You are on page 1of 6

CLASS CODE: 3898/3899 SEMESTER ENROLLED: First Semester

ID NUMBER: 2212683
NAME: RAMONES, SAMUEL

MONTHLY REPORT FOR NOVEMBER 2023

DATE: 03 January 2024

TIME: 8:00am - 5:00pm

ACTIVITIES: Site inspection and inventory of materials

DESCRIPTION:
We have been assigned to complete an in-depth evaluation of the Abenoja Project, focusing on external wall
plastering while maintaining accurate records of all materials used.

DOCUMENTATION:

DATE: 04 January 2024


TIME: 8:00am - 5:00pm

ACTIVITIES: Site Inspection

DESCRIPTION:
We have been charged with thoroughly investigating the Abenoja Project's previous work in plastering external
walls.

DOCUMENTATION:

DATE: 05 January 2024

TIME: 8:00am - 5:00pm

ACTIVITIES: Office Works


DESCRIPTION:
I am tasked with undertaking a STAAD analysis for a forthcoming project. My knowledge will be used with the
architect's objective to create a design that meets customer criteria and is structurally sound.

DOCUMENTATION:

DATE: 08 January 2024

TIME: 8:00am - 5:00pm

ACTIVITIES: Office Works

DESCRIPTION:
Due to my limited practical experience, I require assistance continuing the STAAD analysis of a future project.
Specifically, I need assistance making educated material selections, particularly in terms of practicality and
availability for the truss design. However, I understand the importance of cooperation and am excited to debate
design and material possibilities with our experienced Engineer.
DOCUMENTATION:

DATE: 09 January 2024

TIME: 8:00am - 5:00pm

ACTIVITIES: Office Works

DESCRIPTION:
I've finished the essential load application step for the forthcoming project's STAAD study. This involves including
wind, seismic, dead, and live loads into appropriate design rules and project requirements.

DOCUMENTATION:
DATE: 10 January 2024

TIME: 8:00am - 5:00pm

ACTIVITIES: Site Inspection

DESCRIPTION:
We have been entrusted with undertaking a thorough examination of the Abenoja Project, particularly emphasising
the feasibility and implications of continuing building operations on the roof deck.

DOCUMENTATION:
I, pledge on my honor, that I have not given or received any assistance on this assignment

You might also like