Professional Documents
Culture Documents
ID NUMBER: 2212683
NAME: RAMONES, SAMUEL
DESCRIPTION:
We have been assigned to complete an in-depth evaluation of the Abenoja Project, focusing on external wall
plastering while maintaining accurate records of all materials used.
DOCUMENTATION:
DESCRIPTION:
We have been charged with thoroughly investigating the Abenoja Project's previous work in plastering external
walls.
DOCUMENTATION:
DOCUMENTATION:
DESCRIPTION:
Due to my limited practical experience, I require assistance continuing the STAAD analysis of a future project.
Specifically, I need assistance making educated material selections, particularly in terms of practicality and
availability for the truss design. However, I understand the importance of cooperation and am excited to debate
design and material possibilities with our experienced Engineer.
DOCUMENTATION:
DESCRIPTION:
I've finished the essential load application step for the forthcoming project's STAAD study. This involves including
wind, seismic, dead, and live loads into appropriate design rules and project requirements.
DOCUMENTATION:
DATE: 10 January 2024
DESCRIPTION:
We have been entrusted with undertaking a thorough examination of the Abenoja Project, particularly emphasising
the feasibility and implications of continuing building operations on the roof deck.
DOCUMENTATION:
I, pledge on my honor, that I have not given or received any assistance on this assignment