You are on page 1of 1

C/L OF PRO.

AULIAGANJ
STATION
AT CH: 400+521.875
START OF YARD

317m

END OF YARD
158.5m 158.5m
UP DN
PARBATIPUR STATION
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW

KAUNIA STATION

ROW

ROW
NO. 19G

NO. 20G
BRIDGE

BRIDGE
PROP. STATION

16.7m
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW BUILDING ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
14.6m

15.2m
LCC GATE E-14G

LCC GATE E-15G


PROP. PLATFORM(450m x 10m)
12 # 12 #
PRO. DG LOOP LINE

5.3m
FM FM
PRO. DG MAIN LINE (EXISTING MG MAIN LINE)
12 # 12 #
11.6m

12.2m
C/L OF EXISTING AULIAGANJ
13.7m

ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
STATION
AT CH: : 400+260.000 (AS PER TENDER)

ROW
ROW

AT CH: : ....................... (AS PER SURVEY)


ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW

YARD PLAN

LEGEND :
ROW EXISTING RAILWAY BOUNDARY LINE
PROPOSED RAILWAY BOUNDARY LINE
PROPOSED RAILWAY LINE
EXISTING RAILWAY LINE TO BE DISMANTLED

AULIAGANJ DRAWING NO.


NOTE :
Existing ROW Shown in drawing Reproduced as per ROW shown in pocket section book only for the purpose of representation and purely tentative. AULIAGANJ - OPTION 1-01
Existing ROW will be confirmed at site and to be finilased as per mouza map by concerned person dealing with land aquisation.
YARD LAYOUT PLAN
Proposed ROW Shown in drawing is tentative and prapared as per the preliminary design drawing. (AUL- 01 FOR Scale = N.T.S
Proposed ROW Could be finalised after finilisation of existing ROW.
ALIGNMENT OPTION 1) REV. - R0

You might also like