifications 250.00 Contract
Supply and Delivery of AGL Secondary Within 180 Days after
9 connector kit as per Technical specification. Nos. having signed the
51.00 Contract
Supply and Delivery of Compact Lightning Within 180 Days after
10 Arrester as per Technical Specifications. Nos. having signed the
1.00 Contract
Supply and Delivery of Grounding rod, Within 180 Days after
11 16mm dia x 2000mm long with lead wire as Nos. having signed the
per Technical specification. 1.00 Contract
Supply and Delivery of 110 mm dia HDPE
Within 180 Days after
Pipe including socket, elbows and
12 Meter having signed the
accessories etc. as per technical 500.00 Contract
specifications
Supply and Delivery of 32 mm dia. CPVC Within 180 Days after
13 pipe laid under pavement as per Technical having signed the
40.00 Rmts Contract
specification.
Supply and Delivery of cable protection Within 180 Days after
14 mesh as per technical specification Meter having signed the
500.00 Contract
Runway Threshold Identification Light
B
(RTIL)
Supply and Delivery of Runway Threshold Within 180 Days after
1 Identification Light (RTIL) as per Technical Nos. having signed the
4.00 Contract
specification.
Supply and Delivery of Armoured Power Within 180 Days after
2 Cable 4X10 mm² for RTIL-27 as per meter having signed the
1,000.00 Contract
Technical specification.
Supply and Delivery of Armoured Power Within 180 Days after
3 Cable 4X10 mm² for RTIL-09 as per meter having signed the
Technical specification. 1,400.00 Contract
Supply and Delivery of Armoured Control Within 180 Days after
4 Cable 10 cores for RTIL-27 as per meter having signed the
Technical specification. 1,400.00 Contract
Supply and Delivery of Armoured Control Within 180 Days after
5 Cable 10 cores for RTIL-09 as per meter having signed the
Technical specification. 1,000.00 Contract
Supply and Delivery of Cable Protection Within 180 Days after
6 mesh as per Technical specification. meter having signed the
2,400.00 Contract
Supply and Delivery of 1x110 mm dia Rmts Within 180 Days after
7 PVC pipe as per Technical specification. Rmts having signed the
2,400.00 Contract
Supply and Delivery of Grounding rod,
16mm diameter x 2000mm long with lead Within 180 Days after
8 wire for Grounding of RTIL Lights as per having signed the
4.00 Nos. Contract
Technical Specification.
Runway Edge Lights (REDL), Runway
C Turnpad Lights and Runway End Lights
(RENL)
Supply and Delivery of High Intensity, Bi-
Directional Elevated Runway Edge LED Within 180 Days after
1 (yellow/Red) Lights with frangible tripod Nos having signed the
10.00 Contract
stand complete set as per Technical
specification.
Supply and Delivery of High Intensity, Bi-
Directional Elevated Runway Edge LED
Within 180 Days after
(yellow) module set for replacing
2 Set having signed the
(White/White) Runway Edge Light into 26.00 Contract
(Yellow/white) as per technical
Specification as per Technical specification.
Supply and Delivery of High Intensity, Uni-
Directional Elevated Runway END LED Within 180 Days after
3 (Red) Lights with Base complete set as per Nos having signed the
12.00 Contract
Technical specification.
Supply and Delivery of Omni Directional
Within 180 Days after
Turning Pad Elevated LED Light with
4 Nos having signed the
frangible tripod stand complete set as per 10.00 Contract
Technical specification.
Supply and Delivery of High Intensity, Bi-
Directional Inset Runway Edge LED Within 180 Days after
5 (yellow/Red) Lights with Base complete set Nos having signed the
2.00 Contract
as per Technical specification.
Supply and Delivery of High Intensity, Bi-
Directional Inset Runway Edge LED Within 180 Days after
6 (yellow/white) Lights with Base complete Nos having signed the
2.00 Contract
set as per Technical specification.
Supply and Delivery of High Intensity, Bi-
Within 180 Days after
Directional Inset Runway Edge LED
7 Nos having signed the
(white/white) Lights with Base complete set 1.00 Contract
as per Technical specification.
Supply and Delivery of Elevated type light Within 180 Days after
8 fitting base as per technical specification Nos having signed the
32.00 Contract
Supply and Delivery of Inset type light Within 180 Days after
9 fitting base as per technical specification Nos having signed the
5.00 Contract
Supply and Delivery of AGL Isolating
Transformer 100 Watts, 6.6/6.6 Amps, Within 180 Days after
10 Rated Primary Voltage 5 kV as per Nos having signed the
27.00 Contract
Technical Specification
Supply and Delivery of AGL Isolating
Within 180 Days after
Transformer 45 Watts, 6.6/6.6 Amps, Rated
11 10.00 having signed the
Primary Voltage 5 kV as per Technical Nos Contract
Specification
Supply and Delivery of Aeronautical
Ground Lighting (AGL) Primary Cable for
Within 180 Days after
Aeronautical Lighting with rated voltage 5
12 meter having signed the
kV, 1x 6mm² Copper conductor, insulation 1,450.00 Contract
XLPE, copper screen, outer sheath XLPE as
per Technical Specification.
Supply and Delivery of AGL Primary Within 180 Days after
13 Connector Kit as per Technical Nos having signed the
43.00 Contract
Specifications
Supply and Delivery of AGL secondary Within 180 Days after
14 cable connector kit as per technical Set having signed the
37.00 Contract
specification
Supply and Delivery of Lightning Arrester Within 180 Days after
15 as per Technical Specification Nos having signed the
2.00 Contract
Supply and Delivery of Grounding rod, Within 180 Days after
16 16mm diameter x 2000mm long with lead Nos having signed the
wire for as per Technical Specification. 2.00 Contract
Supply and Delivery of AGL Secondary Within 180 Days after
17 Cable as per Technical Specifications Rmts having signed the
200.00 Contract
Supply and Delivery of 110 mm dia HDPE
Within 180 Days after
Pipe including socket, elbows and
18 Rmts having signed the
accessories etc. as per technical 700.00 Contract
specifications
Supply and Delivery of cable protection Within 180 Days after
19 mesh as per technical specification Rmts having signed the
700.00 Contract
Supply and Delivery of 32mm Dia CPVC Within 180 Days after
20 pipe laid under pavement as per technical having signed the
specification 30.00 Rmts Contract
D Runway Threshold Light (RTHL)
Re-arrangement of Existing Runway Within 550 Days after
1 Threshold lights as per Technical Nos having signed the
12.00 Contract
specification.
Supply and Delivery of CPVC pipe 32 mm
dia. laid under pavement as per Technical Within 180 Days after
2 specification. 40.00 Rmts having signed the
Contract

E Others Goods
Supply and Delivery of 16m Apron Flood Within 180 Days after
1 Light Mast as per Technical Specification. Nos. having signed the
1.00 Contract
Supply and Delivery of LED AC Within 180 Days after
2 Obstruction Light for Flood Light Masts as Nos having signed the
per Technical Specification 1.00 Contract
Supply and Delivery of Apron Flood LED Within 180 Days after
3 Light Set as per Technical Specification. having signed the
3.00 Nos Contract
Supply and Delivery of Signal Light Gun as Within 180 Days after
4 per Technical Specification. Nos. having signed the
1.00 Contract
Supply and Delivery of Illuminated Wind Within 180 Days after
5 Direction Indicator as per Technical Nos. having signed the
3.00 Contract
Specification
Supply and Delivery of AGL Isolating
Transformer 150 Watts, 6.6/6.6 Amps. Within 180 Days after
6 Rated Primary Voltage 5kV as per Nos. having signed the
3.00 Contract
Technical Specification
Supply and Delivery of Armoured Power Within 180 Days after
7 Cable, 4 x 4mm2 for Apron Flood Light as Rmts having signed the
per Technical Specification 260.00 Contract
Supply and Delivery of Primary Connector Within 180 Days after
8 Kit as per Technical Specifications having signed the
6.00 Nos Contract
Supply and Delivery of AGL Secondary Within 180 Days after
9 Connector Kit as per Technical Set having signed the
160.00 Contract
Specification.
Supply and Delivery of Aeronautical
Ground Lighting (AGL) Primary Cable for
Aeronautical Lighting with rated voltage 5 Within 180 Days after
10 kV, 1x 6mm² Copper conductor, insulation rmts having signed the
400.00 Contract
XLPE, copper screen, outer sheath XLPE as
per Technical Specification.

Supply and Delivery of Secondary cables as Within 180 Days after


11 per technical specification rmts having signed the
50.00 Contract
Supply and Delivery of 110 mm dia HDPE
Within 180 Days after
Pipe including socket, elbows and
12 having signed the
accessories etc. as per technical 160.00 Meter Contract
specifications
Supply and Delivery of cable protection Within 180 Days after
13 mesh as per technical specification having signed the
160.00 Meter Contract
Upgradation and Improvement of PLC Within 180 Days after
14 Panel including upgradation of PLC Job having signed the
Components as per Technical Specification. 1.00 Contract
Supply and Delivery of spare parts
adequate for three years of smooth Within 180 Days after
15 operation and maintenance of system under Lot having signed the
1.00 Contract
normal operating condition as per attached
Appendix C
F Installation Work and Services
Installation of Elevated Approach LED Within 550 Days after
1 Lights as per Technical specification. having signed the
46.00 Nos. Contract
Installation of Inset Approach, Runway
Within 550 Days after
Edge LED Lights including Coring, Saw
2 Nos. having signed the
Cutting, Epoxy/Resin as per Technical 10.00 Contract
specification.
Installation of Elevated Runway Edge,
Runway End, Turnpad, Taxiway Edge LED Within 550 Days after
3 Lights including concrete light block as per Nos. having signed the
32.00 Contract
Technical specification.
Installation of Barrette type Pole/Mast with Within 550 Days after
4 concrete foundation as per requirement as Nos. having signed the
per technical specification 10.00 Contract
Modification of existing White/White Within 550 Days after
5 Runway Edge Light with Yellow LED Light Nos. having signed the
Modules as per technical specification 26.00 Contract
Installation of Isolating transformer 150W Within 550 Days after
6 as per technical specification Nos. having signed the
3.00 Contract
Installation of Isolating transformer 100W Within 550 Days after
7 as per technical specification Nos. having signed the
78.00 Contract
Installation of Isolating transformer 45W as Within 550 Days after
8 per technical specification Nos. having signed the
10.00 Contract
Installation of primary cable connector kit Within 550 Days after
9 as per technical specification having signed the
64.00 Nos. Contract
Installation of Secondary cable connector Within 550 Days after
10 kit as per technical specification Nos. having signed the
91.00 Contract
Installation of Lightning Arrester as per Within 550 Days after
11 Technical Specification Set having signed the
3.00 Contract
Installation of Grounding rod, 16mm Within 550 Days after
12 diameter x 2000mm long with lead wire as Set having signed the
per technical specification 7.00 Contract
Installation and laying of Primary Cable as Within 550 Days after
13 per Technical Specification having signed the
2,850.00 Rmts Contract
Installation and laying of Secondary Cable Within 550 Days after
14 as per Technical Specification Rmts having signed the
500.00 Contract
Installation of 110 mm dia HDPE Pipe Within 550 Days after
15 including socket, elbows and accessories Rmts having signed the
etc. as per technical specifications 3,760.00 Contract
Installation of cable protection mesh as per Within 550 Days after
16 technical specification Rmts having signed the
3,760.00 Contract
Installation of CPVC pipe 32 mm inside
Within 550 Days after
diameter laid under pavement, including
17 meter having signed the
trench excavation (80 x 100mm deep), 70.00 Contract
backfill with sand and epoxy. etc.
Installation of Runway Threshold
Identification Light (RTIL) System including Within 550 Days after
18 concrete foundation as per Technical Nos. having signed the
4.00 Contract
Specification.
Installation of Armoured Power Cable, 4 x Within 550 Days after
19 10mm2 for RTIL as per Technical having signed the
2,400.00 Rmts Contract
Specification
Installation of Armoured Control Cable, 10 Within 550 Days after
20 Cores for RTIL as per Technical Rmts having signed the
2,400.00 Contract
Specifications
Installation of High Mast Apron Flood LED Within 550 Days after
21 Light System as per Technical Specification Nos. having signed the
1.00 Contract
Installation of Signal Light Gun Set as per Within 550 Days after
22 Technical Specification. Nos. having signed the
1.00 Contract
Installation of Illuminated Wind Direction Within 550 Days after
23 Indicator (IWDI) as per Technical having signed the
3.00 Nos. Contract
Specification.
Installation and laying of Armoured Power Within 550 Days after
24 Cable, 4 x 4mm2 for Apron Flood Light as meter having signed the
per Technical Specification 260.00 Contract
Construction of R.C.C. Isolating
Transformer Chamber and metallic cover
with flushed metallic handles inclusive of Within 550 Days after
25 10cm sand bedding at the bottom as per Nos having signed the
61.00 Contract
Technical Specification and Drawing.
Mixture proportion of Cement/Sand/Coarse
aggregate at 1:1.5:3.
Construction of R.C.C.
Lightening arrestor Chamber and metallic
cover with flushed metallic handles Within 550 Days after
26 inclusive of 10cm sand bedding at the Nos having signed the
3.00 Contract
bottom as per Technical Specification
and Drawing. Mixture proportion of
Cement/Sand/Coarse aggregate at 1:1.5:3.
Civil Works (Earthwork Excavation, Within 550 Days after
27 Backfillings as per Technical Specification. Lot having signed the
1.00 Contract
Within 550 Days after
Maintenance of illuminated taxiing
28 Lot having signed the
guidance signage system 1.00 Contract
Survey, Alignment, Testing and Within 550 Days after
29 Commissioning of Aeronautical Ground Job having signed the
1.00 Contract
Lighting System.