Site: Biratnagar Airport
DELIVERY AND
S.N. DESCRIPTION OF ITEM REQ. QTY. UNIT COMPLETION
SCHEDULE
SCHEDULE OF REQUIREMENTS OF
GOODS
Simple Approach Lighting System
A
(SALS)
Supply and Delivery of High Intensity, Uni-
Within 180 Days after
Directional Elevated Approach LED
1 Nos. having signed the
(white) Lights as per Technical 46.00 Contract
specification.
Supply and Delivery of Elevated type light Within 180 Days after
2 fitting base, pole, mast, etc. as per Barrette having signed the
10.00 Contract
Technical specification.
Supply and Delivery of High Intensity, Uni- Within 180 Days after
3 Directional Inset Approach LED (white) Nos. having signed the
Lights as per Technical specification. 5.00 Contract
Supply and Delivery of Inset type light
Within 180 Days after
fitting base, including concrete base,
4 Nos. having signed the
piping, excavation, etc.as per Technical 5.00 Contract
Specification.
Supply and Delivery of AGL Isolating
Within 180 Days after
Transformer 100 Watts, 6.6/6.6 Amps,
5 Nos. having signed the
Rated Primary Voltage 5 kV as per 51.00 Contract
Technical Specification
Supply and Delivery of Aeronautical
Ground Lighting (AGL) Primary Cable for
Aeronautical Lighting with rated voltage 5 Within 180 Days after
6 kV, 1x 6mm² Copper conductor, insulation meter having signed the
1,000.00 Contract
XLPE, copper screen, outer sheath XLPE as
per Technical Specification.
Supply and Delivery of Primary connector Within 180 Days after
7 kit as per Technical specification. Nos. having signed the
15.00 Contract
Within 180 Days after
Supply and Delivery of AGL Secondary
8 Rmts having signed the
Cable as per Technical Specifications 250.00 Contract
Supply and Delivery of AGL Secondary Within 180 Days after
9 connector kit as per Technical specification. Nos. having signed the
51.00 Contract
Supply and Delivery of Compact Lightning Within 180 Days after
10 Arrester as per Technical Specifications. Nos. having signed the
1.00 Contract
Supply and Delivery of Grounding rod, Within 180 Days after
11 16mm dia x 2000mm long with lead wire as Nos. having signed the
per Technical specification. 1.00 Contract
Supply and Delivery of 110 mm dia HDPE
Within 180 Days after
Pipe including socket, elbows and
12 Meter having signed the
accessories etc. as per technical 500.00 Contract
specifications
Supply and Delivery of 32 mm dia. CPVC Within 180 Days after
13 pipe laid under pavement as per Technical having signed the
40.00 Rmts Contract
specification.
Supply and Delivery of cable protection Within 180 Days after
14 mesh as per technical specification Meter having signed the
500.00 Contract
Runway Threshold Identification Light
B
(RTIL)
Supply and Delivery of Runway Threshold Within 180 Days after
1 Identification Light (RTIL) as per Technical Nos. having signed the
4.00 Contract
specification.
Supply and Delivery of Armoured Power Within 180 Days after
2 Cable 4X10 mm² for RTIL-27 as per meter having signed the
1,000.00 Contract
Technical specification.
Supply and Delivery of Armoured Power Within 180 Days after
3 Cable 4X10 mm² for RTIL-09 as per meter having signed the
Technical specification. 1,400.00 Contract
Supply and Delivery of Armoured Control Within 180 Days after
4 Cable 10 cores for RTIL-27 as per meter having signed the
Technical specification. 1,400.00 Contract
Supply and Delivery of Armoured Control Within 180 Days after
5 Cable 10 cores for RTIL-09 as per meter having signed the
Technical specification. 1,000.00 Contract
Supply and Delivery of Cable Protection Within 180 Days after
6 mesh as per Technical specification. meter having signed the
2,400.00 Contract
Supply and Delivery of 1x110 mm dia Rmts Within 180 Days after
7 PVC pipe as per Technical specification. Rmts having signed the
2,400.00 Contract
Supply and Delivery of Grounding rod,
16mm diameter x 2000mm long with lead Within 180 Days after
8 wire for Grounding of RTIL Lights as per having signed the
4.00 Nos. Contract
Technical Specification.
Runway Edge Lights (REDL), Runway
C Turnpad Lights and Runway End Lights
(RENL)
Supply and Delivery of High Intensity, Bi-
Directional Elevated Runway Edge LED Within 180 Days after
1 (yellow/Red) Lights with frangible tripod Nos having signed the
10.00 Contract
stand complete set as per Technical
specification.
Supply and Delivery of High Intensity, Bi-
Directional Elevated Runway Edge LED
Within 180 Days after
(yellow) module set for replacing
2 Set having signed the
(White/White) Runway Edge Light into 26.00 Contract
(Yellow/white) as per technical
Specification as per Technical specification.
Supply and Delivery of High Intensity, Uni-
Directional Elevated Runway END LED Within 180 Days after
3 (Red) Lights with Base complete set as per Nos having signed the
12.00 Contract
Technical specification.
Supply and Delivery of Omni Directional
Within 180 Days after
Turning Pad Elevated LED Light with
4 Nos having signed the
frangible tripod stand complete set as per 10.00 Contract
Technical specification.
Supply and Delivery of High Intensity, Bi-
Directional Inset Runway Edge LED Within 180 Days after
5 (yellow/Red) Lights with Base complete set Nos having signed the
2.00 Contract
as per Technical specification.
Supply and Delivery of High Intensity, Bi-
Directional Inset Runway Edge LED Within 180 Days after
6 (yellow/white) Lights with Base complete Nos having signed the
2.00 Contract
set as per Technical specification.
Supply and Delivery of High Intensity, Bi-
Within 180 Days after
Directional Inset Runway Edge LED
7 Nos having signed the
(white/white) Lights with Base complete set 1.00 Contract
as per Technical specification.
Supply and Delivery of Elevated type light Within 180 Days after
8 fitting base as per technical specification Nos having signed the
32.00 Contract
Supply and Delivery of Inset type light Within 180 Days after
9 fitting base as per technical specification Nos having signed the
5.00 Contract
Supply and Delivery of AGL Isolating
Transformer 100 Watts, 6.6/6.6 Amps, Within 180 Days after
10 Rated Primary Voltage 5 kV as per Nos having signed the
27.00 Contract
Technical Specification
Supply and Delivery of AGL Isolating
Within 180 Days after
Transformer 45 Watts, 6.6/6.6 Amps, Rated
11 10.00 having signed the
Primary Voltage 5 kV as per Technical Nos Contract
Specification
Supply and Delivery of Aeronautical
Ground Lighting (AGL) Primary Cable for
Within 180 Days after
Aeronautical Lighting with rated voltage 5
12 meter having signed the
kV, 1x 6mm² Copper conductor, insulation 1,450.00 Contract
XLPE, copper screen, outer sheath XLPE as
per Technical Specification.
Supply and Delivery of AGL Primary Within 180 Days after
13 Connector Kit as per Technical Nos having signed the
43.00 Contract
Specifications
Supply and Delivery of AGL secondary Within 180 Days after
14 cable connector kit as per technical Set having signed the
37.00 Contract
specification
Supply and Delivery of Lightning Arrester Within 180 Days after
15 as per Technical Specification Nos having signed the
2.00 Contract
Supply and Delivery of Grounding rod, Within 180 Days after
16 16mm diameter x 2000mm long with lead Nos having signed the
wire for as per Technical Specification. 2.00 Contract
Supply and Delivery of AGL Secondary Within 180 Days after
17 Cable as per Technical Specifications Rmts having signed the
200.00 Contract
Supply and Delivery of 110 mm dia HDPE
Within 180 Days after
Pipe including socket, elbows and
18 Rmts having signed the
accessories etc. as per technical 700.00 Contract
specifications
Supply and Delivery of cable protection Within 180 Days after
19 mesh as per technical specification Rmts having signed the
700.00 Contract
Supply and Delivery of 32mm Dia CPVC Within 180 Days after
20 pipe laid under pavement as per technical having signed the
specification 30.00 Rmts Contract
D Runway Threshold Light (RTHL)
Re-arrangement of Existing Runway Within 550 Days after
1 Threshold lights as per Technical Nos having signed the
12.00 Contract
specification.
Supply and Delivery of CPVC pipe 32 mm
dia. laid under pavement as per Technical Within 180 Days after
2 specification. 40.00 Rmts having signed the
Contract
E Others Goods
Supply and Delivery of 16m Apron Flood Within 180 Days after
1 Light Mast as per Technical Specification. Nos. having signed the
1.00 Contract
Supply and Delivery of LED AC Within 180 Days after
2 Obstruction Light for Flood Light Masts as Nos having signed the
per Technical Specification 1.00 Contract
Supply and Delivery of Apron Flood LED Within 180 Days after
3 Light Set as per Technical Specification. having signed the
3.00 Nos Contract
Supply and Delivery of Signal Light Gun as Within 180 Days after
4 per Technical Specification. Nos. having signed the
1.00 Contract
Supply and Delivery of Illuminated Wind Within 180 Days after
5 Direction Indicator as per Technical Nos. having signed the
3.00 Contract
Specification
Supply and Delivery of AGL Isolating
Transformer 150 Watts, 6.6/6.6 Amps. Within 180 Days after
6 Rated Primary Voltage 5kV as per Nos. having signed the
3.00 Contract
Technical Specification
Supply and Delivery of Armoured Power Within 180 Days after
7 Cable, 4 x 4mm2 for Apron Flood Light as Rmts having signed the
per Technical Specification 260.00 Contract
Supply and Delivery of Primary Connector Within 180 Days after
8 Kit as per Technical Specifications having signed the
6.00 Nos Contract
Supply and Delivery of AGL Secondary Within 180 Days after
9 Connector Kit as per Technical Set having signed the
160.00 Contract
Specification.
Supply and Delivery of Aeronautical
Ground Lighting (AGL) Primary Cable for
Aeronautical Lighting with rated voltage 5 Within 180 Days after
10 kV, 1x 6mm² Copper conductor, insulation rmts having signed the
400.00 Contract
XLPE, copper screen, outer sheath XLPE as
per Technical Specification.